Session 17 — Introduction to Machine Learning¶
Week 9 · Session 17 · Module B · 90 min · CLO-2
1. Learning objectives¶
By the end of this session, students can: - Explain the difference between traditional programming and machine learning. - Distinguish supervised (labeled) vs. unsupervised (unlabeled) learning, and regression vs. classification. - Describe the train/test split and why it exists. - Train and evaluate a first scikit-learn model end-to-end. - Identify when a machine learning approach is (and isn't) appropriate.
2. Key concepts¶
- ML inverts programming: instead of rules → answers, you give examples → rules.
- Supervised: data has answers (labels) — you learn the mapping features → label.
- Unsupervised: no labels — you find structure (groups, patterns).
- Regression predicts a number; classification predicts a category.
- Generalization — the model must work on new data, not just memorized training data.
- train/test split simulates "new data" honestly; scikit-learn's uniform API makes every model interchangeable.
- A baseline (predict the mean / most common class) must be beaten — otherwise the model is noise.
3. Detailed lecture notes¶
Why machine learning, why now? Weeks 1–8 answered "what is in this data?"
via EDA. Machine learning answers "what can we predict from this data?"
Traditional programming: you write the rule (if bill > 40: tip = high).
Machine learning: you provide thousands of (bill, size, day, tip) examples and
the algorithm finds the rule. That inversion — data in, rules out — is the
entire idea, and it's why the phrase "learning from data" is literal.
The learning problem shapes. Two questions decide everything: 1. Do the examples have labels (known answers)? - Yes → supervised learning. - No → unsupervised learning (find structure: clusters). 2. What kind of answer do we want? - A number (price, score, tip) → regression. - A category (spam/not, species, churn) → classification. Give the 2×2 with examples from their world: predict GPA (supervised, regression), detect fraud (supervised, classification), segment customers (unsupervised, clustering — Session 21).
Why train/test? A model that aces its training data may simply have
memorized it (overfitting — the theme of Session 20). The only honest test is
data the model never saw. The train/test split (typically 80/20) holds out a
slice: fit on train, score on test. If test performance is much worse than train,
the model memorized. This discipline — never judge a model on its training data
— is the first law of applied ML. Randomness in the split: random_state=42
makes the split reproducible (the seed habit from Session 6 pays off).
The scikit-learn API — one uniform pattern. Every model in scikit-learn works the same four-step way, which is why the library is the standard:
model = LinearRegression() # 1. choose a model
model.fit(X_train, y_train) # 2. learn from training data
y_pred = model.predict(X_test) # 3. predict on unseen data
score(model) # 4. evaluate
X = feature matrix (2-D), y = target (1-D). This uniform API means Sessions
18–22 are all variations of one pattern with different models and metrics.
The baseline discipline. Before any model, compute the trivial prediction: for regression, always predict the mean; for classification, always predict the most common class. A model that can't beat its baseline adds nothing. This habit keeps beginners honest and is graded in Labs 17–22, the final exam, and the project.
When NOT to use ML. If the rule is simple and stable, write the rule. If you
need an explanation a regulator must audit, prefer interpretable models. If the
data is tiny or the question is answered by a groupby, don't build a model.
And always: the model is only as good as the data — garbage in, garbage out
(Session 9's lesson, now with consequences).
4. Important terminology¶
- Machine learning — algorithms that improve at a task from data/examples.
- Feature (X) — input variable(s) used for prediction.
- Target / label (y) — the answer we want to predict.
- Supervised / unsupervised — with/without labels.
- Regression / classification — predict a number / predict a category.
- Train/test split — held-out data for honest evaluation.
- Generalization — performing well on unseen data.
- Overfitting — memorizing training data; test performance drops (Session 20).
- Baseline — naive prediction to beat (mean / most common class).
fit/predict— learn / apply a scikit-learn model.random_state— seed for reproducible splits and models.
