Files Labs (6 scenarios)
← Module home · Attempt each lab’s student tasks before opening its solution. Every lab: scenario → format contract → requirements → test data & expected results → student tasks → solution → explanation → ⭐ extensions. The first deliverable in every lab is the format contract — the exact bytes of the file, written as comments beside both the save and load code.
Ground rules. open → check → use → close on every stream, every time. Line-based reading for anything with spaces; the ignore rhythm at every >>-before-getline seam. Every lab ends with a round-trip verification: what you saved is what you loaded, or the format is buggy.
Lab 1 — Student Record File
Scenario. The Records module’s roster lives only while the program runs. Persist it: the roster survives between runs — the lab that turns the record round trip into a reflex.
Format contract.
// roster.txt — count-first, then per record (2 lines):
// <n>
// <full name>
// <score>
Requirements.
R1. saveRoster(const Student[], int n, const char*) — count line first; every field ends with its separator.
R2. loadRoster(Student[], int cap, const char*) — returns the count; missing file → 0 (documented contract); clamped to cap; ignore rhythm at every seam.
R3. Menu program: 1-add (validated) · 2-list · 3-save · 4-load · 5-quit. Quit auto-saves (the safety net — an owner that persists even when the user forgets).
R4. Round-trip proof built in: option 6 loads, lists, and compares against the in-memory count — printing round trip: OK or the mismatch.
Test data & expected results.
| Step | Input | Expected result |
|---|---|---|
| add 3 | Ayesha Khan/92, Ali Raza/78, Sana Mir/85 | in-memory list shows 3 |
| save | — | roster.txt = 7 lines: 3, then name/score pairs |
| inspect the file | (editor) | exactly: 3\nAyesha Khan\n92\nAli Raza\n78\nSana Mir\n85\n |
| quit (auto-save) | — | file unchanged (idempotent save) |
| restart, load | — | list shows the same 3, round trip: OK |
| delete file, load | — | 0 records, no error (the contract) |
| hand-edit count to 99, load | — | loads 0 real records without crashing (clamp + EOF stop) |
Student tasks.
- Write the contract comment first, then
saveRoster; inspect the file byte-for-byte against it. loadRosterwith all three guards (open, clamp, ignore seams) — then the hand-edited-count test.- Reflection: the auto-save on quit duplicates option 3. Why keep both (explicit user control + safety net) — and what would you ask the user if the file existed but the in-memory roster was unsaved? (The dirty-flag idea — next unit’s file.)
Solution (core).
void saveRoster(const Student roster[], int n, const char* filename) {
std::ofstream out(filename); // truncate: a save replaces the file
if (!out.is_open()) { std::cout << "cannot save\n"; return; }
out << n << '\n';
for (int i = 0; i < n; i = i + 1)
out << roster[i].name << '\n' << roster[i].score << '\n';
out.close();
}
int loadRoster(Student roster[], int cap, const char* filename) {
std::ifstream in(filename);
if (!in.is_open()) return 0; // missing = empty, by contract
int n = 0;
in >> n; in.ignore(1000, '\n'); // seam 1
if (n > cap) n = cap;
for (int i = 0; i < n; i = i + 1) {
std::getline(in, roster[i].name);
in >> roster[i].score;
in.ignore(1000, '\n'); // seams 2..n+1
}
return n;
}
Explanation. This is E13’s round trip scaled to a menu. The lab’s teaching point is the contract as artifact: the inspection row of the test table (file = exactly 7 specific lines) is what makes the load code provable — when the file’s bytes match the contract and the loader follows the contract, correctness is two local checks, not a mystery. The hand-edited count test is the D6 bug experienced from the defender’s side.
⭐ Extensions. ⭐ Add a version comment line (# v1) that the loader skips — the D9 amendment mechanism. ⭐⭐ Merge on load: loading into a non-empty roster appends, refusing duplicate names — a policy choice to document.
Lab 2 — Expense Tracker
Scenario. A daily ledger: append one expense per entry, load-and-report on demand. Append mode is the protagonist — history is the product.
Format contract.
// expenses.txt — append-only; one expense per line:
// <description>;<amount>
// ';' chosen because descriptions may contain commas/periods but never semicolons
Requirements.
