Lab 4 — Modelling with Graphs (Lecture 24 follow-up)

Machine lab · 2 hours · Work in pairs. You will model a campus situation as a graph, implement breadth-first search, and defend the modelling choices in writing. Submit: a report answering the checkpoints.

Setup

edges = [
    ("gate", "library"), ("gate", "canteen"), ("library", "cs-dept"),
    ("canteen", "cs-dept"), ("canteen", "gym"), ("cs-dept", "labs"),
    ("gym", "labs"), ("library", "hall"), ("hall", "theatre"),
    ("theatre", "labs"),
]

Edges are undirected: a path works in both directions. All edges cost one "hop" regardless of physical distance.

Part A — Model first (20 min)

A1. Draw (on paper) the graph from edges. Count nodes and edges. A2. Answer before coding: what is the fewest-hop route gate → labs? How many such minimal routes exist? Write your answers down — Part B will check them.

Part B — BFS by hand and in code (35 min)

B1. Run BFS by hand from gate: write each BFS level (0, 1, 2, 3, …) and its nodes. The level of a node is its fewest-hop distance. B2. Implement lab4/bfs.py: adjacency list from edges (build it with a loop — both directions!), BFS from a start node returning {node: distance}, unreachable nodes either absent or marked ∞ — your choice, but state it. B3. Run from gate. Compare with your hand-run and your A2 answers. Resolve any disagreement — the hand-run and the code must agree.

Part C — The unreachable case (20 min)

C1. Add edge ("annex", "theatre") and run BFS from annex and from gate. Record both outputs. Which nodes are unreachable from where? C2. Suppose the college adds a bus service: any two of {gate, hall, gym} become one hop apart. Add those edges. Does the eccentricity of gate (its maximum distance to any node) shrink? Show the numbers.

Part D — Defend the model (20 min)

D1. A colleague proposes a different model: nodes are rooms, not buildings, with edges for doorways. Name one question the room-level model answers that your building-level model cannot. D2. The physical distances between buildings are known. Name one question for which hop-count is the wrong cost — and what model change fixes it.

Checkpoints (submit these as your report)

  1. Your drawing's node and edge counts from A1, and your A2 predictions.
  2. The BFS levels from B1 and the program output from B3, side by side.
  3. Your stated convention for unreachable nodes (B2), and the C1 outputs for both starts.
  4. The C2 eccentricity answer with the before/after numbers.
  5. D1 and D2, one or two sentences each — the modelling defence is the heart of this lab.
  6. One thing the graph model cannot answer about the campus, however modelled.

What completion looks like

Completion-graded: hand-run and code must both appear and must agree; modelling answers must take a position and defend it, not hedge. "Both models are equally good" without an argument earns no checkpoint credit.