Lab 12 — Recursion You Can Reason About (Lecture 22 follow-up)

Machine lab · 2 hours · Pairs. You will build recursions from their base cases up, watch the call tree explode, then pay it down with memoisation — and finish with the one-line criterion that decides when a loop beats a recursion. Submit: the checkpoints at the end.

Setup

Part A — Base cases first (25 min)

A1. Write recursive power2(n): 2ⁿ for n ≥ 0. Write the base case before the recursive case, as separate lines with a comment each. A2. Write recursive sum_digits(n). State your base case in terms of the value (not the digit count) and say why the distinction matters. A3. Hand-trace power2(4) as a call tree (draw it: one box per call). How many boxes? How many distinct arguments?

Part B — The tree that explodes (30 min)

B1. Write naive recursive fib(k) (fib(0)=0, fib(1)=1). Draw the call tree for fib(5): count the boxes and the number of times fib(2) is computed. B2. Add a call counter (global or wrapper). Verify your fib(5) drawing against the counter's number. Then predict fib(25)'s call count from the tree's growth rule before measuring; measure and compare. B3. In one sentence each: what does the tree waste, and what is the smallest structural change that stops the waste?

Part C — Paying the tree down (25 min)

C1. Add lru_cache to fib. Re-measure fib(25) and fib(100). The call count collapses — state what the memoised call count is in terms of k, and why (each distinct argument computed once; the recursion depth is now the only remaining cost). C2. Rewrite fib as a loop with two variables. Verify against the memoised version for k up to 30. Two sentences: which version is easier to justify (connect to Part A's base-case discipline), and which is easier to derive from the problem statement? C3. Swap with another pair: each pair brings one recursive problem (their choice from lecture 22's cases); the other decides, with a one-sentence justification, loop-or-recursion before writing any.

Part D — The criterion (10 min)

D1. State the lab's criterion in one sentence: when does a recursion's call tree cost more than the problem itself? (Hint: count distinct subproblems vs total boxes.) D2. cs-085 (dolls) and cs-088 (tower steps) are both recursive. One sentence each: linear tree or branching tree — and what does that single fact decide about needing memoisation?

Checkpoints (submit these as your report)

  1. The three Part A base-case-first functions and the A3 tree.
  2. Your fib(5) drawing with box and repeat counts.
  3. The B2 prediction-vs-measurement comparison.
  4. B3's two one-sentence answers.
  5. C1's collapsed counts and the in-terms-of-k claim.
  6. C2's loop version and the justify/derive comparison.
  7. The C3 exchange decisions.
  8. D1/D2.

What completion looks like

Completion-graded as in Lab 1. The graded skill is the tree accounting: box counts predicted before measuring, growth rules stated before extrapolating. A memoised fib with no story about why the tree collapsed earns half.

Safety valve

If the naive fib(25) measurement takes longer than about ten seconds on your machine, stop it (Ctrl+C) and measure fib(20) instead — then explain the ratio between your two measurements using the growth rule. Waiting is not data.