Lesson 4 — Conversions and Mistakes
In this lesson you will learn
- string ↔ number conversion, both directions — and validating before converting
- char arithmetic — the character-code trick that powers digit processing
- the common mistakes gallery
1. String to number — and why validation comes first
Text arrives as text — from getline, from files. Converting it to a number is a decision the program makes, and the safe order is validate, then convert:
#include <string>
std::string text = "42";
int n = std::stoi(text); // string-to-int → 42
double d = std::stod("3.75"); // string-to-double → 3.75
stoi (and stod, stol, …) parse leading numeric characters and stop at the first non-digit:
| input | stoi returns |
the catch |
|---|---|---|
"42" |
42 | fine |
" 42abc" |
42 | leading spaces skipped, trailing junk ignored |
"abc" |
— | throws (ends the program) — nothing numeric to parse |
"" |
— | throws |
That middle row is the trap: stoi("42abc") silently succeeds. So the course order is:
// validate-as-text, then convert — the reader-suite philosophy applied to strings
bool allDigits(const std::string& s) {
if (s.empty()) return false; // empty is not a number
for (int i = 0; i < s.length(); i = i + 1) {
if (!isdigit(s[i])) return false; // <cctype> doing its job
}
return true;
}
// call site:
if (allDigits(text)) n = std::stoi(text);
else std::cout << "Not a whole number.\n";
This is exactly the [
2. Number to string
std::string s = std::to_string(42); // "42"
std::string t = std::to_string(3.75); // "3.75"
std::string u = std::to_string(1234.5); // "1234.500000" — note the digits!
to_string is direct and safe — the catch is formatting: doubles come out with six decimals. When presentation matters ("Total: 3.75"), format the number with the [
Both directions close the loop that I/O Lesson 3 left open — “getline gives you the text '17', conversion comes in Unit 11”: here it is.
3. Char arithmetic — the character-code trick
A char is a small whole number (its character code). '7' is not 7 — but the distance between digit chars is exactly the digit:
char c = '7';
int digit = c - '0'; // 7 — THE conversion trick
int digit2 = c - 48; // same thing, magic number — never write this
Why it works: '0' is 48, '1' is 49, … '9' is 57 — consecutive codes. Subtracting '0' maps '0'→0 through '9'→9. It reads like what it does, which is why the course writes c - '0' and never the raw number.
The trick in action — converting a whole string of digits by hand (what stoi does inside):
// "4729" → 4729, built digit by digit (the accumulator idiom on chars)
int value = 0;
for (int i = 0; i < text.length(); i = i + 1) {
value = value * 10 + (text[i] - '0');
}
Trace "472": 0 → 4 → 47 → 472. This is the reverse-digits accumulator wearing text — and it’s the honest core of every string-to-number exercise.
Letters have the same structure: 'a'..'z' and 'A'..'Z' are consecutive blocks, so 'a' - 'A' is the exact distance between cases — which is how toupper/tolower work inside:
char lower = c - ('a' - 'A'); // what tolower does for A-Z (the library call is still preferred)
One boundary to respect: this trick is for consecutive ranges ('0'..'9', 'a'..'z'). Arithmetic across cases like 'a' + 1 (gives 'b') is fine; assuming anything about other characters (spaces, punctuation) isn’t.
4. The common mistakes gallery
| # | Mistake | Signature symptom |
|---|---|---|
| S1 | == on C-strings |
always false — addresses compared, not text |
| S2 | Mixing >> and getline without ignore |
getline “skips” — it reads the leftover newline |
| S3 | substr(start, endIndex) |
one char too many/few — second arg is a length |
| S4 | find result used without the npos check |
garbage index / silent wrong slice |
| S5 | s[i] with i == length() |
out of bounds — last index is length() - 1 |
| S6 | erase inside a forward loop |
chars skipped as the tail shifts left |
| S7 | "literal" + number |
compile error — needs a std::string side |
| S8 | Comparing "10" < "9" expecting numbers |
lexicographic truth — convert first |
| S9 | stoi without validation |
throws on junk; silently ignores "42abc" tail |
| S10 | Empty-string indexing (s[0] unchecked) |
out of bounds on "" — guard empty() first |
S2 and S6 deserve their micro-examples (both are debugging exercises):
// S2 — the skip
int n; std::cin >> n;
std::string line; std::getline(std::cin, line); // line == "" — the newline!
// fix: std::cin.ignore(1000, '\n'); between the two
// S6 — the skipping erase
for (int i = 0; i < s.length(); i = i + 1)
if (s[i] == ' ') s.erase(i, 1); // tail slides left; i++ skips
// fix: build a new string without spaces
Practice
- Exercises 20–26 — conversions, char arithmetic, gallery drills
- Predictions 9–10
- Debugging 8–10
- Lab 7 — text statistics
Key takeaways
- Convert with
stoi/stod/to_string— but validate-as-text first:stoithrows on junk and ignores trailing junk. c - '0'turns a digit char into its number; the digit codes are consecutive, and so are the letter cases.- Ten named mistakes — S2 (the skip), S3 (substr length), and S6 (erase drift) are the trio that will meet you in the wild first.
→ Next: Exercises — then the mini-project.