Session 27 — Ollama: Local Models¶
Week 14 · Session 27 · Module C · 90 min · CLO-3
1. Learning objectives¶
By the end of this session, students can: - Explain why running models locally matters (privacy, cost, offline work). - Install and run Ollama; pull and switch between models. - Chat with a local model from Python and from the notebook. - Compare local vs. cloud models honestly (capability vs. control trade-offs). - Use a local model as the LLM behind PandasAI and simple scripts.
2. Key concepts¶
- Ollama = a local LLM runtime: it downloads models and serves them on your machine (
http://localhost:11434). - Models are files:
ollama pull llama3.2fetches one; different models = different size/speed/capability trade-offs. - The ollama Python client talks to the local server; no API key, no network needed after the pull.
- Local vs. cloud: local = private, free, offline; cloud = bigger models, more capability, costs + data leaves your machine.
- A small model running locally is often good enough for data-analysis tasks (translation, explanation, simple code).
- Same verification rules as ever: local ≠ infallible; audit and check.
3. Detailed lecture notes¶
Why local models? Session 26 used Ollama as the engine behind PandasAI. Today we open the hood. Cloud LLMs (ChatGPT, Gemini) are powerful but: your data travels to their servers, usage can cost money, and you need internet. For data work with real datasets — especially personal or institutional data — sending every DataFrame to a cloud service is often unacceptable (Session 30 makes the privacy stakes concrete). Ollama runs models entirely on your machine: private, free, works offline. The trade: your laptop's memory limits model size, so you use smaller models than the cloud's best.
What Ollama actually is. It's a runtime + model manager. You ollama pull
<model> once — that downloads the model weights to your disk. Then
ollama run llama3.2 gives an interactive chat; the Python client
(import ollama; ollama.chat(...)) talks to the same local server
(localhost:11434). Once a model is pulled, everything is offline. The
model-library page (ollama.com/library) lists options; for this course:
llama3.2 (small, fast, general) as default; qwen2.5:7b (stronger, bigger);
llava for image tasks (mention only). Size/capability rule of thumb: bigger
model = better reasoning, more RAM, slower responses. A 7B model on a student
laptop is typically the sweet spot for course work.
The mental model: "small but yours". Local models trail frontier cloud models on hard reasoning. But most of what this course needs an LLM for — translating a question into pandas code, explaining an error, summarizing a finding — is well within a small model's reach. The professional skill is matching model to task: local for private/simple, cloud for frontier-hard tasks when data policies allow. Emphasize the engineering frame: an LLM call is a function in your pipeline (input text → output text); Ollama gives you that function on your own hardware.
Using it in Python. The client is minimal:
import ollama
resp = ollama.chat(model="llama3.2", messages=[{"role": "user", "content": "..."}])
print(resp["message"]["content"])
stream=True) and temperature are options —
keep it simple. Two practical patterns for the course: (1) as the PandasAI LLM
(Session 26's OllamaLLM — under the hood it wraps exactly this API); (2)
direct chat for explanation/drafting inside a notebook. For scripting, keep
prompts in variables and log them (Session 24's reproducibility + Session 26's
AI log apply verbatim).
Comparing local vs. cloud (honest table to teach): local — private (data stays put), free, offline, smaller models, slower on big hardware needs. Cloud — frontier capability, easy API, costs, data leaves machine, terms of service apply. Neither is "better"; the choice is contextual. Exercise for students: same prompt to local and (if available) cloud, compare quality on a data task — see the gap with their own eyes, and see that local is often good enough.
Verification unchanged. A local model can hallucinate exactly like a cloud one (Session 25). Same protocol: run, understand, check, disclose. Local-ness is a privacy/control property, not a correctness property.
4. Important terminology¶
- Ollama — local LLM runtime + model manager.
- Model weights — the trained parameters downloaded as a model file.
ollama pull/ollama run— download / run a model.localhost:11434— the local server the Python client talks to.- Token — the unit of text the model processes (context limits measured in tokens).
- System prompt — instructions setting the model's behavior.
- Messages — the
[{role, content}]chat structure. - Local vs. cloud inference — on-device vs. remote computation trade-offs.
- Context window — how much text the model can consider at once.
- Quantization — (mention) compressed weights → smaller, faster, slightly weaker models.
