Skip to content

Session 28 — Simple AI Agents

Week 14 · Session 28 · Module C · 90 min · CLO-3

1. Learning objectives

By the end of this session, students can: - Explain what an AI agent is: an LLM that can call tools in a loop. - Define the agent loop: think → call tool → observe result → decide. - Define a Python function as a "tool" the model can call. - Run a simple tool-calling agent with Ollama and inspect the tool calls. - Automate one small data-analysis subtask and document it.

2. Key concepts

  • Agent = LLM + tools + a loop: the model doesn't just answer — it can do things and see results.
  • Tool calling: the model outputs a structured request ("call get_weather(city=...)"); your code executes it and returns the result.
  • The loop: the model alternates between reasoning and tool calls until it has what it needs.
  • You write the tools, you set the boundaries: an agent can only call functions you define — that's the safety design.
  • Agents are not autonomous wizards: they inherit the LLM's hallucination risk; every tool result they report must still be verified.
  • The reproducibility rule extends: record the prompt, the tool calls, and the final answer.

3. Detailed lecture notes

From chat to agent. Until now the LLM only produced text. An agent turns it into an actor: the model can request a tool call ("call function tip_summary(by='day')"), your code runs the tool, and the result is fed back to the model. The model then continues — perhaps calling another tool, or producing the final answer. The pattern is a loop: reason → call tool → observe → reason again. This is how "AI assistants" that check the weather, query databases, or summarize files actually work. For data science, the agent loop is a natural fit: the "tools" are pandas functions and analysis steps.

How tool calling works (mechanics). The model is told which tools exist — name, description, and parameter schema. When appropriate, it responds with a structured tool request instead of plain text:

ToolCall: get_tip_summary(by="day")
Your code receives this, runs the real function, and returns the output as a new "tool" message. The model sees the result and decides what's next. You are the one who writes and executes the tools — the model never runs arbitrary code itself. That division is the safety property: the agent can only do what you've coded it to do. The tool's docstring (description) is the model's instruction manual — write it carefully ("Returns the mean tip grouped by the given column; use when asked about tips by category").

Building a data-analysis agent (course scale). Keep it deliberately small: 1. Write 2–3 pure Python functions over a DataFrame (e.g., summary_stats(df), tip_by(df, by), detect_missing(df)). 2. Describe them to the model (tool schema). 3. Loop: ask the agent a question ("which day has the highest tips, and how many rows are missing?"); it calls tools; you run them; feed results back; repeat until it answers. Implementation with Ollama: the Python client supports tools= in chat() (OpenAI-style JSON schema; requires Ollama ≥ 0.4 server and the model to support tool calling — llama3.2 does; verify versions in class). Walk through the request/response cycle and print the tool calls so students see the interleaving — the "agent" is just this visible loop, not magic.

Why agents for data science? The honest pitch: for one-off questions, a plain chat (Sessions 25–27) is enough. An agent pays off when a task has several steps with decisions between them — e.g., "check the data quality, then summarize the worst column, then tell me if I should clean or drop it". The agent can chain those steps itself, using your verified functions. For this course, the goal is to see the loop working on one realistic subtask — not to build a general assistant. Scope discipline (Session 23's lesson) applies to agents too.

Risks to teach (briefly, honestly). The loop can run long (cap it — max N tool calls), tools can be called with wrong arguments (validate inputs in your functions), and the model can misreport what a tool returned (it summarizes — the underlying result is ground truth; keep the transcript). Two rules: (1) log the full transcript (prompt, calls, results) for reproducibility; (2) the final numbers you report come from your tools' outputs, not from the model's prose. This is the Session 25 verification protocol, agent edition.

4. Important terminology

  • Agent — LLM + tools + loop: can act and observe.
  • Tool / function calling — the model requests a function; your code executes it.
  • Tool schema — name + description + parameters, telling the model what's callable.
  • Agent loop — reason → call tool → observe → reason, until done.
  • Tool result / observation — the function's output fed back to the model.
  • Max iterations — cap on loop length (safety valve).
  • Tool transcript — the logged record of every call (reproducibility).
  • Boundaries — the agent can only call the functions you wrote.
  • Ground truth — actual tool outputs; the model's summaries must be checked against them.

5. Python examples

import ollama
import seaborn as sns
import pandas as pd

tips = sns.load_dataset("tips")

# --- 1. Write the tools (plain functions, YOUR code) ---
def tip_by(df: pd.DataFrame, by: str) -> str:
    """Mean tip grouped by a column. Use for questions about tips by category."""
    return df.groupby(by)["tip"].mean().round(2).to_string()

def missing_summary(df: pd.DataFrame) -> str:
    """Count missing values per column. Use when asked about data quality."""
    return df.isna().sum().to_string()

# --- 2. Describe the tools to the model (schema) ---
tools = [
    {"type": "function",
     "function": {"name": "tip_by", "description": tip_by.__doc__,
                  "parameters": {"type": "object",
                                 "properties": {"by": {"type": "string"}},
                                 "required": ["by"]}}},
    {"type": "function",
     "function": {"name": "missing_summary", "description": missing_summary.__doc__,
                  "parameters": {"type": "object", "properties": {}}}},
]

