Lab 2 — Strings and Test Tables in Practice (Lecture 10 follow-up)

Machine lab · 2 hours · Work in pairs. You will build a small text tool driven by a test table you design before the code, then exchange test tables with another pair. Submit: a report answering the checkpoints.

Setup

Part A — Test table first (25 min)

A1. On paper, design a test table with at least 10 rows: columns are input, expected verdict, why this row exists. Cover: every rule's pass and fail side, every boundary of the length rule, and at least two inputs you think are clever. A2. Circle the two rows you believe are most likely to catch a defect.

Part B — Implement (35 min)

B1. Write lab2/verify.py with a function verdict(sid) returning the verdict string, plus a driver that runs your Part-A table: for each row, print input, expected, observed, and PASS/FAIL. B2. Run it. If any row fails, fix verdict — never change the expected column to make a row pass unless you can argue the row itself was wrong.

Part C — Exchange (30 min)

C1. Exchange test tables with another pair. Run their rows against your verdict. Report any failure in their format: input / expected / observed. C2. Negotiate: either their row encodes a rule yours lacks (fix your code), or the two tables disagree about the spec (write down the ambiguity — you will need it for checkpoint 5). C3. Add the best two of their rows to your table and re-run everything.

Part D — Normalisation stretch (20 min, optional)

D1. Real ID lists arrive with stray spaces and case noise: " CS101 " or "cs101". Add a preprocessing step and discuss: does normalising before verifying change any verdict? Which row of your table proves it?

Checkpoints (submit these as your report)

  1. Your Part-A table (photograph or transcription), with the circled rows.
  2. The final verify.py driver output for your table (all rows).
  3. Any row that failed in B2, the mechanism, and the fix.
  4. From C1–C2: one row your table lacked and one genuine spec ambiguity you and the other pair resolved.
  5. From D1 (if attempted): the normalisation rule and the row that shows its effect.
  6. One sentence: which circled row from A2 actually caught something, and which caught nothing — and what that taught you about designing tests before code.

What completion looks like

Completion-graded: a table of ≥ 10 deliberate rows, an honest driver run, and the exchange analysis. A table where every row passes and every row is obviously safe is a red flag — the exchange exists to break that comfort.