Files Challenges (10)

← Module home · Attempt 30 minutes before reading any solution — and write the format contract first (as a comment): these challenges are won in the format design. Solutions separated at the end; each gives the approach plus key code. ★ = Lesson 1 · ★★ = adds Lesson 2 · ★★★ = combines everything.


C1 — The word-frequency counter (★★)

Read a text file of whitespace-separated words; count how many times each of the user-sought words appears. Interface: the program reads a target word, then counts occurrences in article.txt (case-insensitive). Report count + total word count. Test: an article with 40 words, target "the" appearing 6 times (verify by hand first!).

C2 — The count-free loader (★★)

Rebuild loadRoster without the count-first header — read until EOF instead. Format: name\nscore\n repeating. Where does the loop end now (which condition stops it?), and what happens to the capacity guard’s meaning (clamp to cap, and what does the return value report)? Then state the trade: count-first vs read-until-EOF — which detects a truncated file, and which avoids maintaining the count?

C3 — The safe rewrite (★★★)

Task: remove all students with score < 50 from roster.txt permanently. You cannot delete lines in place with course tools — so: load all records, filter in memory, then rewrite the file from scratch (fresh ofstream, by design — the one place truncation is a feature). Contract question to answer in writing: what is the risk window (crash between open and write), and why is the course answer “acceptable for coursework, dangerous for production” (name the real-world fix: write-to-temp-then-rename)?

C4 — The CSV date column (★★★)

Extend the CSV student format with an enrolment date — but the date contains commas? No — it contains dashes: name,score,programme,2026-09-01. Extend writer and reader; the reader validates the date fields with the records-module isValid. Then the design question: why did the date need a component format (dashes) while the course forbids commas — what property must a separator have (echo the sentinel rule)?

C5 — The merge of two files (★★★)

Two sorted score files (each line: name;score, descending by score): merge into a third file, preserving order, without loading everything into one array — stream both inputs simultaneously (two ifstreams, compare current heads, write smaller, advance — the two-pointer merge with files). Handle the tail drains. Both opens get checks; the output gets the truncate contract comment.

C6 — The duplicate detector (★★)

Given emails.txt (one address per line), report duplicates. Capacity-honest version: read into an array (clamped), O(n²) scan — the records-module C6 approach. Report each duplicate once with its first-seen line number. What’s the report for a 5000-line file with a 1000-line array? (State the policy: report duplicates among the loaded subset, and say so in the output — honest reporting beats silent truncation.)

C7 — The quoted-CSV field (★★★)

The real-world CSV wart, solved: a field like "Khan, Ali" (quoted because it contains a comma) must split as one field. Upgrade the splitter: if a field starts with ", find the closing quote and treat the comma inside as data. Test: name,score where name = "Khan, Ali", score = 92. Then the honest note: full CSV quoting (embedded quotes, newlines-in-fields) is a rabbit hole — state exactly which cases your parser handles and which it refuses.

C8 — The config file (★★)

Parse a settings file of key=value lines (# starts a comment; blank lines ignored):

# roster settings
capacity=100
course=BSCS
pass_mark=50

Read it into three variables with defaults (capacity 50, course “BSIT”, pass_mark 40) if a key is missing. Design decisions to write down: trim whitespace or not (state it), unknown keys (ignore with a warning), duplicate keys (last wins). This is >>-formatted and line-based reading composed — getline then split on '='.

C9 — The backup rotation (★★★)

Before each rewrite (C3’s pipeline), create roster.txt.bak — a copy of the current file. Implement bool backupFile(const char* src, const char* dst) (open both, check both, byte-copy by lines, close both, return success). Then the rotation: keep .bak only if the rewrite fully succeeded — and write the failure policy: if the backup fails, refuse the rewrite (data protection has an order: copy first, destroy second).

