Iteration Exercises (32)
← Module home · ★ = first pass · ★★ = needs the idioms · ★★★ = combines ideas
How to use this page. Attempt each exercise for at least 15 minutes before looking at its solution. Solutions are grouped in a separated section at the end — each exercise links to its own solution so you don’t accidentally see the next answer. For every exercise, dry-run your loop on paper before compiling; the trace-table habit from Lesson 1 §2 is the whole skill.
Programs may use everything from Units 01–04: variables, decisions, cin/cout, switch. Loop style is your choice unless the exercise names one.
Part A — while mechanics (★, E1–E8)
E1. Print the numbers 1 to 10, one per line, using a while loop. Then print them all on one line, space-separated, with 10 followed by a newline.
E2. Print the even numbers from 2 to 20, one per line. Write it twice: once with a counter that skips odds via if, once by stepping the counter by 2. Which version would you show a friend, and why?
E3. Read n (assume 1–20), print a countdown n, n-1, ..., 1 and then Liftoff. Dry-run it for n = 3 in a full trace table before coding.
E4. Compute the sum 1 + 2 + ... + n with a while loop. Show your dry-run table for n = 4. Then state the total for n = 100 without running the program — and verify it.
E5. Read exactly 5 integers and print their sum and average. Use a while loop with a counter (the count is known — for comes later, but write this one with while to feel what for will save you).
E6. Read 6 integers. Count how many are positive and how many are negative, and print the sum of the positives only. (Zero is neither.) One loop, two counters, one accumulator.
E7. Compute the product 1 × 2 × ... × n with a while loop for n between 1 and 10. What must the accumulator start at, and what happens if it starts at 0?
E8. Diagnose without running. For each loop, name which part of the rule of three (initialization / condition / update) is broken and what the symptom will be:
(a) while (k < 5) { std::cout << k; } — k initialized to 0 before.
(b) int k = 10; while (k > 0) { std::cout << k; k = k + 1; }
(c) while (k <= 3) { std::cout << k; k = k + 1; } — k never declared.
Part B — for and the idioms (★★, E9–E16)
E9. Rewrite your E1 loop as a for. Write down exactly where each of the three parts went. Then do the same for your E3 countdown.
E10. Sum the squares 1² + 2² + ... + n² with a for loop. What is the total for n = 5? (Dry run first; the check value is in the solution.)
E11. Read n, then n marks (0–100, assume valid). Print the class average and the number of fails (< 40). One pass, accumulator + counter. Trace for n = 4, marks 55 38 91 40.
E12. Read n, then n temperatures (any integer, including negatives). Print the highest and lowest. Use the first-value champion — no max = 0 shortcuts. Trace for n = 5, values -8 12 3 -15 7.
E13. Read k and print its multiplication table from 1 × k to 10 × k, formatted as 3 x 4 = 12 per line.
E14. Sum the even numbers from 1 to 100. Write two versions: (a) loop 1–100 with an if filter, (b) loop 2, 4, …, 100 stepping by 2. Trace both for the first 3 passes. Which does fewer condition checks in total?
E15. For each loop, state exactly which values the body sees (the pass set) and how many passes run, for n = 5. Which two are equivalent? Which is the off-by-one bug, and what is its correct exit sentence?
(a) for (int i = 1; i <= n; i++)
(b) for (int i = 0; i < n; i++)
(c) for (int i = 1; i < n; i++)
E16. Read n, then n integers. Count how many are divisible by both 3 and 5, and how many are divisible by neither. Print both counts and their sum as a check (what must the two counts plus “divisible by exactly one” add up to?).
Part C — break, continue, sentinels, validation (★★–★★★, E17–E24)
E17. Read marks one per line until the sentinel -1, then print how many marks, their total, and their average (guard the division). Use the prime-read rhythm. Trace inputs 60 75 -1.
E18. Rewrite E17 with the while (true) + break rhythm. Then answer: what changed in the trace table, and where does the sentinel check sit now?
E19. Read integers until -1 and print three counts: positives, negatives, zeros. (Note: the sentinel is -1 precisely because 0 must be countable data — say so in a comment.) Trace 5 -2 0 -1.
E20. Read an age with a do-while validation loop that re-prompts until the age is in 1–120, printing a specific message for out-of-range values. Then print Adult (18+) or Minor.
E21. Write a robust integer reader: keep re-prompting while cin.fail() (clear + ignore each time), then use it to read two integers and print their sum. Feed it abc then 12 and state exactly what the user sees.
