Strings Exercises (26)
← Module home · ★ = first pass · ★★ = needs the toolkit · ★★★ = combines ideas
How to use this page. Attempt 15 minutes before opening any solution. Write out the boxes — draw the string with indices — before coding anything that slices or indexes.
Part A — Two ways, creation, input (★, E1–E7)
E1. Create three strings three ways: empty, from a literal, and as a copy of another. Change the original and prove the copy is independent (print both).
E2. Declare a character array holding "cat" and draw its boxes including the terminator — how many boxes does the array have vs the string? Then state what a == b compares for two such arrays, and the correct text comparison.
E3. Read a username with >> and a full name with getline in one program — insert the mixing-trap fix and explain in one comment line why it’s needed. Test with akhan / Ayesha Khan.
E4. Read a line with getline and print: its length, its first char, its last char (careful: which index?), and the result of empty() for an empty input line.
E5. The five-sentence comparison drill — predict true/false for each, then verify:
(a) "apple" == "Apple" (b) "app" < "apple" (c) "10" < "9" (d) "b" > "a" (e) "Zebra" < "apple".
E6. Build the string "Unit-11!" from pieces: start from "Unit", += the char '-', += the string "11", += the char '!'. Print at each step (four states).
E7. Read two words with >> and print them in dictionary order (the smaller first). Test with pear apple and Apple apple — the second pair needs one sentence of explanation.
Part B — Indexing, traversal, concatenation (★★, E8–E13)
E8. Print a string one char per line with its index: 0: p style. Then backward. Trace the backward loop’s three parts (init/condition/update) in a table first.
E9. Count the vowels in a line (case-insensitive — tolower first). Trace on "Arrays are Fun" — expected 5.
E10. Count words in a line using the space-transition method (state machine): a word starts at a non-space preceded by a space or index 0. Test on " one two three " — expected 3 (double spaces!).
E11. Build the acronym of a name: "Ayesha Khan" → "AK". Rule: the first char, plus every char that follows a space. (Traversal + a previous-char variable.)
E12. Reverse a string by building a new one (backward traversal + +=), then check palindrome-ness against the original (compare content — "mom" yes, "hello" no).
E13. Concatenation drills — write the value and the verdict (works / compile error) for:
(a) "a" + "b" (b) s + "b" (s is a string) (c) "Total: " + 5 (d) s += '!' (e) "a" + s + "b".
Part C — Find, substr, modify, cctype (★★, E14–E19)
E14. Find drills on "the quick brown fox jumps over the lazy dog":
(a) index of "fox" (b) index of the second "o" (c) index of "cat" and the verdict it returns (d) index of "the" starting from index 5.
E15. Extract drills on "Programming-Fundamentals" — write the exact call and result:
(a) first 11 chars (b) chars from index 12 to the end (c) "Fund" (d) the last 11 chars without hard-coding the length (use length()).
E16. The substring-length trap: text = "abcdef". What are text.substr(1, 3), text.substr(1, 2), text.substr(3, 99), and which of the three clips silently?
E17. Split a line at its first space into first word and rest — with the no-space guard. Test on "hello world", "oneword", and "".
E18. Normalize a name: read " aYeSha kHAN " style input (well — read any line) and produce "AyeshA KHAN"-style output… precisely: lowercase everything except the first char of the line, which becomes uppercase. (Build-new + cctype.)
E19. Insert/erase/replace drills on "hello world" — state the result after each sequential step:
(a) insert(5, ",") (b) erase(0, 7) (c) replace(0, 1, "J") — then explain why doing these in the reverse order on fresh copies gives a different result.
Part D — Conversions and integration (★★–★★★, E20–E26)
E20. stoi drills — result or behaviour for: "42", " 42abc", "-17", "3.9", "abc", "". Which two need validation before the call, and what does each look like?
E21. Write bool allDigits(const std::string& s) (Lesson 4 §1) and a driver testing "", "123", "12a3", " 12". Then use it to make a safe toInt that returns −999 on junk (documented sentinel).
E22. Char-arithmetic drills: (a) '8' - '0' (b) 'b' - 'a' (c) what does 'A' + 2 give? (d) convert the digit chars "2051" to the int 2051 with the * 10 + (c - '0') accumulator — trace three steps.
E23. Digit-sum of a numeric string: "4729" → 22, one pass, no stoi. Then: what changes if the string might contain a minus sign? (State the policy; handle it.)
E24. Caesar cipher (the syllabus Unit 11 challenge): shift each letter by 3, wrapping z→c, preserving case, leaving non-letters alone: "Hello, World!" → "Khoor, Zruog!". Build-new + cctype + the wrap trick ((c - 'a' + 3) % 26 + 'a' — derive it on paper first).