R1. addExpense(desc, amount) — append mode, open check, close per record (durability: a crash must not lose a confirmed expense).
R2. loadExpenses(items[], cap) — returns count; splits each line on ';' (find/substr, Unit 11); malformed lines reported and skipped, not fatal.
R3. Report: all expenses + count + total (1 dp) + largest expense (the champion pass).
R4. Description may contain spaces (line-based!) — and the tracker runs entirely on the file (no in-memory master; load, report, exit).
Test data & expected results.
| Input (appended over 3 runs) | File grows to | Report shows |
|---|---|---|
lunch at cafe, with tip;450 |
1 line | 450 |
bus card recharge;1200 |
2 lines | total 1650.0 |
stationery, pens and pads;310.5 |
3 lines | total 1960.5, largest 1200.0 |
Reload after “crash” (re-run the report alone): all 3 present — per-record close earned its keep. Malformed test: hand-add line broken line no semicolon → report prints skipped: broken line no semicolon, total unchanged.
Student tasks.
- Contract first; then
addExpensewith the close-per-record decision written down (why per-record here and not in Lab 1’s save? — because this file is the only copy of history; Lab 1’s roster lives in memory too). - The split +
stodreader with the malformed-line policy. - Reflection: this format is append-only — no update, no delete. What operations does that trade away, and why is it still the right shape for a ledger? (History is append-only by nature; C3’s rewrite is the tool when editing is truly needed.)
Solution (core).
void addExpense(const char* filename, const std::string& desc, double amount) {
std::ofstream out(filename, std::ios::app);
if (!out.is_open()) { std::cout << "cannot open ledger\n"; return; }
out << desc << ';' << amount << '\n';
out.close(); // durability: confirmed = on disk
}
double loadExpenses(Expense items[], int cap, const char* filename, int& countOut) {
std::ifstream in(filename);
if (!in.is_open()) { countOut = 0; return 0.0; } // missing = empty ledger, by contract
std::string line;
double total = 0.0;
countOut = 0;
while (countOut < cap && std::getline(in, line)) {
std::size_t p = line.find(';');
if (p == std::string::npos) { std::cout << "skipped: " << line << '\n'; continue; }
items[countOut].description = line.substr(0, p);
items[countOut].amount = std::stod(line.substr(p + 1));
total += items[countOut].amount;
countOut += 1;
}
return total;
}
Explanation. Two format lessons live here: the separator choice (';' — a character the data can’t produce; the test data’s comma-bearing descriptions prove it) and the malformed-line policy (report-and-skip — a ledger tolerates one bad line better than it tolerates refusing to open). The champion pass and running total ride the load loop — one traversal, three outputs.
⭐ Extensions. ⭐ Month filter: report only entries whose description contains a given substring. ⭐⭐⭐ The C3 rewrite: add removeExpense(index) — load, compact, rewrite — with the backup-first order from C9.
Lab 3 — Inventory File
Scenario. The campus store’s stock room, persisted: products with quantities and reorder levels, updated across runs — the Records module’s Lab 3 with a file backbone.
Format contract.
// inventory.txt — count-first; per record (3 lines):
// <n>
// <name> (line-based: may contain spaces)
// <qty> <reorderAt> (formatted: two ints, space-separated)
Requirements.
R1. Load with all guards; save with the count-first header; the enum-derived state (OK/LOW/OUT) stays derived — never stored in the file (it’s computable from qty/reorderAt; storing it would be a D9 drift waiting to happen).
R2. Menu: 1-load · 2-list (with state text) · 3-receive (by index, qty += n) · 4-sell (validate-then-mutate) · 5-save · 6-reorder report (LOW and OUT) · 7-quit (auto-save).
R3. The reorder report writes reorder.txt — a second file, one product per line (name;qty;reorderAt), plus a console summary.
R4. Selling uses the Lab-3-of-Records gate: refuse oversell without mutating.