E22. Read 10 integers and print the first one greater than 100, or None if there isn’t one. Use break. Trace inputs 4 95 210 88 ... and show which passes never run.
E23. Sum the odd numbers from 1 to n using continue to skip evens. Then rewrite it without continue. State honestly which you find clearer and why — there is no single right answer.
E24. Read a Celsius value, print its Fahrenheit equivalent, then ask Another? (y/n). Repeat until the user answers anything other than y/Y. Use a do-while. Trace two rounds including a wrong first answer (t).
Part D — Nested loops, digits, math (★★★, E25–E32)
E25. Read a positive integer and print its digit count and digit sum. Trace 9045 in a full table (n, last, sum, count). What are the outputs for input 0, and what must the requirement say for that to be correct?
E26. Reverse the digits of a positive integer (4729 → 9274), then use the reversed copy to decide whether the number is a palindrome (reads the same reversed: 121 → yes, 123 → no). Remember to keep a copy of the original.
E27. Print the factorials 1! through 10!, one per line, as 5! = 120. Which line surprises most students, and which loop never runs to produce it?
E28. Print all primes from 2 to 50, one per line: for each candidate, count its divisors and print only those with exactly two. (Outer loop = candidates, inner loop = divisor test.) Then add the early exit: once the divisor count exceeds 2, stop testing that candidate.
E29. Print a right triangle of stars with height n: row 1 has 1 star, row n has n stars. Dry-run rows 1–3 for n = 4 before coding. What is the inner loop’s condition in terms of r?
E30. Print the number triangle 1 / 1 2 / 1 2 3 / 1 2 3 4 for height n. Which variable does the printed value track — the row or the column?
E31. Print the 5×5 multiplication grid: row r, column c shows r*c, formatted in columns with setw(4). Label it: header row 1..5 and row labels in column 0. (This is the mini-project’s table module in embryo.)
E32. Print numbers 1–30, but print Fizz for multiples of 3, Buzz for multiples of 5, FizzBuzz for multiples of both, and the number otherwise. One line per value. Decide the condition order deliberately and state why if (m % 15 == 0) must be tested first.
Solutions (S1–S32)
Attempted everything in your target part first? Good. Compare approach before comparing code — a different but correct loop is a win.
S1 — Count up and across
for (int i = 1; i <= 10; i = i + 1) {
std::cout << i << '\n';
}
for (int i = 1; i <= 10; i = i + 1) {
std::cout << i << ' ';
}
std::cout << '\n';
Second form: numbers separated by spaces, newline after the loop (the row-end rule in miniature). A while version moves i = i + 1 from the header into the body’s last line — same engine.
S2 — Evens two ways
int i = 2; // (a) filter version
while (i <= 20) {
if (i % 2 == 0) std::cout << i << '\n';
i = i + 1;
}
for (int i = 2; i <= 20; i = i + 2) { // (b) step version
std::cout << i << '\n';
}
(b) runs 10 condition checks + 10 updates; (a) runs 19 checks. Stepping by 2 halves the work and states the intent (“evens”) in the header — usually the one to show a friend. But (a)’s technique generalizes (skip by rule, not just by step), so both belong in your toolkit.
S3 — Countdown
int n;
std::cin >> n;
for (int t = n; t >= 1; t = t - 1) {
std::cout << t << '\n';
}
std::cout << "Liftoff\n";
Trace for n = 3: t=3 yes → prints 3, t=2 → 2, t=1 → 1, t=0 no → exit, then Liftoff. Four condition checks, three body runs — the exit-certificate row again.
S4 — Sum 1 to n
int n;
std::cin >> n;
int total = 0;
int i = 1;
while (i <= n) {
total += i;
i = i + 1;
}
std::cout << total << '\n';
Trace n = 4: total 0→1→3→6→10. For n = 100 the answer is 5050 — and the loop confirms it. (The closed formula n(n+1)/2 gives it instantly; you’ll meet that comparison properly in Stage D — for now, notice a loop’s result can sometimes be predicted by arithmetic.)
S5 — Five numbers
int total = 0;
int i = 1;
while (i <= 5) {
int x;
std::cin >> x;
total += x;
i = i + 1;
}
std::cout << "Sum: " << total << ", average: "
<< static_cast<double>(total) / 5 << '\n';
The static_cast (or writing total / 5.0) makes the average floating-point — total / 5 with both ints would truncate. i is pure machinery; total is the answer.