E25. The S24-style robust reader returns: write readIntInRange(prompt, lo, hi) that reads a line with getline, validates with allDigits (then stoi), re-prompts on junk or range miss — the string-based reader your toolkit has been waiting for. Feed it abc, 150, 12 in the test.
E26. Gallery drills — name the mistake (S1–S10) in each:
(a) if (name1 == name2) where both are char[20]
(b) cin >> n; getline(cin, line);
(c) s.substr(2, 5) intended as “from index 2 to index 5”
(d) size_t p = s.find('x'); cout << s[p];
(e) for (i = 0; i < s.length(); i++) if (s[i] == 'a') s.erase(i, 1);
Solutions (S1–S26)
S1 — Three creations
std::string a; // empty
std::string b = "origin"; // literal
std::string c = b; // independent copy
b = "changed";
// prints: a="" (len 0), b="changed", c="origin"
c = b copied the text — assignment is deep for strings (the array-= trap doesn’t exist here).
S2 — Char-array boxes
char a[6] = "cat"; — array: 6 boxes (c a t \0 + 2 unused); string: 3 chars (ends at the terminator). a == b compares array addresses — always false for two separate arrays (gallery S1); the text comparison is strcmp(a, b) == 0.
S3 — Mixed readers
std::string user, full;
std::cin >> user;
std::cin.ignore(1000, '\n'); // mixing-trap fix: eat the newline >> left behind
std::getline(std::cin, full);
Without the ignore, getline reads that leftover newline as an empty line — gallery S2.
S4 — Line report
std::getline(std::cin, line);
if (line.empty()) { std::cout << "empty\n"; return 0; }
std::cout << line.length() << ' ' << line[0] << ' '
<< line[line.length() - 1] << ' ' << line.empty() << '\n';
Last index = length() - 1 — the bounds rule; the emptiness guard before line[0] is gallery S10.
S5 — Comparisons
(a) false (case) · (b) true (prefix smaller) · (c) true ('1' < '9' — lexicographic!) · (d) true · (e) true ('Z' 90 < 'a' 97). Rules: Lesson 2 §4.
S6 — Build “Unit-11!”
"Unit" → "Unit-" → "Unit-11" → "Unit-11!". Each += appends — a char or a string, both legal (a std::string is on the left, so += never has the literal-trap problem).
S7 — Dictionary order
if (a <= b) std::cout << a << ' ' << b << '\n';
else std::cout << b << ' ' << a << '\n';
pear apple → apple, pear. Apple apple → Apple apple — already in order because 'A' < 'a': uppercase sorts before lowercase in code order. One sentence: lexicographic comparison is code-based, not case-blind.
S8 — Per line
for (int i = 0; i < n; i = i + 1) std::cout << i << ": " << s[i] << '\n';
for (int i = n - 1; i >= 0; i = i - 1) std::cout << i << ": " << s[i] << '\n';
Backward: init n-1 (last valid), condition i >= 0, update i -= 1 — the backward traversal unchanged for text.
S9 — Vowels
int vowels = 0;
for (int i = 0; i < line.length(); i = i + 1) {
char c = tolower(line[i]);
if (c=='a'||c=='e'||c=='i'||c=='o'||c=='u') vowels += 1;
}
"Arrays are Fun" → a,a,e,u (lowercased a,r,r,a,y,s… contains a,a,a,e,u) — count: 5 ✓ (a-A-r-r-a-y-s = a,a,a? trace honestly: A→a ✓, r, r, a ✓, y, s, a ✓, r, e ✓, F, u ✓, n → 5).
S10 — Words
int words = 0;
bool inWord = false;
for (int i = 0; i < line.length(); i = i + 1) {
bool isSpace = isspace(line[i]);
if (!isSpace && !inWord) words += 1;
inWord = !isSpace;
}
" one two three ": transitions at indices 1, 6, 10 → 3 ✓. The double-space is handled by the state machine — inWord blocks a second count while inside a word.
S11 — Acronym
std::string acronym;
if (!name.empty()) acronym += name[0];
for (int i = 1; i < name.length(); i = i + 1) {
if (isspace(name[i - 1]) && !isspace(name[i])) acronym += name[i];
}
"Ayesha Khan" → A … K → "AK". The previous-char variable (name[i-1]) is the boundary detector — E10’s method with a build instead of a count.
S12 — Reverse, palindrome
std::string rev;
for (int i = line.length() - 1; i >= 0; i = i - 1) rev += line[i];
if (rev == line) std::cout << "palindrome\n";
"mom" → rev "mom" == original ✓; "hello" → "olleh" ≠. (Case-sensitive here — "Mom" fails; a normalization pass is the E18 trick.)