Test data & expected results.
| Start file | Action | Expected |
|---|---|---|
2\nNotebook\n10 4\nBall Pen\n50 20\n |
load + list | Notebook 10 OK, Ball Pen 50 OK |
| sell 7 Notebooks | list | Notebook 3 LOW |
| sell 3 Notebooks | list | Notebook 0 OUT |
| sell 1 Notebook | refused — out of stock |
qty stays 0 |
| receive 20 Notebooks | list | 20 OK |
| reorder report | reorder.txt written |
Notebook;20;4 — wait: state is OK now; report shows it only if LOW/OUT. After selling 1 Ball Pen ×45: Ball Pen;5;20 LOW |
| quit (auto-save) | file | 2\nNotebook\n20 4\nBall Pen\n5 20\n |
Student tasks.
- Contract first — and the design memo sentence: why
stateis absent from the file (derived data; the one-updater discipline in memory). - The mixed-strategy record read:
>>the two ints, ignore, getline the name — the seam order between records (trace where each newline lands). - Reflection: two files in one program (inventory + reorder report) — what differs in their open modes and why? (One truncates-by-design — a report is regenerated; one is the master store, saved wholesale.)
Solution (core — the mixed-strategy read).
int loadInventory(Product items[], int cap, const char* filename) {
std::ifstream in(filename);
if (!in.is_open()) return 0;
int n = 0;
in >> n; in.ignore(1000, '\n');
if (n > cap) n = cap;
for (int i = 0; i < n; i = i + 1) {
std::getline(in, items[i].name); // line-based field first
in >> items[i].qty >> items[i].reorderAt; // then the formatted pair
in.ignore(1000, '\n'); // seam: the newline after reorderAt
}
return n;
}
Explanation. The new skill is the mixed record: line-based where spaces exist, formatted where they don’t — in one record. Trace the seam: getline consumes through the name’s newline; the >> pair reads across the next newline (whitespace-transparent); the ignore then eats that pair’s trailing newline so the next getline starts clean. Getting this rhythm right is the lab’s whole difficulty — and the reason the test table starts from a hand-written file (you read what you can write by hand).
⭐ Extensions. ⭐ Price per product (a third field — amend writer, reader, and the contract comment in the same edit). ⭐⭐ Transaction count per product (how many sold all-time) — appended as a fourth field, loaded into the record’s new member.
Lab 4 — Marks Report
Scenario. The tutor’s gradebook: read a class’s marks from a file, produce a report file — files on both ends, none on the console except a summary. The lab where formatted reading carries the load.
Format contract (input).
// marks.txt — formatted, one student per line:
// <roll> <score>
Format contract (output).
// report.txt — generated; header + per student + summary:
// ROLL NAME-IS-ABSENT (this format has no names — see extension)
// <roll> <score> <grade-letter>
// ...
// average <avg> high <h> low <l> pass <p>/<n>
Requirements.
R1. Read all records until EOF (formatted loop — while (in >> roll >> score)), capacity-clamped; validate each score 0–100 at load — invalid records reported and skipped.
R2. Compute per-record grade letters (Records Lab 1’s bands, one source of truth) and the four statistics.
R3. Write the report file; console prints only “report written: 12 records, average 71.3”.
R4. The report is regenerated every run (truncate by design) — the marks file is never modified.
Test data & expected results.
Input marks.txt:
101 82
102 49
103 74
104 91
105 63
106 55
107 100
108 38
Expected report.txt (grades: 82→B, 49→F, 74→C, 91→A, 63→D, 55→F? — 55 ≥ 50 → D; 100→A, 38→F):
| roll | score | grade |
|---|---|---|
| 101 | 82 | B |
| 102 | 49 | F |
| 103 | 74 | C |
| 104 | 91 | A |
| 105 | 63 | D |
| 106 | 55 | D |
| 107 | 100 | A |
| 108 | 38 | F |
Statistics: high 100, low 38, average 552/8 = 69.0, pass (≥50) 6/8.
Malformed test: append line 109 abc → load reports skipped record: roll 109 (bad score), statistics unchanged (still 8 records).
Student tasks.
- Both contracts as comments; the read loop with in-loop validation (the skip policy from Lab 2).
- Statistics in one pass; the grade bridge reused, not reinvented.
- Reflection: two files, two roles — input (read-only contract, never written) vs output (regenerated, truncate-by-design). Write the two one-line contracts side by side and note how the modes express them.