5. Python examples¶
# --- Terminal setup (once per machine) ---
# ollama pull llama3.2
# ollama run llama3.2 # interactive chat; type /bye to exit
# --- Python: the whole client in three lines ---
import ollama
resp = ollama.chat(model="llama3.2", messages=[
{"role": "system", "content": "You are a concise data-science tutor."},
{"role": "user", "content": "Explain what a train/test split is in two sentences."},
])
print(resp["message"]["content"])
# --- Practical: local model behind PandasAI (from Session 26) ---
from pandasai import Agent
from pandasai.llm import OllamaLLM
import seaborn as sns
tips = sns.load_dataset("tips")
agent = Agent(tips, config={"llm": OllamaLLM(model="llama3.2")})
print(agent.chat("What is the average tip on Sunday?"))
# then audit: tips.loc[tips.day == "Sun", "tip"].mean()
# --- A reusable helper with a logged prompt (reproducibility!) ---
import ollama
def ask(model: str, question: str, system: str = "") -> str:
messages = []
if system:
messages.append({"role": "system", "content": system})
messages.append({"role": "user", "content": question})
resp = ollama.chat(model=model, messages=messages)
return resp["message"]["content"]
print(ask("llama3.2", "List 3 pandas functions for cleaning missing values."))
6. Beginner example¶
import ollama
reply = ollama.chat(model="llama3.2", messages=[
{"role": "user", "content": "Say hello in one sentence."}
])
print(reply["message"]["content"])
If this prints a greeting, your local LLM stack works — everything else is variations on this call.
7. Practical Data Science example¶
import ollama
import seaborn as sns
import pandas as pd
# Real task: let a LOCAL model review our EDA findings (privacy-safe, free)
penguins = sns.load_dataset("penguins").dropna()
mean_mass = penguins.groupby("species")["body_mass_g"].mean().round(0)
findings = f"""
Dataset: penguins. Mean body mass (g): {mean_mass.to_dict()}.
I claim: Gentoo penguins are much heavier than the other species.
Task: is my claim supported? Suggest one follow-up analysis.
"""
reply = ollama.chat(model="llama3.2", messages=[
{"role": "user", "content": findings},
])
print(reply["message"]["content"])
# Verification: the claim is checkable directly:
print(mean_mass) # Gentoo ~5076 vs Adelie ~3701, Chinstrap ~3733 -> supported
# Disclosure note for the notebook:
# "Review and follow-up idea generated by llama3.2 (local, via Ollama);
# claim verified against groupby means above."
8. In-class activity (50 min)¶
In notebooks/week-14/session-27-ollama.ipynb:
- Setup race (10 min): confirm
ollama --version,ollama list; pullllama3.2if missing; run the three-line chat. - System-prompt experiment (15 min): the same question with three system prompts ("one sentence", "list format", "explain like I'm 15") — observe how the frame changes the output.
- Task matching (15 min): run the penguins review example; then ask a harder reasoning question (e.g., a small logic puzzle) and honestly rate the answer. Fill in a local-vs-cloud comparison table from experience.
- Wrap it in a helper (10 min): write the
ask()helper, log three prompt/response pairs to your AI log.
9. Lab exercise¶
Lab 27 is due today (labs/lab-27-ollama.md): Ollama — pull a model,
chat from Python, compare system prompts, and write a short reflection on
local vs. cloud for your project's data (privacy angle). Push.
10. Common mistakes¶
- Forgetting to pull the model → "model not found" errors on first use.
- Pulling huge models on a small laptop → slow/OOM; use
llama3.2orqwen2.5:7bfor course work. - Expecting a local 3B model to match frontier cloud quality — match task to model.
- Thinking local = correct — hallucination risk is unchanged (verify!).
- Pasting secrets/keys into prompts logged to disk — keep prompts clean.
- Not logging prompts → unreproducible AI steps (AI log discipline).
- Using cloud LLMs for private data when a local model would do — a privacy decision, not a convenience decision.
11. Short assessment questions¶
- What does
ollama pull llama3.2actually download? - What are two advantages of local models and two trade-offs?
- Write the Python call that chats with a local model.
- What is a system prompt for?
- Your data is sensitive hospital records. Which LLM setup should you use and why?
- True/False: because the model runs on your machine, its answers are guaranteed accurate. (False.)
12. CLO mapping¶
CLO-3: Ollama provides the "local models" capability named in the CLO, enabling private, reproducible AI-assisted workflows. Combined with Session 26's auditing discipline, it's the complete local-AI data workflow used in Lab 27, the project's AI component, and Assignment 2's verification protocol.
13. Suggested homework¶
- Finish Lab 9 and push.
- Practice: run your own project's EDA findings through the local model for review; log the exchange; act on one suggestion (or reject it with a reason).
- Read: the Ollama README on GitHub (ollama/ollama) — the API section, 10 minutes.
- Preview: Session 28 turns the chat into an agent — the model gets tools (functions) it can call, like fetching weather or running pandas.