Files Debugging Exercises (10)
← Module home · Work each in the debugging protocol: reproduce → form hypotheses → instrument → fix → reflect. Files add one instrument: inspect the file in an editor between steps — the file’s bytes are the ground truth your program is lying about.
Format. Each program compiles but misbehaves. Hint ladders are collapsible — one rung at a time. Fix-list summary at the end.
D1 — The report that’s always empty (no open check)
int main() {
std::ifstream in("roster.txt"); // the file does NOT exist
int n; in >> n;
std::cout << "loaded " << n << " students\n";
}
// Prints: loaded 0 students — every single time, on every machine. No error. Ever.
The user believes the roster is empty. It is worse: it was never opened.
Hint 1 — what did the failed open do to the stream, and what do failed reads return?
The open set failbit; every subsequent >> is a no-op and leaves n uninitialised (garbage, or 0 by luck). Nothing ever announces the problem.
Hint 2 — the fix
if (!in.is_open()) { std::cout << "roster.txt not found\n"; return 1; }
Gallery M1 — silence is the enemy; the check converts it to a message (Lesson 3 §1).
Reflection. “It printed 0” and “it printed my data” are the only two visible states; the file bug lives in the gap. Instrument the gap — always.
D2 — Every name is blank (missing ignore)
// roster.txt: 2\nAyesha Khan\n92\nAli Raza\n78\n
std::ifstream in("roster.txt");
int n; in >> n; in.ignore(1000, '\n'); // ignore #1 present...
Student roster[10];
for (int i = 0; i < n; i = i + 1) {
std::getline(in, roster[i].name);
in >> roster[i].score; // ...but the loop's seam is bare
}
// names print: "Ayesha Khan" then "" — and record 2 is entirely wrong
Trace it: record 1 loads perfectly, record 2’s name is empty and its score is… find it.
Hint 1 — what is left in the stream after in >> roster[0].score?
The newline after 92. The next getline (record 2’s name) consumes it → "". Then in >> roster[1].score attempts to read Ali as an int → fails; the stream is dead; record 2 gets a stale score. (One missing ignore killed record 2 and the loop.)
Hint 2 — the rule
in.ignore(1000, '\n'); after the score, inside the loop. Every >>-before-getline seam gets one — count the seams, count the ignores (gallery M4).
Reflection. The mixing trap is not a one-time lesson — it recurs at every seam. Files have more seams than the keyboard; count them.
D3 — The disappearing ledger (missing append)
void recordExpense(double amount) {
std::ofstream out("expenses.txt"); // intent: keep a running ledger
out << "2026-09-23 lunch " << amount << '\n';
out.close();
}
// called daily. At day's end, expenses.txt has ONE line — today's.
Hint 1 — what does the daily open do to yesterday's entries?
The plain ofstream open truncates — each day erases the ledger. The intent was append; the code says replace (gallery M3).
Hint 2 — the fix
std::ofstream out("expenses.txt", std::ios::app); — and re-run the test that proves it: two calls, two lines.
Reflection. The open mode is a sentence about intent: “replace” or “append”. Say the sentence, then write the flag.
D4 — The truncated names (» on a field with spaces)
// students.txt: Ayesha Khan 92\nAli Raza 78\n
std::ifstream in("students.txt");
std::string name; int score;
while (in >> name >> score)
std::cout << name << " -> " << score << '\n';
// output: Ayesha -> 92 / Khan -> ??? — trace it. (It gets weird.)
Output: Ayesha -> 92, then Khan -> 78 (the stray surname becomes a name, the second score mis-pairs), then Raza -> fails silently. Half the data, misaligned.
Hint 1 — where does in >> name stop?
At the first whitespace — "Ayesha". Khan then becomes the next name-read… and the format is now misaligned by one field forever.
Hint 2 — the format decision
Names contain spaces → the format must be line-based: getline for the name, then >> score, with the ignore rhythm — or CSV with the splitter. The bug was choosing >> for a spaces-allowed field (Lesson 2 §2).
Reflection. The reader doesn’t fix the format — the format decides the reader. Design the format for the worst legal value, then pick the strategy.
D5 — The phantom record (eof loop)
// marks.txt: 80\n90\n
int m;
std::ifstream in("marks.txt");
while (!in.eof()) {
in >> m;
std::cout << "processed " << m << '\n';
}
// output: 80, 90, 90 — the last one processed TWICE
Hint 1 — when does eofbit actually set?
Only when a read attempts past the end. After reading 90, no attempt has gone past — the flag is false, the body runs once more, the read fails, and the stale m (90) prints (Lesson 3 §2).
Hint 2 — the fix
while (in >> m) — the read’s own result is the condition; no stale value is ever processed.
Reflection. eof() answers “did the previous attempt go too far?”, never “will the next read succeed?”. Loop on results, not predictions.
D6 — The count that lied (unclamped load)
// roster.txt line 1 (corrupted by an editor crash): 99999
int loadRoster(Student roster[], int cap, std::ifstream& in) {
int n; in >> n; in.ignore(1000, '\n');
for (int i = 0; i < n; i = i + 1) // n = 99999
std::getline(in, roster[i].name); // ...and roster[100..] ???
return n;
}
Called with cap = 100. Runs “fine” on small files — and on the corrupted file, writes far past the array.
