Skills Progression Map¶
How capability develops across the course: five levels, from recognising the vocabulary to running a project end to end. Use it to see where you are, what comes next, and — most usefully — to work out what to revise.
At a glance
- Levels: 5, plus the capstone as the integration test
- Each level is gated by a "can do" checklist and an artefact
- How to use it: find the highest level you can honestly complete, then study the one above it
The capability ladder¶
flowchart TD
accTitle: Five capability levels and the capstone
accDescr {
Level 1 Foundation, which speaks the vocabulary, leads to Level 2 Planner, which can plan a
bounded project, then Level 3 Adaptive planner, which can choose and justify an approach, Level
4 Controller, which can run and control a live project, and Level 5 Professional practitioner,
which can operate beyond the team. The Capstone Integrator level demonstrates all five on one
project.
}
L1["Level 1 · Foundation<br/>Speaks the vocabulary"] --> L2
L2["Level 2 · Planner<br/>Can plan a bounded project"] --> L3
L3["Level 3 · Adaptive planner<br/>Can choose and justify an approach"] --> L4
L4["Level 4 · Controller<br/>Can run and control a live project"] --> L5
L5["Level 5 · Professional practitioner<br/>Can operate beyond the team"] --> C
C["Capstone · Integrator<br/>Demonstrates all five on one project"]
Each level builds on the one below. Levels are not merely more topics — they are different kinds of capability: knowing, planning, choosing, controlling, and finally operating in a professional context.
Level 1 — Foundation¶
Speaks the vocabulary and can tell what kind of work is in front of them.
| Modules | 01–02 |
| Sessions | S1–S6 |
Can do:
- Define a project, and distinguish it from operations, a programme, and a portfolio.
- Explain three ways a software project differs from projects in other disciplines.
- Compare predictive, iterative, incremental, and adaptive life cycles.
- Identify stakeholders and analyse their influence and interest.
- Describe the governance path that authorises and changes a project.
- Write a business case and a project charter from a one-paragraph idea.
Evidence: a project charter and a stakeholder register.
Self-check: Foundations quiz, plus the Lab 01 rubric.
Level 2 — Planner¶
Can take a bounded scope and turn it into a consistent plan.
| Modules | 03, 05, 06, 07 |
| Sessions | S7, S11–S16 |
Can do:
- Explain how scope, schedule, cost, and quality constrain one another, and show it on one page.
- Elicit and write verifiable requirements, separating functional from non-functional.
- Decompose scope into a work breakdown structure without gaps or overlap.
- Build a network diagram, identify the critical path, and calculate float.
- Produce a Gantt-style schedule and justify or reject compression.
- Estimate effort and cost with two independent techniques, and express the result as a range.
- Build a budget with an explicit contingency reserve.
Evidence: a scope baseline, a WBS, a schedule with a critical path, and a cost estimate with a stated uncertainty range.
Self-check: the mid-course checkpoint self-audit — every artefact must agree with the one before it.
Level 3 — Adaptive planner¶
Can choose a delivery approach and justify it, rather than defaulting to one.
| Modules | 04 |
| Sessions | S8–S10 |
Can do:
- State the agile values and principles and what each implies for how a team works.
- Describe the Scrum roles, events, and artefacts and how they reinforce one another.
- Apply Kanban — visualised work, explicit policies, and work-in-progress limits — to a flow of work.
- Argue for either predictive or adaptive delivery on a specific project, using evidence.
- Name three common misapplications of agile and predict their consequences.
Evidence: a product backlog, an iteration plan, and a short written justification of your chosen approach.
Self-check: compare your iteration plan with the predictive plan you built at Level 2 and explain each difference.
Level 4 — Controller¶
Can run a project that is already moving, and say honestly how it is going.
| Modules | 08–11 |
| Sessions | S18–S24 |
Can do:
- Identify risks systematically and maintain a risk register with owners, triggers, and responses — including at least one opportunity.
- Write quality criteria and design a proportionate review-and-test strategy.
- Explain verification versus validation, and place each in a delivery process.
- Construct a RACI matrix and a communications plan.
- Select metrics that inform decisions, and explain how each could be gamed.