Solution (core).
int n = 0;
while (n < CAP && in >> roll >> score) {
if (score < 0 || score > 100) { std::cout << "skipped: " << roll << '\n'; continue; }
roster[n].roll = roll; roster[n].score = score; n += 1;
}
int total = 0, high = -1, low = 101, pass = 0;
for (int i = 0; i < n; i = i + 1) {
total += roster[i].score;
if (roster[i].score > high) high = roster[i].score;
if (roster[i].score < low) low = roster[i].score;
if (roster[i].score >= 50) pass += 1;
out << roster[i].roll << ' ' << roster[i].score << ' '
<< gradeText(letterOf(roster[i].score)) << '\n';
}
out << "average " << (n ? 1.0 * total / n : 0.0) << " high " << high
<< " low " << low << " pass " << pass << "/" << n << '\n';
Explanation. Formatted reading shines here: while (in >> roll >> score) reads every line with zero ceremony because no field has spaces — the format was designed for the reader. The validation-at-the-boundary (skip abc) is the stream-state lesson applied: after a failed >>, the loop condition ends it — so detect the bad record by reading the roll, then checking the score read (try if (!(in >> score)) { report; break; } as the sharper version). Average check: 82+49+74+91+63+55+100+38 = 552; 552/8 = 69.0 ✓.
⭐ Extensions. ⭐ Name column (amend the input format to roll;name;score — semicolon CSV, the splitter returns). ⭐⭐ A grade-histogram file section (count per letter — the enum tally).
Lab 5 — Contact List
Scenario. A personal address book: names and phone numbers, searched and appended — line-based reading with a lookup purpose. The lab where you feel why the format is lines.
Format contract.
// contacts.txt — one contact per line:
// <full name>;<phone>
// ';' separator: names contain spaces and commas; phones contain only digits/+
Requirements.
R1. Load all contacts (clamped) into a record array (Contact { std::string name; std::string phone; } — both fields are strings; the phone is text, not a number — state why in the contract: leading zeros and +).
R2. Menu: 1-add (append) · 2-list · 3-search by name (case-insensitive substring, all matches) · 4-find exact (first match only) · 5-quit (auto-save as a rewrite — sorted by name).
R3. Search uses the Unit 11 normalize-then-search: lowercase copies on both sides.
R4. Quit’s rewrite is sorted — the selection sort over records by name — and prints how many were written.
Test data & expected results.
Start file:
Ayesha Khan;+92 300 1234567
Ali Raza;0321-9876543
Sana Mir;+92 333 5551212
Umar Farooq;0300-1112223
| Action | Expected |
|---|---|
search an |
Ayesha Khan; Sana Mir? — no: “Sana” contains an? s-a-n-a → yes at index 1. Matches: Ayesha Khan, Sana Mir (2) |
search ALI (uppercase) |
Ali Raza (case-insensitive) |
find exact Ali Raza |
1 match, 0321-9876543 |
find exact ali raza |
0 matches — exact mode is case-sensitive by design (documented heuristic from Strings Lab 5) |
add Zainab Ahmed;0333-7778888, quit |
rewrite sorted: Ali Raza, Ayesha Khan, Sana Mir, Umar Farooq, Zainab Ahmed |
Student tasks.
- Contract first — including the phone-as-text sentence.
- The two search modes sharing one traversal (flag for case sensitivity), reporting line numbers.
- Reflection: this program rewrites on quit (sorted) — unlike Lab 2’s append-only ledger. Same data, opposite file strategies: what property of the data decides (mutability — contacts change; history doesn’t)?
Solution (core).
int searchContacts(const Contact list[], int n, const std::string& needle,
bool exact, int hits[], int maxHits) {
std::string needleLower = toLower(needle);
int found = 0;
for (int i = 0; i < n && found < maxHits; i = i + 1) {
if (exact) { if (list[i].name == needle) hits[found++] = i; }
else {
std::string hay = toLower(list[i].name);
if (hay.find(needleLower) != std::string::npos) hits[found++] = i;
}
}
return found;
}
Explanation. Everything here is a rerun of earlier modules wearing a file: the splitter (Lab 2), the normalize-then-compare search (Strings D2), the record sort (C2 of records) — composed around one contract. The search test table’s trick row is the uppercase ALI — it proves the normalization; and the ali raza exact-mode row proves the documented heuristic’s asymmetry. Phone-as-text: 0321-9876543 as an int is 3219876543 (leading zero gone) — the contract sentence exists because the data forced it.
