Labs

Labs are where this course becomes practical. Each lab has you produce a real project management artefact — or a real calculation — and then mark your own work against stated criteria.

Reading about a charter teaches you the vocabulary. Writing one teaches you the discipline.

Why labs matter

Project management is a practice, not a body of facts. You can memorise the parts of a risk register and still produce a useless one. The labs force the decisions — what to include, what to leave out, how to justify the boundary, which number to trust — that are the actual skill.

Labs also put you in a role. You are rarely the person with complete information, and often the person who must say something unwelcome to someone senior. That is what the work is like.

The lab programme

25 labs, in three levels, each tied to a course module and to a scenario from the example-project library.

Level Labs What you do
Beginner 01–06 Produce the artefacts that define a project: charter, stakeholder map, vision, constraints, register, scope statement
Intermediate 07–15 Plan it: WBS, schedule, dependencies, Gantt chart, risk register, communication plan, estimate, backlog, sprint
Advanced 16–25 Control and defend it: compression trade-offs, risk responses, earned value, change evaluation, quality cost, resource conflicts, monitoring, agile-versus-predictive, distributed teams, recovery

Labs are cumulative within a scenario where the numbering says so. Labs 08, 09, and 10 build one schedule together: Lab 08 establishes activities and capacity, Lab 09 the dependency logic, Lab 10 the critical path and Gantt chart. If you skip one, the next will not make sense.

How to work a lab

  1. Read the objectives and the scenario, including the project information and assumptions.
  2. Do the tasks — including the calculations — and produce the deliverable.
  3. Run the self-check criteria honestly. They are written so a third party could judge them.
  4. Only then compare your work with the answer key.
  5. Keep the artefact: several labs feed the capstone.

Every lab uses the same structure:

Section Purpose
At a glance Modules, level, estimated time, deliverable, template, answer key
Learning objectives What you should be able to do afterwards
Scenario The project you are working on
Your role Who you are, and what you are accountable for
Project information and assumptions The facts you are given — nothing important is hidden
Tasks Step-by-step instructions, including calculations
Deliverable Exactly what to hand in
Hints and guidance How to avoid the common mistakes
Self-check criteria How to mark your own work
Reflection Questions to consolidate the learning
Extension challenge A harder variant for when the lab is finished

Available labs

Beginner

Lab Module(s) Scenario Deliverable
01 — Writing a Project Charter 01–02 Campus Event Portal Project charter
02 — Identifying and Classifying Stakeholders 02 Complaint Management System Stakeholder map and stances
03 — Defining a Project Vision 01–02 University LMS Vision, success criteria, exclusions
04 — Identifying Project Constraints and Assumptions 02 Mobile Banking Application Constraint register and assumptions log
05 — Creating a Stakeholder Register 02, 10 Hospital Appointment Portal Stakeholder register and engagement levels
06 — Developing a Scope Statement 05 E-Commerce Platform Scope statement and acceptance criteria

Intermediate

Lab Module(s) Scenario Deliverable
07 — Creating a Work Breakdown Structure 05 Inventory & Supply Chain Three-level WBS and work packages
08 — Building a Project Schedule 06 Admission Management System Activities, durations, capacity, calendar
09 — Identifying Dependencies and Building a Network Diagram 06 Admission Management System Classified dependency table and network
10 — Creating a Gantt Chart with the Critical Path 06 Admission Management System Passes, float, critical path, Gantt chart
11 — Developing a Risk Register 08 Hospital Appointment Portal Risk register with responses and residuals
12 — Preparing a Communication Plan 10 Complaint Management System Communication plan and cost calculation
13 — Estimating Effort and Cost 07 University LMS Budget with ranges and derived contingency
14 — Creating a Scrum Product Backlog 04 E-Commerce Platform Ordered backlog and release forecast
15 — Running Sprint Planning 04 E-Commerce Platform Sprint goal, task breakdown, definition of done

Advanced

Lab Module(s) Scenario Deliverable
16 — Schedule Compression Trade-offs 06 Mobile Banking Application Crash analysis and recommendation
17 — Risk Response Strategies and Contingency 08 Inventory & Supply Chain Residual exposure and contingency figure
18 — Earned Value Management Calculations 11 Analytics Dashboard Two periods of EVM and a forecast
19 — Evaluating a Change Request 11, 03 University LMS Impact analysis and decision options
20 — Quality Planning and the Cost of Quality 09 Mobile Banking Application Quality plan and cost-of-quality decision
21 — Resource Allocation Conflicts 10 Hospital Appointment Portal Over-allocation analysis and resolution
22 — Monitoring and Corrective Action 11 Complaint Management System Trend analysis and corrective actions
23 — Agile versus Predictive Planning 04, 03 E-Commerce Platform Comparison and decision memo
24 — Managing a Distributed Team 12 Admission Management System Working agreement and coordination cost
25 — Project Recovery Scenario 12, 13 Analytics Dashboard Recovery assessment and re-baselined plan

Answer keys, and what they are not

Numerical solutions and model answers are collected in the instructor section:

Answer key Covers
Beginner labs answer key Labs 01–06
Intermediate labs answer key Labs 07–15
Advanced labs answer key Labs 16–25

A necessary caveat. This is a public repository. Anything published here, including these answer keys, is available to anyone — so they are not secret, and no assessment can depend on them being withheld. Treat them as a reference for self-study: attempt the lab independently first, mark your own work against the self-check criteria, and only then read the key to see where your reasoning differed. An instructor using these labs for graded work must write their own variant problems.

Labs whose deliverables are judgement-based — stakeholder maps, working agreements, recovery recommendations — have model answers, not correct answers. More than one defensible answer exists, and the keys say so.

Scenarios used

Scenario Labs
Campus Event Portal 01
University LMS 03, 13, 19
Mobile Banking Application 04, 16, 20
Hospital Appointment Portal 05, 11, 21
E-Commerce Platform 06, 14, 15, 23
Inventory & Supply Chain 07, 17
Admission Management System 08, 09, 10, 24
Complaint Management System 02, 12, 22
Analytics Dashboard 18, 25

All nine scenarios are described in the example-project library. They are illustrative, not records of real projects, and every figure in every lab is labelled as invented for teaching.

Templates you will need

Many labs use the Templates section. Copy the template and fill it in — do not start from a blank page.