- Interpret variance and produce an honest status report.
- Run a change request through a defined approval path instead of absorbing the change.
Evidence: a risk register, a quality strategy, a RACI and communications plan, a status report with variance analysis, and a completed change request.
Self-check: take your own status report and try to disprove it. If you cannot, it is either accurate or insufficiently specific.
Level 5 — Professional practitioner¶
Can operate beyond your own team and beyond delivery day.
| Modules | 12 |
| Sessions | S25–S29 |
Can do:
- Describe the procurement cycle, select a contract shape for a piece of work, and name the risks the contract does not remove.
- Produce the documentation a project needs and explain what a handover pack must contain.
- Design a coordination approach for a distributed team and identify its additional costs.
- Analyse an ethical dilemma and justify a course of action that you would defend publicly.
- Run a project closure and capture lessons learned that a colleague could act on.
- Explain how programme and portfolio governance can redirect an individual project, and why that is not a failure of project management.
Evidence: a closure pack (documentation, lessons learned, post-implementation review) and a short ethical case analysis.
Self-check: explain to someone outside the course why closing a project properly matters. If the answer is "paperwork", go back to Module 12.
Capstone — Integrator¶
Demonstrates Levels 1–5 on one real project, not in isolation.
| Modules | 13 |
| Sessions | S30–S32 (with milestones from S6 onward) |
Can do:
- Assemble one internally consistent project record, from charter to post-implementation review.
- Control the project against an agreed baseline and report variance honestly.
- Show that your artefacts agree with one another — the charter's scope matches the WBS, the risks in the register appear in the reports, the retrospective cites real evidence.
- Explain every significant decision you made, and what you would do differently.
Evidence: the capstone artefact set. Rubric planned — see Module 13 — Capstone Project.
Self-check: the "could a stranger act on this?" test from How to Self-Assess, applied to every artefact.
Cross-cutting skills¶
Some skills are not tied to one level. They develop continuously and are assessed inside the labs.
| Skill | First appears | Grows through | Evidence |
|---|---|---|---|
| Writing for a decision-maker | Level 1 (charter) | Every lab | Documents another person can act on |
| Reasoning under uncertainty | Level 2 (estimates) | Risk, control | Ranges, reserves, risk responses |
| Honest reporting | Level 4 (status reports) | Facility, closure | Bad news disclosed early |
| Analytical judgement | Level 1 (case studies) | Every module | Case-study answers |
| Explaining a trade-off | Level 2 (constraints) | Advanced practice | Written justifications |
Level → module → session summary¶
| Level | Modules | Sessions | Artefact produced | Checked by |
|---|---|---|---|---|
| 1 Foundation | 01–02 | S1–S6 | Charter, stakeholder register | Foundations quiz, Lab 01 rubric |
| 2 Planner | 03, 05, 06, 07 | S7, S11–S16 | Scope baseline, WBS, schedule, estimate | Mid-course checkpoint audit |
| 3 Adaptive planner | 04 | S8–S10 | Backlog, iteration plan, approach justification | Comparison with the predictive plan |
| 4 Controller | 08–11 | S18–S24 | Risk register, quality plan, RACI, status report, change request | Module quizzes, status-report check |
| 5 Professional practitioner | 12 | S25–S29 | Closure pack, ethical analysis | Retrospective guidance |
| Integrator | 13 | S30–S32 | One coherent project record | Capstone rubric |
How to use this map¶
To progress: do not move to the next level until you can honestly tick every "can do" statement at the current one. The checklist is a gate, not a suggestion — later levels assume earlier capability.
To revise: work backwards. Find the highest level where you can tick everything, and study the level above it. This is far more efficient than re-reading the whole course.
To self-assess a lab: pick the level the lab belongs to and read its "can do" list. If you cannot tick an item, the lab is not finished, however polished the document looks.
What this map is not
These levels describe the course's outcomes. They are not a professional certification, and completing the course does not make anyone a senior project manager. Experience, judgement under pressure, and accountability for real consequences are earned on real projects, not in a course. What the course can do is give you the vocabulary, the techniques, and the habits of mind to learn from that experience faster.