Streamlit · 06 — Caching, Session State, and an ML Prediction App¶
Time: ~75 min · CLOs: CLO-1, CLO-2, CLO-3 · Level: Intermediate Prerequisite: a basic scikit-learn model (Module B, e.g. k-NN from Session 19).
1. The two problems every app hits¶
Because the script re-runs on every interaction, two things happen that surprise beginners:
- Expensive work repeats. Training a model, loading a big CSV, or computing a correlation runs again on every slider move.
- Variables reset. Any normal variable is recomputed from scratch on every rerun — so "remember the user's name" doesn't work with plain variables.
Streamlit gives you exactly two tools for these two problems: caching (problem 1) and session state (problem 2).
2. Caching — run expensive work once: @st.cache_data¶
import streamlit as st
import pandas as pd
@st.cache_data
def load_data():
"""Runs ONCE, then the result is reused on every rerun."""
return pd.read_csv("big_file.csv")
df = load_data()
What happens: the first rerun calls load_data() and stores the result.
Every later rerun (new slider value, new click) reuses the stored result —
as long as the arguments are the same. If you call with different
arguments, it caches each combination separately.
The rule: cache data loading and model training (pure functions that return data). Don't cache things that depend on widgets:
@st.cache_data
def train_model(X, y):
"""Trains once per (X, y) combination — not on every rerun."""
from sklearn.neighbors import KNeighborsClassifier
model = KNeighborsClassifier(n_neighbors=5)
model.fit(X, y)
return model
3. Session state — remember things across reruns: st.session_state¶
st.session_state is a dictionary that survives reruns for the current
browser session:
if "counter" not in st.session_state: # first run: create it
st.session_state.counter = 0
if st.button("Increment"):
st.session_state.counter += 1 # persists across reruns
st.write("Count:", st.session_state.counter)
The pattern: initialize if missing, then read/write freely. Without
session state, counter = 0 would reset to 0 on every rerun and the count
could never grow.
When do you need it in this module?
- counters and toggles that must persist;
- chat history (Module C topic 11);
- a model that should be trained once per session rather than per rerun (caching already covers this — session state is for user-specific memory, caching is for expensive computation).
4. Displaying ML predictions¶
A prediction app = widgets for features → model.predict → display:
st.success(f"The predicted species is **{prediction}**")
st.metric("Confidence", f"{probability:.1%}")
Use st.metric for a single number and st.success/st.info for
sentences. Never display a bare array — format it for humans.
Example 5 — ML Prediction Application¶
A complete app: train a k-NN classifier on the iris dataset once (cached), let the user set the four flower measurements with sliders, and show the predicted species with confidence.
Explanation¶
The app separates the two jobs: training (expensive, cached, happens once) and prediction (cheap, runs on every slider move). The sliders are the features; the model predicts the species and the probability of each class. Because training is cached, moving a slider never retrains — only the prediction line re-runs.
Code¶
Save as app.py:
import streamlit as st
import pandas as pd
from sklearn.datasets import load_iris
from sklearn.model_selection import train_test_split
from sklearn.neighbors import KNeighborsClassifier
st.title("🌸 Iris Flower Predictor")
st.markdown("Set the four measurements and predict the iris species.")
# 1) Load + train ONCE (cached — not on every rerun)
@st.cache_data
def load_data():
data = load_iris(as_frame=True)
return data.frame
@st.cache_data
def train_model():
df = load_data()
X = df[["sepal length (cm)", "sepal width (cm)",
"petal length (cm)", "petal width (cm)"]]
y = df["target"]
X_train, X_test, y_train, y_test = train_test_split(
X, y, test_size=0.3, random_state=42)
model = KNeighborsClassifier(n_neighbors=5)
model.fit(X_train, y_train)
return model, X_test, y_test
model, X_test, y_test = train_model()
# 2) Show a little honesty: how good is the model?
accuracy = model.score(X_test, y_test)
st.caption(f"Model accuracy on held-out test data: {accuracy:.1%}")
# 3) Features as sliders
st.header("Set the measurements")
sepal_length = st.slider("Sepal length (cm)", 4.0, 8.0, 5.8, step=0.1)
sepal_width = st.slider("Sepal width (cm)", 2.0, 4.5, 3.0, step=0.1)
petal_length = st.slider("Petal length (cm)", 1.0, 7.0, 3.8, step=0.1)
petal_width = st.slider("Petal width (cm)", 0.1, 2.5, 1.2, step=0.1)
# 4) Predict (cheap — runs on every rerun)
features = pd.DataFrame([[sepal_length, sepal_width,
petal_length, petal_width]],
columns=X_test.columns)
prediction = model.predict(features)[0]
probabilities = model.predict_proba(features)[0]
species = ["setosa", "versicolor", "virginica"]
st.header("Prediction")
st.success(f"Predicted species: **{species[prediction]}**")
st.metric("Confidence", f"{max(probabilities):.1%}")
Expected result¶
- A caption with test accuracy (with
random_state=42: ≈ 97.8%). - Four sliders with sensible defaults (5.8, 3.0, 3.8, 1.2 — the dataset means), so the very first prediction is already meaningful.
- A green success line with the predicted species and a confidence metric.
- Move one slider → the prediction updates instantly, without retraining (you can tell: the app never hesitates).
Exercise¶
- Add a
st.selectboxforn_neighbors(1–15) that retrains the model when changed — remove the cache fromtrain_model(or addn_neighborsas a parameter) and watch the accuracy caption change. - Show the full probability breakdown:
for s, p in zip(species, probabilities): st.write(f"{s}: {p:.1%}") - Add
st.progress(max(probabilities))under the confidence metric.
Challenge¶
Replace the dataset: switch to sns.load_dataset("penguins") and predict
species from bill length, bill depth, flipper length, and body mass
(drop rows with missing values first — penguins has some!). Keep caching,
add a st.selectbox for the model (KNeighborsClassifier vs
LogisticRegression), and display test accuracy for the chosen model. You
have just built a model-comparison app.
Common mistakes¶
| Mistake | Fix |
|---|---|
| Model retrains on every slider move | cache train_model with @st.cache_data |
| Cache "not working" | arguments changed (e.g. a widget value) — cache by data, not by widget |
| Counter resets to 0 | use st.session_state, not a plain variable |
st.session_state KeyError |
initialize first: if "key" not in st.session_state |
| Prediction app crashes on empty dataframe | check len(X_test) after dropping missing values |
| Showing raw probabilities array | format with f-strings / st.metric |
Checkpoint questions¶
- What is the difference between
@st.cache_dataandst.session_state? CLO-1 · Understand · Medium Answer: caching stores the result of an expensive function keyed by its arguments (shared, computation-focused); session state stores variables across reruns per user session (memory-focused). Caching stops repeated work; session state stops resetting values. - Why is it safe for the model to be cached but the sliders to re-run the prediction? CLO-2 · Analyze · Medium Answer: training is the expensive, dataset-dependent step and is identical every rerun; prediction is cheap, instant, and depends on the current widget values — so only it should re-run.
- Your cache "doesn't work" — the model retrains every time you move a
slider. What's the most likely cause? CLO-2 · Evaluate · Medium
Answer: the cached function receives widget-dependent arguments
(e.g.
n_neighborsfrom a selectbox), so every change creates a new cache entry — cache training on fixed inputs, or only the data loading.