S6 — Positives, negatives, sum
int pos = 0, neg = 0, sumPos = 0;
int i = 0;
while (i < 6) {
int x;
std::cin >> x;
if (x > 0) { pos += 1; sumPos += x; }
else if (x < 0) { neg += 1; }
i = i + 1;
}
std::cout << "Positive: " << pos << ", negative: " << neg
<< ", sum of positives: " << sumPos << '\n';
The else if matters: zero must fall through both counters. This is Lab 2’s core in disguise — counters and accumulators classifying data in one pass.
S7 — Product
int n;
std::cin >> n;
int product = 1; // multiplicative identity — NOT 0
int k = 1;
while (k <= n) {
product *= k;
k = k + 1;
}
std::cout << product << '\n';
Starting at 0 multiplies everything into 0 — the accumulator’s start value must be the identity of its operation: 0 for +, 1 for ×. This is factorial (S27) in embryo.
S8 — Diagnose
- (a) Update missing → infinite loop printing
0000...(k stays 0, condition always true). - (b) Wrong-direction update: k climbs 10, 11, 12… away from the exit → infinite loop. (E2 symptom table, row 3.)
- (c) No initialization (k undeclared) → compile error: undeclared identifier.
S9 — for mapping
for (int i = 1; i <= 10; i = i + 1) { /* body */ }
// └── init └─ cond └─ update — from E1's while: i=1 (before), i<=10 (paren), i=i+1 (body's last line)
for (int t = n; t >= 1; t = t - 1) { /* body */ }
The countdown maps identically — only the directions differ. That’s the point of E9: for is not a new machine, it’s the same three parts in a fixed frame.
S10 — Sum of squares
int n;
std::cin >> n;
int total = 0;
for (int i = 1; i <= n; i = i + 1) {
total += i * i;
}
std::cout << total << '\n';
For n = 5: 1 + 4 + 9 + 16 + 25 = 55.
S11 — Class stats
int n;
std::cin >> n;
double total = 0;
int failed = 0;
for (int i = 1; i <= n; i = i + 1) {
int m;
std::cin >> m;
total += m;
if (m < 40) failed += 1;
}
std::cout << "Average: " << total / n << ", failed: " << failed << '\n';
Trace for 55 38 91 40: total 55, 93, 184, 224; failed 0, 1, 1, 1. Output Average: 56, failed: 1.
S12 — High and low
int n;
std::cin >> n;
int hi, lo;
for (int i = 1; i <= n; i = i + 1) {
int x;
std::cin >> x;
if (i == 1) { hi = x; lo = x; } // first value seeds both champions
else if (x > hi) { hi = x; }
else if (x < lo) { lo = x; }
}
std::cout << "High: " << hi << ", low: " << lo << '\n';
Trace -8 12 3 -15 7: hi −8→12→12→12→12; lo −8→−8→−8→−15→−15. Output High: 12, low: -15. max = 0 would have reported 0 as the low-side’s… no — it would report high = 0 is beaten by 12 correctly but a data set of all-negatives would print high: 0 — a value nobody entered. First-value seeding has no such assumption.
S13 — Table
int k;
std::cin >> k;
for (int i = 1; i <= 10; i = i + 1) {
std::cout << i << " x " << k << " = " << i * k << '\n';
}
Row shape fixed; only the multiplier varies — a 10-row grid with no nesting needed yet (E31 nests it).
S14 — Evens sum
int totalA = 0; // (a) filter
for (int i = 1; i <= 100; i = i + 1) {
if (i % 2 == 0) totalA += i;
}
int totalB = 0; // (b) step
for (int i = 2; i <= 100; i = i + 2) {
totalB += i;
}
std::cout << totalA << ' ' << totalB << '\n'; // 2550 2550
Both print 2550. (a) checks the condition 100 times; (b) 50 — plus (b) skips 50 body-entry decisions. Same answer, half the checks; the trace’s first three passes are 2, 4, 6 in both (values entering the accumulator), differing only in which i-values even reach the comparison.
S15 — Pass sets
- (a) body sees 1, 2, 3, 4, 5 → 5 passes.
- (b) body sees 0, 1, 2, 3, 4 → 5 passes.
- (c) body sees 1, 2, 3, 4 → 4 passes — the off-by-one bug (never touches n).
(a) and (b) are equivalent. (c)’s correct exit sentence: “for each value from 1 to n inclusive” → i <= n. Full discussion in Lesson 2 §5.