C10 — The file-format designer (★★★)

A clinic needs to persist patients: id, full name, age, ward (one of four strings), critical flag, admission date. Design the file format — every choice justified in one sentence each: text vs binary (why text), line-based vs >> (which fields force which), separator choices (echo C4’s property), header (count-first? version line? none?), missing-file contract, and the capacity clamp. Then write both functions with the contract comments, and the round-trip test table (5 rows: 1 record, 3 records, 0 records, missing file, truncated file — expected result each).


Solutions (approaches + key code)

C1 — Word-frequency counter
std::string word, target;
std::cin >> target;
for (int i = 0; i < target.length(); i = i + 1) target[i] = tolower(target[i]);

std::ifstream in("article.txt");
if (!in.is_open()) { std::cout << "open failed\n"; return 1; }
int count = 0, total = 0;
while (in >> word) {                       // >> = whitespace-delimited words
    total += 1;
    for (int i = 0; i < word.length(); i = i + 1) word[i] = tolower(word[i]);
    if (word == target) count += 1;
}
std::cout << count << " of " << total << '\n';

>> is exactly right — words are whitespace-delimited by definition. Normalize both sides to lowercase (the strings-module comparison rule). Hand-verify the 6 before trusting the machine — the counter is only as good as the definition of “word” (is "the," the word the? — with punctuation attached it isn’t; document your policy or strip punctuation with cctype).

C2 — Count-free loader
int loadRoster(Student roster[], int cap, const char* filename) {
    std::ifstream in(filename);
    if (!in.is_open()) return 0;
    int n = 0;
    while (n < cap && std::getline(in, roster[n].name)) {   // name line: EOF stops here
        in >> roster[n].score;
        in.ignore(1000, '\n');                              // seam before the next getline
        n += 1;
    }
    return n;    // n == cap means "may be more on disk" — the caller decides
}

The loop ends when the name getline fails — EOF detected on the field that always exists. The clamp moves into the condition (n < cap): loading stops at capacity, and the return value’s meaning changes — it’s now “records loaded (possibly capped)”, so a full-capacity return is ambiguous (exactly full vs more left). Count-first detects truncation instantly (a short file fails mid-load); count-free never needs the count maintained — the honest trade is validation vs maintenance, and this challenge is where you feel it.

C3 — The safe rewrite
// 1. load (clamped), 2. filter in memory, 3. rewrite from scratch
int keep = 0;
for (int i = 0; i < n; i = i + 1)
    if (roster[i].score >= 50) roster[keep++] = roster[i];   // in-memory compaction

std::ofstream out("roster.txt");            // truncate — deliberate, this once
if (!out.is_open()) { std::cout << "rewrite failed\n"; return 1; }
out << keep << '\n';
for (int i = 0; i < keep; i = i + 1)
    out << roster[i].name << '\n' << roster[i].score << '\n';
out.close();

The risk window: between the truncating open and the last buffered write, a crash leaves the file empty or partial — the old data is already gone. Acceptable here because a lost roster is re-enterable; production’s fix: write the new data to roster.txt.tmp, then rename over the original (atomic on real filesystems) — the C9 backup is the coursework-scale cousin of the same instinct: never destroy the only copy until the replacement exists.

C4 — The CSV date column
// FORMAT: name,score,programme,yyyy-mm-dd
out << s.name << ',' << s.score << ',' << s.programme << ','
    << s.enrolled.y << '-' << s.enrolled.m << '-' << s.enrolled.d << '\n';
// reading: split into 4 fields as before; field 4 splits on '-':
Date d;
// stoi on the three dash-separated pieces; validate with isValid(d) — reject the line otherwise

The separator property: a separator must be a character the data cannot produce. Dates contain digits and dashes — never commas — so commas stay the field separator while dashes structure within the date field. Same reasoning as the sentinel rule (a sentinel must be unreachable as real data): the format’s structure lives in characters the data promises not to use, and the promise is documentation.

