Lab 11 — Binary Search Everywhere (Lecture 21 follow-up)

Machine lab · 2 hours · Pairs. Two searches today: one on data (sorted catalogue), one on answers (a hidden threshold). Same loop, different predicate — after this lab the pattern, not the array, is the point. Submit: the checkpoints at the end.

Setup

Part A — Search the data (25 min)

A1. Implement first_ge(items, target): given a sorted list, return the index of the first item ≥ target, or len(items) if none. Write the loop with the invariant as a comment: items[lo] is the first possible answer; items[hi] is known ≥ target or out of range — in your own words, before coding. A2. Test at the boundaries: empty list, single item, target before all, after all, exact hit at 0, at last, duplicate targets (which index is "first"? — say what your loop guarantees). A3. Count probes on a 1000-item catalogue. Your count must be ≤ 10 — state why 10 is the right ceiling without mentioning code.

Part B — Search the answer (35 min)

B1. The scenario: the campus bridge takes time T to cross; a delivery must leave by deadline D; walking speed varies. The hidden function feasible(t) (instructor-provided bridge.py) answers "can a delivery leaving at time t make it by D?" — true for early t, false for late t. Find the latest feasible departure time with the same loop shape as Part A. You may call feasible at most 10 times. B2. Before coding: write the predicate's monotone claim in one sentence ("if time t works, then every earlier time works because …"). Your loop's correctness is this sentence. B3. The instructor's bridge.py includes a decoy: a feasible() that is almost monotone (one glitch at a random t). Run against it; explain the observed failure in terms of your B1 sentence (the glitch breaks the claim, so the loop's contract is void — the code was fine).

Part C — Instrument and prove (25 min)

C1. Add a call counter to both searches. Verify: Part A on 1000 items uses ⌈log₂ 1001⌉ probes or fewer; B1 uses ≤ 10 calls. Report the actual numbers. C2. Break a bound on purpose: change the update to hi = mid - 1 in the "first ≥" search and find an input that returns the wrong answer and one that loops forever. Which one you get depends on the parity of the interval — show both. C3. Hand the instrumented searches to another pair with no documentation. Their job: reconstruct the invariant from behaviour alone; your job: how close did they get?

Part D — Transfer (10 min)

D1. List two campus-scale questions that are "first position where a monotone predicate flips" but involve no sorted array. One sentence each on where the monotonicity comes from. D2. cs-083 (book allocation) searched the answer "minimum possible maximum load". One sentence: why could its feasibility predicate be checked greedily?

Checkpoints (submit these as your report)

  1. first_ge with your own-words invariant comment.
  2. The A2 boundary table with actual outputs.
  3. Your A3 probe count and its arithmetic justification.
  4. The B1 answer with your call count; the B2 monotone sentence.
  5. The B3 glitch explanation.
  6. C1's instrumented numbers; the C2 two failing inputs.
  7. The C3 reconstruction notes.
  8. D1/D2.

What completion looks like

Completion-graded as in Lab 1. The graded artefact is the invariant sentence: code that passes all tests with no invariant stated earns half; code with a correct invariant and one failing boundary earns full credit and one fix away from correct.