5. Python examples¶
import pandas as pd
import numpy as np
from sklearn.model_selection import train_test_split
from sklearn.linear_model import LinearRegression
from sklearn.metrics import mean_squared_error
np.random.seed(42)
df = pd.DataFrame({
"hours": np.random.uniform(1, 10, 200),
})
df["score"] = 40 + 6 * df["hours"] + np.random.normal(0, 5, 200) # linear + noise
X = df[["hours"]]
y = df["score"]
X_train, X_test, y_train, y_test = train_test_split(X, y, test_size=0.2, random_state=42)
model = LinearRegression()
model.fit(X_train, y_train)
y_pred = model.predict(X_test)
print("Test RMSE:", round(np.sqrt(mean_squared_error(y_test, y_pred)), 2))
# Baseline: always predict the training mean
baseline_pred = np.full_like(y_test, y_train.mean())
print("Baseline RMSE:", round(np.sqrt(mean_squared_error(y_test, baseline_pred)), 2))
6. Beginner example¶
from sklearn.neighbors import KNeighborsClassifier
from sklearn.model_selection import train_test_split
from sklearn.metrics import accuracy_score
# 3 features, 2 classes — tiny, but the full pattern
X = [[1, 0], [2, 0], [1, 1], [5, 4], [6, 4], [5, 5]]
y = ["small", "small", "small", "big", "big", "big"]
X_train, X_test, y_train, y_test = train_test_split(X, y, test_size=0.33, random_state=1)
knn = KNeighborsClassifier(n_neighbors=3)
knn.fit(X_train, y_train)
print("Accuracy:", accuracy_score(y_test, knn.predict(X_test)))
Six lines: choose → fit → predict → score. Every model this module is this shape.
7. Practical Data Science example¶
import pandas as pd
import seaborn as sns
from sklearn.model_selection import train_test_split
from sklearn.linear_model import LinearRegression
from sklearn.metrics import mean_absolute_error
# Question: can bill size + party size predict the tip?
tips = sns.load_dataset("tips")
X = tips[["total_bill", "size"]]
y = tips["tip"]
X_train, X_test, y_train, y_test = train_test_split(X, y, test_size=0.2, random_state=42)
model = LinearRegression().fit(X_train, y_train)
pred = model.predict(X_test)
print("MAE: we're off by $", round(mean_absolute_error(y_test, pred), 2), "on average")
print("Baseline MAE: $", round(mean_absolute_error(y_test, [y_train.mean()] * len(y_test)), 2))
# Model coefficients: which feature matters more?
print(pd.Series(model.coef_, index=X.columns))
8. In-class activity (50 min)¶
In notebooks/week-09/session-17-intro-to-ml.ipynb:
- Concept mapping (10 min): for 6 given problems (churn prediction, product recommendation, house price, spam filter, customer segments, GPA), classify each: supervised/unsupervised + regression/classification. Class votes.
- First model (25 min): reproduce the tips regression above; change the
seed and re-split — does the MAE change? (Yes — hence
random_state.) Plot predicted vs. actual tips as a scatter. - Baseline check (15 min): compute the baseline MAE; write one markdown sentence: is the model better than guessing the mean, and by how much?
9. Lab exercise¶
Lab 17 (labs/lab-17-intro-to-machine-learning.md) — due before Session
18: intro to ML — split, fit, predict, evaluate, compare with baseline,
checkpoint questions.
10. Common mistakes¶
- Evaluating on the training set → inflated scores and false confidence.
- Forgetting
random_state→ non-reproducible results across runs. - Passing
yas a DataFrame with wrong shape → cryptic errors; keep it 1-D (df["col"], notdf[["col"]]). - Skipping the baseline → calling a useless model "good" because the score is above zero.
- Forgetting to drop NaN before training (sklearn refuses silently or errors confusingly).
- Expecting a model to magically fix bad data — the model inherits every cleaning mistake.
- Confusing
fit(learn) withpredict(apply).
11. Short assessment questions¶
- What is the difference between supervised and unsupervised learning?
- Regression predicts a ; classification predicts a .
- Why must we evaluate a model on data it has never seen?
- What does
random_state=42do intrain_test_split? - What is a baseline, and why compute one?
- Name the four steps of the scikit-learn pattern in order.
12. CLO mapping¶
CLO-2: this session defines the entire Module B learning problem (tools + basic ML techniques). The fit/predict/evaluate pattern and baseline discipline are reused in every later session and in the project's modeling component.
13. Suggested homework¶
- Finish Lab 5 and push before Session 18.
- Read: scikit-learn "An introduction to machine learning" (sklearn.org — Getting Started page, first half).
- Practice: re-run the tips example with only
total_billas the feature; how does MAE change? (Fewer features, simpler model — usually slightly worse, but more interpretable.) - Preview:
model.intercept_andmodel.coef_from your fit — Session 18 explains what they mean and how to read a regression line.