Strings Predictions (10)
← Module home · Trace first on paper — draw the boxes, one state per step — then commit to an answer. All 10 answers in the answers section (separated so you can’t peek accidentally). ★ = first pass · ★★ = needs the toolkit.
The four rules for these: (1) == on char arrays compares addresses, not text. (2) >> reads one word; getline reads to newline. (3) find returns npos (printed as a huge number) on failure. (4) substr(pos, len) — second arg is length, and it clips silently.
P1 — The two creators (★)
char ca[6] = "cat";
std::string s = "cat";
std::cout << ca << ' ' << s << '\n';
if (ca == s) std::cout << "same";
else std::cout << "different";
Trace. What prints on line 1? Does the comparison even compile — and if it compiles, what does it compare?
P2 — The reader mix (★)
std::string a, b;
std::cin >> a; // input line 1: Silent Sea
std::getline(std::cin, b); // input line 2: was long
std::cout << "[" << a << "] [" << b << "]";
Input:
Silent Sea
was long
Trace. What is in a? What is in b — and which reader consumed the rest of line 1?
P3 — The skipped line (★)
int n;
std::string course;
std::cin >> n; // input: 42 / then: C++ Fundamentals
std::getline(std::cin, course);
std::cout << n << "/" << course.length();
Input:
42
C++ Fundamentals
Trace. What prints — and what is course actually holding? (One reader’s leftover is another reader’s whole input.)
P4 — Lengths and last boxes (★)
std::string s = "arrays";
std::cout << s.length() << ' ' << s[0] << ' ' << s[5] << ' ' << s[6];
Trace. Which of the four outputs is valid, and which is undefined? What is the last valid index formula?
P5 — Build-up states (★)
std::string s = "C";
s += '+';
s += '+';
s = s + " rocks";
std::cout << s << ' ' << s.length();
Trace. Final string and length? (Count carefully — spaces are boxes.)
P6 — Lexicographic truth (★)
std::cout << ("apple" < "Banana") << '\n';
std::cout << ("app" < "apple") << '\n';
std::cout << ("10" < "9") << '\n';
Trace. Three booleans (printed 1/0). Rule: lexicographic = code order, prefix rule, no numeric awareness.
P7 — The npos print (★★)
std::string s = "haystack";
std::size_t p = s.find("needle");
if (p == std::string::npos) std::cout << "absent\n";
else std::cout << p << '\n';
// Program B:
std::size_t q = s.find("hay");
std::cout << q << '\n';
Trace. What does Program A print? Program B? What kind of value does find return, and what happens if you slice without checking it?
P8 — Substr math (★★)
std::string t = "abcdefgh";
std::cout << t.substr(2, 3) << '\n';
std::cout << t.substr(0, 5) << '\n';
std::cout << t.substr(6) << '\n';
std::cout << t.substr(4, 9) << '\n';
Trace. Four lines. Remember: (start, length), start-only = to the end, length clips.
P9 — The modify chain (★★)
std::string m = "embedded";
m.erase(0, 3);
m.insert(0, "im");
m.replace(4, 1, "dd");
std::cout << m << '\n';
Trace. Three states after each edit. Expected final: "imbedded". Is it?
P10 — The char arithmetic (★★)
std::string digits = "4729";
int sum = 0;
for (int i = 0; i < digits.length(); i = i + 1) {
sum = sum + (digits[i] - '0');
}
std::cout << sum << '\n';
std::string lower;
char c = 'M';
lower += tolower(c);
std::cout << lower << ' ' << ('a' - 'A');
Trace. What is the sum? What prints for lower and for 'a' - 'A'? (Codes: ‘0’ is 48, digits 49–57; ‘A’ 65, ‘a’ 97.)
Answers
A1 — P1 (two creators)
Line 1: cat cat (both print their text). The comparison does compile (array converts to pointer) and compares the array’s address vs the string’s internal data address — different → prints different. The text is identical; the comparison isn’t comparing text. (Lesson 1 §2, gallery S1)
A2 — P2 (reader mix)
a = "Silent" (>> stops at the space), b = " Sea" (getline read the rest of line 1: a space + Sea). Line 2 (was long) is never read. [Silent] [ Sea]. The buffer had a leftover after >>; getline happily took it. (Lesson 1 §3)
A3 — P3 (skipped line)
42/0 — course holds the empty string: the newline >> left behind. Line 2’s text is never consumed. The mixing trap in its purest form; the fix is cin.ignore(1000, '\n') after cin >> n.
A4 — P4 (lengths and last boxes)
6 a s — valid — then s[6] is undefined behaviour (length 6 → valid indices 0–5). Last valid index = length() - 1. Some compilers print garbage for s[6], some crash, some (in debug) assert. (Lesson 2 §2)
A5 — P5 (build-up states)
Final string: C++ rocks — length 9 (C,+,+,space,r,o,c,k,s). States: C → C+ → C++ → C++ rocks. Both += forms (char, string) and s = s + "..." behave.
A6 — P6 (lexicographic)
0, 1, 1. First: 'a' (97) > 'B' (66) — lowercase codes are larger — so “apple” > “Banana” and the expression prints 0 (the trap: uppercase sorts before lowercase). Second: “app” is a proper prefix → shorter sorts first → 1. Third: '1' (49) < '9' (57) — lexicographic, no numeric awareness → 1. (Lesson 2 §4)
A7 — P7 (npos)
A: absent. B: 0. find returns std::size_t (unsigned). Slicing without the check: s.substr(p) with p = npos either throws or (npos+1 wrap) returns the whole string — the D3 bug.
A8 — P8 (substr)
cde (3 chars from 2) · abcde (5 from 0) · gh (start 6 → end) · efgh (start 4, length 9 clips to what exists). (Lesson 3 §2)
A9 — P9 (modify chain)
"embedded" → erase(0,3) → edded → insert(0,”im”) → imedded → replace(4,1,”dd”) → imeddded. Final: imeddded — not imbedded! The replace hit index 4 of the current string (d of ded… verify: i-m-e-d-d-e-d, index 4 = second d, replaced by dd → i m e d d d e d). Edit chains re-index every step — predict state by state, never jump. (Lesson 3 §4)
A10 — P10 (char arithmetic)
Sum: 4+7+2+9 = 22. lower prints m (‘M’ 77 − 32 → 109 = ‘m’). 'a' - 'A' = 97 − 65 = 32. The offset dance works in both directions. (Lesson 4 §3)