Mini-Project — The Text Analysis Toolkit
← Module home · Unit 10–11 capstone · Built in six progressive milestones
In the Functions module you built the Menu-Driven Utility Toolkit — numbers in, numbers out. This project replaces the numeric desks with a text desk: one program, a menu, and a growing set of analyses over a block of text the user enters once per session.
You have built every part already — Labs 3, 4, 5, and 7 are the components. The project is the composition.
The product
A menu program with these options:
| # | Command | What it does |
|---|---|---|
| 1 | Enter text | Reads lines until a blank line (replaces the working block) |
| 2 | Character profile | Counts: chars, letters, digits, spaces, punctuation, upper, lower (Lab 3) |
| 3 | Word report | Lines, words, chars, longest word + its line, avg word length (Lab 4) |
| 4 | Search | Reads a target word, lists numbered lines containing it (Lab 5’s rules) |
| 5 | Sentence stats | Sentences, avg sentence length, vowels-per-word (Lab 7) |
| 6 | Replace word | Asks for old + new word (both words, >>), replaces whole-word matches only |
| 7 | Quit | Prints the session summary, exits |
Session summary on quit: how many text blocks were entered, how many searches ran, how many replacements were made.
Data model (decide it before milestone 1)
The block is lines, and lines are few — store them:
const int MAXLINES = 100;
std::string lines[MAXLINES];
int lineCount = 0; // the capacity + count convention (Unit 09)
Every command is a function taking const std::string lines[], int lineCount (option 6 needs a non-const array — it edits). No globals. The menu loop is do-while + switch (repetition Lesson 3 + functions Lesson 1).
Milestones
M1 — Skeleton + Enter text. Menu loop with stubs (each prints TODO and returns). Option 1 reads lines into the array until blank or capacity — with the capacity guard message. Test: enter 2 lines, run option 1 again with 1 line — the block must be replaced (lineCount reset), not appended.
M2 — Character profile. Port Lab 3’s classifier into void charProfile(const std::string lines[], int n) — loop over lines, accumulate. Empty block → NO DATA message, no crash. Test: Hello, World! 42 → letters 10, digits 2, spaces 3, punct 2 (the sums-add-up invariant holds per line).
M3 — Word report. Port Lab 4 (per-line word machines + global accumulators + longest-word champion with line number). Test: the two-line lab input → lines 2, words 7, chars 29, longest quick line 1, avg 3.6.
M4 — Search. Port Lab 5’s reader choreography (>> target + ignore) and case-heuristic. Report matches with line numbers + summary. Test: target at over The cat sat / dogs run → line 1 matches, 1 total.
M5 — Sentence stats. Port Lab 7’s composition (word machine + sentence transition counter + derived ratios). Test: the lab’s two-line input → 8 words, 3 sentences, avg word length 4.4, vowels/word 0.88.
M6 — Replace + session summary. Whole-word replace: for each line, find candidate words (C7’s splitter or the word machine), rebuild the line when a word matches exactly (case-sensitive — document it). Count replacements for the summary. Rebuild rule: build-new (gallery S6) — never erase-while-traversing. Test: block the cat sat on the mat, replace the → a → a cat sat on a mat, 2 replacements (not 3 — the inside… there is no substring trap here since words only — that’s the point of whole-word).
Deliverables
- The program — every command a function, no globals, capacity-guarded storage.
- A test table — per command: input, expected output (hand-traced), actual, PASS/FAIL. Minimum 10 rows covering every command including the empty-block and capacity cases.
- A design note (half a page): which lab each function came from, what had to change when a line became one-of-many (the accumulate-over-lines refactor), and one thing you’d store differently for a 10,000-line file (honest seam: vectors and files are Units 14+).
Reference skeleton (start here, then grow)
#include <iostream>
#include <string>
#include <cctype>
#include <iomanip>
const int MAXLINES = 100;
// ---- M1 -------------------------------------------------------------
void enterText(std::string lines[], int& lineCount) {
std::cout << "Enter lines (blank line to finish):\n";
lineCount = 0; // replace, not append
std::string line;
while (lineCount < MAXLINES && std::getline(std::cin, line) && !line.empty())
lines[lineCount++] = line;
if (lineCount == MAXLINES)
std::cout << "(capacity reached - extra lines ignored)\n";
}
// ---- M6 (stub becomes real last) ------------------------------------
void replaceWord(std::string lines[], int lineCount, int& replacements) {
replacements = 0;
// TODO M6
}
int main() {
std::string lines[MAXLINES];
int lineCount = 0;
int sessions = 0, searches = 0, replacements = 0;
int choice;
do {
std::cout << "\n1-enter 2-profile 3-words 4-search 5-sentences 6-replace 7-quit: ";
std::cin >> choice;
std::cin.ignore(1000, '\n'); // every >> is followed by getline-ready state
switch (choice) {
case 1: enterText(lines, lineCount); sessions += 1; break;
case 2: /* TODO M2 */ break;
case 3: /* TODO M3 */ break;
case 4: /* TODO M4 */ searches += 1; break;
case 5: /* TODO M5 */ break;
case 6: replaceWord(lines, lineCount, replacements); break;
case 7: break;
default: std::cout << "1-7 please.\n";
}
} while (choice != 7);
std::cout << "blocks=" << sessions << " searches=" << searches
<< " replacements=" << replacements << '\n';
}
Three subtleties to notice (they’re in the skeleton on purpose):
std::cin.ignore(1000, '\n')after every>>— options 4 and 6 use getline, so the menu’s own>>is the mixing trap in waiting (gallery S2).enterTexttakesint&— the count must flow back out; pass-by-value would silently drop it (functions Lesson 3).replacementsis accumulated across calls and printed once — state that lives between commands lives inmainand is passed down, never globalized (functions Lesson 2’s global ban).
Self-check before you call it done
- Every command works on an empty block without crashing
- Replacing text twice replaces (not appends)
- The invariant
letters + digits + punct + spaces = charsholds in option 2’s output - Option 6 counts whole words only (
the≠they) - No globals; every function has its test rows in the deliverable table
- The functions-module toolkit’s summary block and this one would pass the same review — compare and note one thing each did better