Hint 1 — which two guarantees does the loop condition need?
Data present (the stream stays healthy) and space present (i < cap). The count from the file is a claim, not a fact.
Hint 2 — the fix
if (n > cap) n = cap; before the loop — the clamp (gallery M6). Trust data only up to your guard.
Reflection. The capacity clamp is the file-reading cousin of the loop-bounds rule: arrays end where they end, whatever the data claims.
D7 — The broken writer (no separators)
void save(const Student& s, std::ofstream& out) {
out << s.name << s.score; // intended: name on one line, score on the next
}
// roster.txt after save: Ayesha Khan92Ali Raza78
// loadRoster then reads ONE record: name "Ayesha Khan92Ali Raza78"?? — trace the mess.
The file is one 24-character line; the loader (line-based, count-first) mis-parses everything downstream.
Hint 1 — what makes the loader see two records where the writer wrote none?
The loader splits on newlines; the writer wrote none. Separators are the format — << writes values flush against each other (gallery M8).
Hint 2 — the fix
out << s.name << '\n' << s.score << '\n'; — every field ends with its separator, visibly. Then round-trip test: save, load, compare.
Reflection. A format lives in its separators. A writer without them writes soup — and soup is loadable as anything, which is the bug.
D8 — The ignored failure (writing to a bad path)
std::ofstream out("archive/2026/roster.txt"); // archive/ doesn't exist
out << "data";
std::cout << "saved\n";
// prints "saved". roster.txt appears nowhere. No error anywhere.
Hint 1 — ofstream creates files. What does it NOT create?
Directories. The open failed (bad path) — and without the check, the writes went nowhere while the program claimed success (gallery M5’s path family).
Hint 2 — the fix
The open check — if (!out.is_open()) — plus the working-directory sanity check from Lesson 3. Yes, ofstream needs the check too; “it creates the file” is not “it succeeds”.
Reflection. Every open can fail — reading and writing. The four-word discipline has no exceptions, only frequencies.
D9 — The contract drift (writer changed, reader didn’t)
// VERSION 1 format: <name>\n<score>\n
// VERSION 2 writer (updated last week):
out << s.name << '\n' << s.score << '\n' << s.programme << '\n'; // new field added
// VERSION 1 loader (never touched):
for (int i = 0; i < n; i = i + 1) {
std::getline(in, roster[i].name);
in >> roster[i].score;
in.ignore(1000, '\n');
}
// loads 10 records from a 10-record file... until record 2's score meets "BSCS".
Records misalign from the first extra field; scores become garbage; names shift.
Hint 1 — why does the loader mis-parse from the first record, and why is it silent?
Streams are position-blind: after the score, ignore skips to the next newline — which is now the programme line — so the next name read is record 2’s… wait, trace carefully: the loader reads name, score, skips programme; next iteration reads record 2’s name as a name — but record 1’s programme was eaten as a skip. The seam count no longer matches the field count, so every subsequent field is off by one line. Silent, because every read still “succeeds”.
Hint 2 — the fix, and the discipline
Update both ends in one edit, and keep the format contract as a comment beside both functions (gallery M10):
// FORMAT v2: <name>\n<score>\n<programme>\n (BOTH save() and load() follow v2)
Optionally a version header line in the file itself — the extension asks for it.
Reflection. A file format is a contract between two programs written at different times — often by different yous. Contracts change by amendment, not telepathy.
D10 — The log that lies (no check, wrong mode, no flush)
void audit(const std::string& event) {
std::ofstream out("audit.log"); // (a)
out << event << '\n'; // (b) no open check; (c) no close/flush
}
// used in a program that sometimes crashes mid-run. audit.log is empty after crashes
// — and, separately, holds only the LAST event after normal runs. Two bugs, one function.
Hint 1 — which gallery entries are (a) and (b)?
(a) is M3 — every call truncates; only the final call’s line survives a normal run. (b) is M1 — if the open fails (permissions after a chmod, say), events vanish silently.
Hint 2 — and the crash-emptiness? (c)
M9 — the buffered event dies with the crash before the (missing) close flushes it. For per-event durability: open in append, check, write, close — inside the function. Costly per call; correct per event.
Reflection. One five-line function held three gallery bugs. File code is short — its bugs are dense. The checklist exists because density is real.
Fix-list summary
| D | Gallery / lesson | Bug (one line) | Fix (one line) |
|---|---|---|---|
| D1 | M1 | no open check on read | if (!in.is_open()) + message |
| D2 | M4 | missing ignore after the score | in.ignore(1000, '\n') at every seam |
| D3 | M3 | daily open truncates the ledger | std::ios::app |
| D4 | strategy rule | >> on a spaces-allowed field |
line-based (or CSV) format for names |
| D5 | M2 | while (!in.eof()) phantom |
while (in >> m) |
| D6 | M6 | file’s count trusted past capacity | if (n > cap) n = cap; |
| D7 | M8 | writes without separators | every field ends with its separator |
| D8 | M5 | write to a bad path, unchecked | open check + verify working directory |
| D9 | M10 | writer gained a field, reader didn’t | amend both ends together; comment the contract |
| D10 | M1+M3+M9 | audit log unchecked, truncating, unflushed | append + check + close per event |