# --- 3. The agent loop (one iteration shown; loop until no tool call) ---
messages = [{"role": "user",
             "content": "Which day has the highest average tip? Also, are there any missing values?"}]

resp = ollama.chat(model="llama3.2", messages=messages, tools=tools)
msg = resp["message"]
print("Model wants to call:", msg.get("tool_calls"))

# --- 4. Execute the requested tool and feed the result back ---
if msg.get("tool_calls"):
    for call in msg["tool_calls"]:
        fn = call["function"]["name"]
        args = call["function"]["arguments"]
        result = {"tip_by": tip_by, "missing_summary": missing_summary}[fn](tips, **args)
        messages.append(msg)                                  # the tool request
        messages.append({"role": "tool", "content": str(result)})  # the observation

    final = ollama.chat(model="llama3.2", messages=messages, tools=tools)
    print(final["message"]["content"])
# --- The loop, made safe and visible: cap iterations, log everything ---
def run_agent(question, tools, max_steps=5):
    messages = [{"role": "user", "content": question}]
    log = []
    for step in range(max_steps):
        resp = ollama.chat(model="llama3.2", messages=messages, tools=tools)
        msg = resp["message"]
        log.append(msg)
        if not msg.get("tool_calls"):
            return msg["content"], log
        for call in msg["tool_calls"]:
            result = EXECUTE[call["function"]["name"]](**call["function"]["arguments"])
            messages.append(msg)
            messages.append({"role": "tool", "content": str(result)})
            log.append({"tool_call": call, "result": result})
    return "Reached max steps.", log

6. Beginner example

# The smallest agent: one tool (a calculator), one question.
import ollama

def add(a: float, b: float) -> str:
    """Add two numbers. Use for arithmetic questions."""
    return str(a + b)

tools = [{"type": "function",
          "function": {"name": "add", "description": add.__doc__,
                       "parameters": {"type": "object",
                                      "properties": {"a": {"type": "number"}, "b": {"type": "number"}},
                                      "required": ["a", "b"]}}}]

resp = ollama.chat(model="llama3.2",
                   messages=[{"role": "user", "content": "What is 12 + 30?"}],
                   tools=tools)
print(resp["message"].get("tool_calls"))   # asks to call add(12, 30)
print(add(12, 30))                          # YOU run it: 42

7. Practical Data Science example

# An agent that answers "Is this dataset analysis-ready?" using your tools
import ollama
import seaborn as sns
import pandas as pd

penguins = sns.load_dataset("penguins")

def missing_summary(df):
    """Count missing values per column."""
    return df.isna().sum().to_string()

def describe_numeric(df):
    """Summary statistics of numeric columns."""
    return df.describe().round(2).to_string()

# (tools schema as above — abbreviated here)
# Question: "Should I drop missing values before modeling? Base your answer on
#            the data, calling tools as needed."
# Expected flow: missing_summary -> describe_numeric -> final answer.
# Verification rule: the counts in the answer must match the tool outputs you
# logged. Record the whole transcript in project/ai-notes.md.

8. In-class activity (50 min)

In notebooks/week-14/session-28-agents.ipynb:

  1. The loop, printed (15 min): run the tips agent from section 5; print tool_calls and each tool result before the final answer — students see the interleaving.
  2. Your own tool (20 min): write one more tool for the tips data (e.g., top_rows_by, returning the top-5 rows of a column), add it to the schema, and ask a question that needs both your new tool and an existing one.
  3. Boundary check (15 min): ask the agent to do something its tools can't (e.g., "delete a column") — watch it either refuse or hallucinate; then confirm that no code ran (the agent can only call your functions). Write one sentence on why boundaries are the safety feature.

9. Lab exercise

No graded lab this session — it's a build day: continue your Assignment 2 Streamlit app (due Session 30) and the project's AI component. Today's agent loop is exactly the pattern you'll reuse there.

10. Common mistakes

  • Expecting the model to run code itself — it only requests tool calls; your code executes them.
  • Writing vague tool descriptions → the model never calls the tools (descriptions are the model's manual).
  • No max-iteration cap → loops that run away (and cost time).
  • Trusting the model's summary of a tool result instead of reading the logged result.
  • Forgetting to append the tool result to the message history → the model can't see its own observations.
  • Letting the agent decide things your tools don't cover — it will improvise; bound it.
  • Not logging the transcript → unreproducible agent step in the project.

11. Short assessment questions

  1. What three ingredients make an "agent"?
  2. Describe the agent loop in four steps.
  3. Who executes the tool when the model requests a call? (Your code.)
  4. Why is "the agent can only call functions you define" a safety feature?
  5. What is the risk of the model summarizing a tool result, and what's the fix?
  6. What belongs in an agent transcript for reproducibility?

12. CLO mapping

CLO-3: agents are the "basic AI agents" named in the CLO. This session turns them from buzzword to mechanism — a bounded loop over your verified functions — and keeps the reproducibility (transcript) and responsibility (boundaries, verification) requirements front and center.

13. Suggested homework

  • Build one agent that automates a small step of your project (e.g., "check cleaning completeness" or "summarize the cleaned dataset"); log the transcript.
  • Decide which AI component your project will use (PandasAI/Ollama step vs. n8n automation) and note it in your plan.
  • Read: Ollama blog/docs on function calling (github.com/ollama/ollama — "Function calling" section).
  • Preview: Session 29 moves from code agents to visual automation with n8n — workflows that collect and process data without writing a loop.