Strings Challenges (10)

← Module home · Attempt 30 minutes before reading any solution. Challenges combine several tools — sketch the pipeline (read → validate → transform → report) before coding. Solutions separated at the end; each gives the approach plus the key code.


C1 — The palindrome judge (★★)

Write a program that reads lines until an empty one and reports for each whether it is a palindrome ignoring case and non-letters. So "A man, a plan, a canal: Panama" → yes, "hello" → no, "" ends the loop.

Requirements: normalize first (letters only, lowercase) into a working copy; palindrome-check the copy; preserve the original for display. Test: the Panama line, "racecar", "12321", "Was it a car or a cat I saw?".

C2 — The word reverser (★★)

Read a sentence and print it with each word reversed but word order and spacing structure kept: "hello world" → "olleh dlrow". Must handle multiple spaces gracefully (structure preserved: "a b" → "a b" reversed-words = "a b" with a,b flipped). Hint: walk word-by-word, not char-by-char — build words, reverse each, rejoin.

C3 — The Caesar both ways (★★)

Extend E24: a menu program with encrypt (shift +k), decrypt (shift −k), and brute force (try all 26 shifts on a ciphertext, print all 26 candidates). Decryption = encryption with 26 - k — prove it with "khoor" shifted back 3 → "hello". Brute force is the classic codebreaking demo — for "khoor" one of the 26 lines reads hello.

C4 — The title formatter (★★)

Normalize a name/title to headline case: every word capitalized, but small words (a, an, the, and, or, of, in, on) lowercase — unless first or last word. "the lord of the rings" → "The Lord of the Rings". Pipeline: lowercase-all → walk words → capitalize non-small (or first/last). Test: "war and peace", "the end" — double spaces must not crash it.

C5 — The CSV field counter (★★★)

Read lines of comma-separated fields (names only, no commas inside fields) and report per line: number of fields, longest field, and the shortest. "ali,ayesha,zain" → 3 fields, longest ayesha (7). Handle: trailing comma ("a,b," → 3 fields, last is empty — count it honestly), empty line (0 fields), a line that is just "," (2 empty fields). No vector needed — stream the fields with find(',') + substr, one at a time.

C6 — The duplicate-word spotter (★★★)

Read a line; report the first word that appears twice anywhere in the line (case-insensitive), or “none”. "The cat and the hat" → the (position 3). Strategy: for each word (extract with the C5/C7 splitting technique), search the rest of the line case-insensitively for a second occurrence. Keep it O(n²) — clarity first.

C7 — The field-splitter generalization (★★★)

Write int split(const std::string& line, char sep, std::string out[], int maxOut) — fills out with the fields, returns the count (arrays as function params from Unit 09). Handles: consecutive separators (empty fields), leading/trailing separators, maxOut overflow (return −1, or count anyway and don’t write past — document the policy). This is the tool Lab 7 and the toolkit’s next stage will want. Test: "a,,b" → 3 fields (middle empty), "a,b,c,d" with maxOut 2 → documented behaviour.

C8 — The sentence case fixer (★★★)

Text arrives as "HELLO there. HOW are you? i AM FINE." — fix sentence case: sentence starts (after ., !, ?, or at position 0) uppercase, everything else lowercase. → "Hello there. How are you? I am fine." State machine again: atStart flag set true initially and after each terminator; letters flip accordingly. Spaces, terminators, digits pass through untouched. Test the i AM → I am special case… or document why you skip it (a truly complete solution uppercases standalone i — attempt it as an extension).

C9 — The run-length encoder (★★★)

Encode text as letter+count runs: "aaabbbcccc" → "a3b3c4". Runs of 1 stay bare: "abc" → "abc". Then write the decoder: "a3b3c4" → "aaabbbcccc", bare letters expand to themselves. Round-trip property: decode(encode(s)) == s — test it on 6 strings including "", "a", "abab". This is data compression’s baby picture — and a perfect build-new drill.

C10 — The blank-line paragraph splitter (★★★)

Read all lines; paragraphs are separated by blank lines. Output: paragraph count, per-paragraph line counts, and the longest paragraph (by total chars). Also trim each paragraph’s edge spaces when reporting its first/last line. This is the toolkit’s report-builder in miniature — pipeline: state machine over lines (in-paragraph vs between), accumulate per-paragraph stats, emit at transitions.