S16 — Divisibility counts
int n;
std::cin >> n;
int both = 0, neither = 0;
for (int i = 1; i <= n; i = i + 1) {
int x;
std::cin >> x;
if (x % 3 == 0 && x % 5 == 0) both += 1;
else if (x % 3 != 0 && x % 5 != 0) neither += 1;
}
std::cout << "Both: " << both << ", neither: " << neither << '\n';
Sanity check: both + neither + exactlyOne == n — the four categories partition the data. If your counts ever violate that, one of the conditions isn’t the true complement of the other (a decisions-module lesson replayed here).
S17 — Sentinel, prime read
int total = 0, count = 0;
int m;
std::cin >> m; // prime read
while (m != -1) {
total += m;
count += 1;
std::cin >> m; // read-again
}
std::cout << "Count: " << count << ", total: " << total << '\n';
if (count > 0)
std::cout << "Average: " << static_cast<double>(total) / count << '\n';
Trace 60 75 -1: (prime 60) → add → 60,1; 75 → 135,2; −1 → exit. The count > 0 guard: quitting immediately is legal, and dividing by zero isn’t.
S18 — Sentinel, break
int total = 0, count = 0;
while (true) {
int m;
std::cin >> m;
if (m == -1) break; // sentinel check right after the read
total += m;
count += 1;
}
Trace rows are the same shape; what changed is where the test sits — inside the body, immediately after the read, instead of in the header. One read instead of two; the exit is visible where the data arrives rather than in the condition.
S19 — Three counts
int pos = 0, neg = 0, zero = 0;
int m;
std::cin >> m;
while (m != -1) { // -1 is the sentinel BECAUSE 0 is real data here
if (m > 0) pos += 1;
else if (m < 0) neg += 1;
else zero += 1;
std::cin >> m;
}
std::cout << pos << ' ' << neg << ' ' << zero << '\n';
Trace 5 -2 0 -1: 5→pos1; −2→neg1; 0→zero1; −1→exit. Output 1 1 1.
S20 — Age guard
int age;
do {
std::cout << "Age (1-120): ";
std::cin >> age;
if (age < 1 || age > 120)
std::cout << "Out of range — try again.\n";
} while (age < 1 || age > 120);
if (age >= 18) std::cout << "Adult\n";
else std::cout << "Minor\n";
The duplicated condition is deliberate: the test and the message are separate jobs, and keeping both next to the do-while’s exit makes the contract readable. (A bool named valid folding it is also fine — say which you chose and why.)
S21 — Robust reader
int a = 0;
std::cout << "Number: ";
std::cin >> a;
while (std::cin.fail()) {
std::cin.clear();
std::cin.ignore(1000, '\n');
std::cout << "Whole numbers only — try again: ";
std::cin >> a;
}
// ... repeat for b, then print a + b ...
Feeding abc then 12: first read fails, message prints, line cleared, second read succeeds. The user sees one scolding, not a crash and not an infinite scroll (I/O Lesson 2 is the anatomy).
S22 — First over 100
int found = -1;
for (int i = 1; i <= 10; i = i + 1) {
int x;
std::cin >> x;
if (x > 100) { found = x; break; }
}
if (found == -1) std::cout << "None\n";
else std::cout << "First: " << found << '\n';
Inputs 4 95 210 88 ...: passes 1–2 record nothing, pass 3 sets found=210 and breaks — passes 4–10 never run. The trace’s missing rows are the whole point of break (Lesson 3 §2).
S23 — Odd sum, continue and not
int n;
std::cin >> n;
int total = 0;
for (int k = 1; k <= n; k = k + 1) {
if (k % 2 == 0) continue;
total += k;
}
// no-continue version:
int total2 = 0;
for (int k = 1; k <= n; k = k + 1) {
if (k % 2 != 0) total2 += k;
}
Honest comparison: for a two-line body the plain if reads faster. continue earns its keep when the keep-going work is long — e.g. ten statements that shouldn’t be indented under a negative condition. Either answer with a stated reason is correct.
S24 — Another round
char again;
double c;
do {
std::cout << "Celsius: ";
std::cin >> c;
std::cout << "Fahrenheit: " << c * 9.0 / 5.0 + 32.0 << '\n';
std::cout << "Another? (y/n): ";
std::cin >> again;
} while (again == 'y' || again == 'Y');
Trace with 25 then t then n: round 1 runs (25 → 77), prompt answered t → neither y nor Y → loop exits without a second round. The y/Y pair handles Caps Lock — the polite version of a compound condition.