⭐ Extensions. ⭐ Email field (three fields per line). ⭐⭐⭐ Dedup on rewrite: contacts with identical names AND phones collapse to one — report how many were merged (C6’s duplicate discipline).
Lab 6 — Simple Transaction Log
Scenario. An audit trail for any of the previous labs: every notable event appended, timestamped, never edited. The lab where append mode + durability are the entire design, and the log becomes evidence.
Format contract.
// audit.log — append-only, never rewritten, never sorted:
// <sequence-number>;<event>;<detail>
// sequence number: 1, 2, 3... — assigned by the program at write time
// (the log is evidence: no rewrite path exists in this program at all)
Requirements.
R1. logEvent(event, detail) — append, check, write, close per event; the sequence number = count of existing lines + 1 (read the log’s line count first — or maintain a counter file? Decide, document).
R2. readLog() — prints all entries, numbered, plus a count; malformed lines reported (evidence is never silently skipped — print them marked [malformed]).
R3. findEvents(event) — all entries of one event type (e.g. every DISCHARGE).
R4. The program offers no edit/delete/rewrite operations — write the design-memo sentence explaining why (an audit log that can be edited proves nothing).
Test data & expected results.
| Sequence of calls | audit.log after |
|---|---|
| logEvent(“ADMIT”, “roll 101 Ayesha”) | 1;ADMIT;roll 101 Ayesha |
| logEvent(“MARKS”, “roll 101 quiz1 8”) | + 2;MARKS;roll 101 quiz1 8 |
| program restarted, logEvent(“ADMIT”, “roll 102 Ali”) | + 3;ADMIT;roll 102 Ali — sequence survived the restart |
| findEvents(“ADMIT”) | lines 1 and 3 |
Malformed test: hand-insert garbage mid-file → readLog prints 4:[malformed] garbage and continues numbering honestly; findEvents counts only well-formed matches.
Student tasks.
- The sequence-number decision: count-lines-first (recount on every write — simple, robust, O(n) per event) vs a counter file (O(1) but a second file to keep consistent). Pick one and write the sentence.
- Per-event open/close — and the reflection: measure the trade (five logEvents = five opens) against the durability guarantee. When would you batch instead?
- Reflection: this file is the one format in the course with no rewrite, no sort, no dedup. What do the other labs’ files assume that this one refuses? (Mutability. An audit log’s value is its immutability.)
Solution (core).
void logEvent(const char* filename, const std::string& event, const std::string& detail) {
std::ifstream in(filename); // recount: robust across restarts
int seq = 1;
if (in.is_open()) {
std::string line;
while (std::getline(in, line)) seq += 1;
in.close();
}
std::ofstream out(filename, std::ios::app);
if (!out.is_open()) { std::cout << "log unavailable\n"; return; }
out << seq << ';' << event << ';' << detail << '\n';
out.close(); // durability per event
}
Explanation. The recount strategy (chosen above) survives crashes, hand-edits, and restarts because it never trusts memory — the file is the truth. The counter-file alternative is faster but creates two files whose agreement is another contract to maintain (D9’s drift, invited). Per-event close is the D10 fix made policy; the malformed-line policy (marked, never skipped) is evidence discipline. This lab is small — five lines of writing — but it’s the first file whose design philosophy (immutable, append-only, self-numbering) does the work.
⭐ Extensions. ⭐ Datestamps: prepend yyyy-mm-dd from the user (a Date record’s text form). ⭐⭐⭐ Log rotation: when the log exceeds 100 lines, rename it audit-1.log and start fresh (C9’s backup order — copy, then continue).
Lab index
| Lab | File role | The pattern it drills |
|---|---|---|
| 1 | Student record file | count-first round trip; the contract as artifact |
| 2 | Expense tracker | append-only + separator choice + malformed-line policy |
| 3 | Inventory file | mixed-strategy records; derived state kept out of the file |
| 4 | Marks report | formatted reading at scale; input vs output file contracts |
| 5 | Contact list | line-based search; rewrite-on-mutability |
| 6 | Transaction log | immutability as design; per-event durability |
After the labs: The File-Based Student Management System — the capstone that makes one format contract carry a whole program.