Solutions (approaches + key code)

C1 — Palindrome judge

Approach. Per line: build clean (lowercased letters only — cctype filter), compare clean with its reverse (backward traversal + +=), report on the original.

std::string clean;
for (int i = 0; i < line.length(); i = i + 1)
    if (isalpha(line[i])) clean += tolower(line[i]);
std::string rev;
for (int i = clean.length() - 1; i >= 0; i = i - 1) rev += clean[i];
std::cout << line << " -> " << (clean == rev && !clean.empty() ? "YES" : "NO") << '\n';

Empty line terminates the read-loop (sentinel). Panama: letters = amanaplanacanalpanama — palindrome ✓. "12321" → no letters → clean empty → NO (document the policy: no letters = not a palindrome… or accept digit-palindromes by relaxing the filter to isalnum — a one-word change, choose and document).

C2 — Word reverser

Approach. State machine over chars: accumulate a word (non-space run), on space-or-end reverse the accumulated word into the output, emit the space verbatim. Multiple spaces: no word between them — the verbatim space handles it.

std::string word, out;
for (int i = 0; i <= line.length(); i = i + 1) {
    if (i == line.length() || isspace(line[i])) {
        for (int j = word.length() - 1; j >= 0; j = j - 1) out += word[j];
        word = "";
        if (i < line.length()) out += line[i];   // keep the space
    } else {
        word += line[i];
    }
}

The i == length() virtual-space flushes the final word — the classic “process the last group” trick. "a b" → two verbatim spaces preserved ✓.

C3 — Caesar both ways

Approach. One shift function used by all three options. Decrypt: shift by (26 - k) % 26. Brute force: loop k = 0..25, encrypt the ciphertext with each, print.

std::string shiftBy(const std::string& text, int k) {
    std::string out;
    for (int i = 0; i < text.length(); i = i + 1) {
        char c = text[i];
        if (islower(c))      c = (c - 'a' + k + 26) % 26 + 'a';
        else if (isupper(c)) c = (c - 'A' + k + 26) % 26 + 'A';
        out += c;
    }
    return out;
}
// decrypt: shiftBy(text, 26 - k);   brute: for (int k = 0; k < 26; k = k + 1) ...

The + 26 before % keeps negative shifts safe (C++ % of a negative can be negative — this sidesteps it). "khoor" − 3 → hello ✓; brute force prints all 26, hello among them.

C4 — Title formatter

Approach. Lowercase everything; walk words (C2’s state machine); capitalize a word if it’s not small OR it’s the first/last word. Track word index (or first/last flags).

bool isSmall(const std::string& w) {
    std::string small[] = {"a","an","the","and","or","of","in","on"};
    for (int i = 0; i < 8; i = i + 1) if (w == small[i]) return true;
    return false;
}
// per word: if (!isSmall(w) || firstWord || lastWord) w[0] = toupper(w[0]);

First/last words need either their indices (count words first — a pre-pass) or: apply after building all words in an array (Unit 09 style), where indices 0 and count−1 are known. "war and peace" → War and Peace ✓ (and is small, middle position). Double spaces: the state machine skips empty words — no crash.

C5 — CSV field counter

Approach. Per line: stream fields with find/substr — p = find(','); field = substr(0, p); rest = substr(p+1); repeat until npos. Track count/max/min as you go.

std::string rest = line; int count = 0;
int maxLen = -1, minLen = 1 << 30;
std::string maxF = "", minF = "";
while (true) {
    std::size_t p = rest.find(',');
    std::string field = (p == std::string::npos) ? rest : rest.substr(0, p);
    // update count, maxLen/maxF, minLen/minF with field ...
    count += 1;
    if (p == std::string::npos) break;
    rest = rest.substr(p + 1);
}

"a,b," → fields a, b, `` → 3 (the trailing comma ends a field — count it). "" → the loop still runs once with field "" → 1… policy: report empty line as 0 fields with a pre-guard (if (line.empty())). "," → 2 empty fields ✓.

C6 — Duplicate-word spotter

Approach. Extract words into an array (C7’s splitter, space separator); normalize each to lowercase; for each word i, scan words i+1.. for a match; first hit wins.