S25 — Digit stats
int n;
std::cin >> n;
int sum = 0, count = 0;
while (n > 0) {
sum += n % 10;
count += 1;
n = n / 10;
}
std::cout << "Digits: " << count << ", sum: " << sum << '\n';
Trace 9045: last 5 (sum 5, count 1, n 904) → 4 (9, 2, 90) → 0 (9, 3, 9) → 9 (18, 4, 0) → exit. Output Digits: 4, sum: 18. Input 0: loop runs zero times → Digits: 0, sum: 0. Whether “0 has 0 digits” is correct is a requirements question — state the assumption (Problem Solving §7).
S26 — Reverse and palindrome
int n;
std::cin >> n;
int original = n; // the loop consumes n — copy first
int rev = 0;
while (n > 0) {
rev = rev * 10 + n % 10;
n = n / 10;
}
if (rev == original) std::cout << "Palindrome\n";
else std::cout << "Not a palindrome\n";
4729: rev 9 → 92 → 927 → 9274 ≠ 4729 → no. 121: rev 1 → 12 → 121 == 121 → yes.
S27 — Factorials
int fact = 1; // 0! = 1 lives here already
std::cout << "0! = " << fact << '\n';
for (int k = 1; k <= 10; k = k + 1) {
fact *= k;
std::cout << k << "! = " << fact << '\n';
}
The surprise line: 0! = 1 — produced by a loop that never runs (the empty-loop-is-the-answer case from Lesson 4 §4). Most students expect 0! to be 0; the multiplying accumulator starting at 1 says otherwise, and mathematics agrees.
S28 — Primes 2 to 50
for (int n = 2; n <= 50; n = n + 1) { // candidates
int divisors = 0;
for (int d = 1; d <= n; d = d + 1) { // divisor test
if (n % d == 0) divisors += 1;
}
if (divisors == 2) std::cout << n << '\n'; // n ≥ 2 guaranteed here
}
Early-exit upgrade inside the inner loop:
for (int d = 1; d <= n && divisors <= 2; d = d + 1) {
if (n % d == 0) divisors += 1;
}
The condition divisors <= 2 in the header is the cleaner early exit — no break needed, and the stop-rule is visible in the loop’s contract. Expected output starts 2 3 5 7 11 13 17 19 23 29 31 37 41 43 47.
S29 — Star triangle
int n;
std::cin >> n;
for (int r = 1; r <= n; r = r + 1) {
for (int c = 1; c <= r; c = c + 1) { // rule: row r has r stars
std::cout << "* ";
}
std::cout << '\n';
}
Inner condition c <= r — the inner bound depends on the outer variable (Lesson 4 §5). Rows 1–3 for n=4: *, * *, * * *.
S30 — Number triangle
int n;
std::cin >> n;
for (int r = 1; r <= n; r = r + 1) {
for (int c = 1; c <= r; c = c + 1) {
std::cout << c << ' '; // prints the COLUMN number
}
std::cout << '\n';
}
The printed value tracks the column (each row counts 1, 2, 3…). Swap c for r and you get 1 / 2 2 / 3 3 3 — one character apart, completely different triangle. Patterns are decided by which variable you print.
S31 — Multiplication grid
#include <iostream>
#include <iomanip>
int main() {
std::cout << " *";
for (int c = 1; c <= 5; c = c + 1) std::cout << std::setw(4) << c;
std::cout << '\n';
for (int r = 1; r <= 5; r = r + 1) {
std::cout << std::setw(4) << r;
for (int c = 1; c <= 5; c = c + 1) {
std::cout << std::setw(4) << r * c;
}
std::cout << '\n';
}
return 0;
}
Two nested loops plus one header loop: outer = rows, inner = columns, setw(4) aligns every cell (I/O Lesson 1 doing its job inside a grid).
S32 — FizzBuzz
for (int m = 1; m <= 30; m = m + 1) {
if (m % 15 == 0) std::cout << "FizzBuzz\n"; // both — MUST be first
else if (m % 3 == 0) std::cout << "Fizz\n";
else if (m % 5 == 0) std::cout << "Buzz\n";
else std::cout << m << '\n';
}
m % 15 == 0 (or % 3 == 0 && % 5 == 0) must be tested first because the most-demanding-first ladder from Decisions Lesson 1 applies: 15 is a multiple of 3, so a Fizz-first ladder would swallow every FizzBuzz forever. The compound case outranks its ingredients.