S13 — Concat drills
(a) compile error — no string operand. (b) works. (c) compile error — literal + int (S7 trap; fix: std::to_string(5)). (d) works — += with a char. (e) works — left-to-right: "a" + s is string+string, then + "b" fine.
S14 — Find drills
(a) 16 · (b) first 'o' at 12 (brown), second: find('o', 13) → 17 (fox) — the start-index overload · (c) "cat" → npos (absent) · (d) find("the", 5) → 31 — skipping the index-0 hit.
S15 — Substr drills
(a) substr(0, 11) → "Programming" · (b) substr(12) → "Fundamentals" · (c) substr(12, 4) → "Fund" · (d) substr(text.length() - 11) → "Fundamentals" (computed, not hard-coded).
S16 — Length trap
substr(1, 3) → "bcd" (3 chars from 1) · substr(1, 2) → "bc" · substr(3, 99) → "def" — this one clips silently: start 3 valid, length clipped to what exists (Lesson 3 §2).
S17 — Split
std::size_t sp = line.find(' ');
if (sp == std::string::npos) { first = line; rest = ""; }
else { first = line.substr(0, sp); rest = line.substr(sp + 1); }
"hello world" → hello/world · "oneword" → oneword/· `""` →/`` — all three guarded.
S18 — Normalize
std::string out;
for (int i = 0; i < line.length(); i = i + 1) {
char c = tolower(line[i]);
if (i == 0) c = toupper(c);
out += c;
}
Build-new, classify-convert per box — first char uppercased at the one special index.
S19 — Modify sequence
(a) "hello, world" · (b) from that, erase(0,7) → "world" · (c) replace(0,1,”J”) → "Jorld". Reversed order on fresh copies: replace first gives "Jello world"; then erase(0,7) → "orld"; then insert(5, “,”) → "orld,"… — order matters because each edit re-indices the string; there is no “same position” across edits.
S20 — stoi drills
"42"→42 · " 42abc"→42 (leading ws skipped, junk tail ignored — the silent one) · "-17"→−17 (sign handled) · "3.9"→3 (stops at '.'!) · "abc"→throws · ""→throws. The last two need validation first (Lesson 4 §1).
S21 — allDigits + safe toInt
bool allDigits(const std::string& s) {
if (s.empty()) return false;
for (int i = 0; i < s.length(); i = i + 1)
if (!isdigit(s[i])) return false;
return true;
}
int toInt(const std::string& s) { // documented sentinel: -999 = junk
return allDigits(s) ? std::stoi(s) : -999;
}
Driver: ""→false, "123"→true, "12a3"→false, " 12"→false (the space fails isdigit — stricter than stoi, which skips leading ws: a policy decision, documented).
S22 — Char arithmetic
(a) 8 · (b) 1 · (c) 'C' (code 65+2) · (d) ""→0; '4': 0×10+4 = 4; '7': 4×10+7 = 47; '2': 47×10+2 = 472.
S23 — Digit sum of a string
int sum = 0;
for (int i = 0; i < text.length(); i = i + 1)
if (isdigit(text[i])) sum += text[i] - '0';
"4729" → 22. Minus sign policy: skip non-digits (the isdigit guard) — "−17" contributes 1+7=8; document that as “digit sum”, not “numeric value” — they’re different questions (E23’s honesty point).
S24 — Caesar
for (int i = 0; i < text.length(); i = i + 1) {
char c = text[i];
if (islower(c)) c = (c - 'a' + 3) % 26 + 'a';
else if (isupper(c)) c = (c - 'A' + 3) % 26 + 'A';
out += c; // non-letters pass through
}
Derivation: map to 0–25 (c - 'a'), shift, wrap (% 26), map back. "Hello, World!" → "Khoor, Zruog!" ✓ (H→K, e→h, l→o, o→r; comma/space untouched).
S25 — String-based reader
int readIntInRange(const char* prompt, int lo, int hi) {
while (true) {
std::cout << prompt;
std::string line;
std::getline(std::cin, line);
if (allDigits(line)) {
int v = std::stoi(line);
if (v >= lo && v <= hi) return v;
std::cout << "Between " << lo << " and " << hi << ".\n";
} else {
std::cout << "Whole numbers only.\n";
}
}
}
Feed abc → “Whole numbers only.” · 150 → range message · 12 → accepted. Survives everything — the getline+cctype combination has no fail-state to clear (no stream flag dance needed at all — that’s why professionals convert from lines).
S26 — Gallery drills
(a) S1 — C-string == · (b) S2 — the skip (needs ignore) · (c) S3 — second arg is length; substr(2, 3) is “2 to 5” · (d) S4 — npos unchecked · (e) S6 — erase drift (build-new instead).