Quiz Template¶
This page exists so the navigation has a stable home for the assessment template.
The full template for writing a quiz is maintained once, in Templates → Assessment Template, to avoid duplicating the same structure in two places.
Quick reference¶
A quiz page must contain:
- An At a glance admonition (module, number of questions, estimated time).
- A How to use this quiz section telling students to answer before revealing.
- Three parts — Vocabulary, Application, Judgement.
- Every answer hidden behind
??? note "Answer". - A Scoring guide with an interpretation.
- An If you scored low section linking back to the relevant lessons.
See the worked example — Quiz — Foundations — and the full Assessment Template.
When you add a quiz, also:
- add it to
docs/self-assessment/index.md, and - add it to the
navinmkdocs.yml.