// words[] from split(); lowercased in place
int found = -1;
for (int i = 0; i < n && found == -1; i = i + 1)
    for (int j = i + 1; j < n; j = j + 1)
        if (words[i] == words[j]) { found = i; break; }

"The cat and the hat" → lowercased the,cat,and,the,hat → words[0] the matches words[3] → report the. Case-insensitive because of the lowercase pass — D2’s normalize-then-compare at array scale.

C7 — Field splitter

Approach. Walk with find; store into out[]; guard maxOut (don’t write past capacity — count fields even when the array is full, per the documented policy).

int split(const std::string& line, char sep, std::string out[], int maxOut) {
    int count = 0;
    std::string rest = line;
    while (true) {
        std::size_t p = rest.find(sep);
        std::string field = (p == std::string::npos) ? rest : rest.substr(0, p);
        if (count < maxOut) out[count] = field;
        count += 1;
        if (p == std::string::npos) break;
        rest = rest.substr(p + 1);
    }
    return count;   // caller compares count vs maxOut for overflow
}

Policy: the function always returns the true field count; it writes only the first maxOut. Caller: if (count > maxOut) /* overflow handling */. "a,,b" → 3 fields (a, ``, b) ✓. This generalizes C5 and powers Lab 7 — and the same signature pattern (array + capacity + count) is Unit 09’s convention.

C8 — Sentence case fixer

Approach. Build-new state machine: atStart = true; per char — if terminator (.!?) set atStart and emit verbatim; if letter: emit upper if atStart else lower, clear atStart; else emit verbatim.

bool atStart = true;
for (int i = 0; i < text.length(); i = i + 1) {
    char c = text[i];
    if (c == '.' || c == '!' || c == '?') { atStart = true; out += c; }
    else if (isalpha(c)) {
        out += atStart ? toupper(c) : tolower(c);
        atStart = false;
    } else out += c;
}

Input "HELLO there. HOW are you? i AM FINE." → Hello there. How are you? I am fine. — wait: i after ? is a sentence start → uppercased to I automatically — the standalone-i case handles itself here because i AM opens the sentence. (A standalone mid-sentence i — "what am i doing" — would need the extension: also uppercase when the previous non-space char run is just i bounded by spaces. Attempt it.) Leading spaces before a sentence start don’t break it: atStart survives non-letters.

C9 — Run-length encoder/decoder

Approach. Encode: state machine — track current run char and count; on change-or-end, emit c (+ count if > 1). Decode: walk; digit = count multiplier for the previous letter; letter = emit immediately (count 1 pending).

// encode (core)
std::string out;
char cur = 0; int run = 0;
for (int i = 0; i <= s.length(); i = i + 1) {
    if (i < s.length() && s[i] == cur) { run += 1; }
    else {
        if (run == 1) out += cur;
        else if (run > 1) { out += cur; out += std::to_string(run); }
        if (i < s.length()) { cur = s[i]; run = 1; }
    }
}

The virtual-end step (i == s.length()) flushes the final run; cur = 0 can never match a real char, so the first letter always starts a fresh run.

// decode (core)
std::string out; char last = 0;
for (int i = 0; i < t.length(); i = i + 1) {
    if (isdigit(t[i])) {
        int n = t[i] - '0';
        for (int j = 0; j < n - 1; j = j + 1) out += last;  // n-1: first already emitted
    } else { out += t[i]; last = t[i]; }
}

Multi-digit counts (a12) need a digit-run accumulator — the extension. Round-trip on "", "a", "abab", "aaabbbcccc" ✓. (Single digits only in the base version — document it.)

C10 — Paragraph splitter

Approach. Read lines in a sentinel loop (empty line ends input); inPara state machine: blank line → close paragraph (emit stats, reset accumulators); content line → add to current paragraph’s line-count and char-total. End of input closes the final paragraph. Track longest by char-total; remember its first/last lines (trim with a helper that strips edge spaces — or report line.substr(first non-space, last non-space + 1) bounds).

// per content line:
paraLines += 1; paraChars += line.length();
if (paraLines == 1) firstLine = line;    // no trim needed for counting
lastLine = line;
// per blank line / EOF: emit paraLines, paraChars; if paraChars > best: best = paraChars...

Trim for display: find first/last non-space, substr between. Empty input → 0 paragraphs (guard the final emit). This is the state-machine-over-lines pattern — the same one C2/C8 used over chars, one level up.