C5 — Merge of two files
std::ifstream a("hall1.txt"), b("hall2.txt");
if (!a.is_open() || !b.is_open()) { std::cout << "open failed\n"; return 1; }
std::ofstream out("merged.txt", std::ios::trunc);   // truncate: fresh output, documented
if (!out.is_open()) { std::cout << "open failed\n"; return 1; }

std::string na, nb;  int sa, sb;
bool ha = static_cast<bool>(a >> sa), hb = static_cast<bool>(b >> sb);
// (load the name lines with the ignore rhythm too — elided for shape)
while (ha && hb) {
    if (sa >= sb) { out << na << ';' << sa << '\n'; ha = static_cast<bool>(a >> sa); /* + name */ }
    else          { out << nb << ';' << sb << '\n'; hb = static_cast<bool>(b >> sb); }
}
while (ha) { out << na << ';' << sa << '\n'; ha = static_cast<bool>(a >> sa); }
while (hb) { out << nb << ';' << sb << '\n'; hb = static_cast<bool>(b >> sb); }

The two-pointer merge where the pointers are stream positions: compare current heads, write the smaller, advance that input. The tail drains handle the file that outlasts the other. Memory: O(1) — two records’ worth — which is the entire point of streaming (the array merge needed everything resident). Ties pull from a (documented stability).

C6 — Duplicate detector
std::string seen[1000];
int n = 0;
while (n < 1000 && in >> seen[n]) n += 1;      // clamped load

bool reported[1000] = {false};                  // report each duplicate once
for (int i = 0; i < n; i = i + 1) {
    if (reported[i]) continue;
    for (int j = i + 1; j < n; j = j + 1)
        if (seen[j] == seen[i]) {
            std::cout << seen[i] << " first seen at line " << i + 1 << '\n';
            reported[i] = true;
            break;
        }
}
// policy line, printed when n hit the cap:
if (n == 1000) std::cout << "(checked first 1000 lines only)\n";

O(n²) — fine at course scale, honest about its ceiling. The reported array is the “report once” state machine; line numbers are indices + 1 (humans count from 1). The policy print is the deliverable: truncated checking is fine, silent truncated checking is a lie (gallery M6’s principle, transplanted to output).

C7 — Quoted-CSV field
// splits line into fields, honouring a leading quote per field
int splitQuoted(const std::string& line, std::string out[], int maxOut) {
    int count = 0;
    std::size_t i = 0;
    while (i <= line.length() && count < maxOut) {
        std::string field;
        if (i < line.length() && line[i] == '"') {          // quoted field
            std::size_t close = line.find('"', i + 1);
            if (close == std::string::npos) { /* refuse: unterminated */ break; }
            field = line.substr(i + 1, close - i - 1);       // comma inside = data
            i = close + 1;
            if (i < line.length() && line[i] == ',') i += 1; // consume the following comma
        } else {                                             // bare field
            std::size_t p = line.find(',', i);
            field = (p == std::string::npos) ? line.substr(i) : line.substr(i, p - i);
            i = (p == std::string::npos) ? line.length() + 1 : p + 1;
        }
        out[count++] = field;
    }
    return count;
}

Handles: "Khan, Ali",92 → 2 fields ✓; bare fields unchanged. Refuses: unterminated quotes. Doesn’t handle (documented): escaped quotes inside quotes (""), newlines inside fields — real CSV’s full spec is bigger than one splitter, and saying so is the deliverable. Test table: 4 rows minimum, including a quoted field as the last field.

C8 — Config file
int capacity = 50;  std::string course = "BSIT";  int passMark = 40;   // defaults
std::string line;
while (std::getline(in, line)) {
    if (line.empty() || line[0] == '#') continue;             // skip blanks/comments
    std::size_t eq = line.find('=');
    if (eq == std::string::npos) continue;                    // malformed: skip (or warn)
    std::string key = line.substr(0, eq);
    std::string val = line.substr(eq + 1);
    if      (key == "capacity")  capacity = std::stoi(val);
    else if (key == "course")    course   = val;
    else if (key == "pass_mark") passMark = std::stoi(val);
    else std::cout << "warning: unknown key " << key << '\n';
}

Documented decisions: no trimming (values are used verbatim — the file is hand-edited to that standard), unknown keys warn and continue (forward compatibility), duplicate keys: last wins (each match overwrites — a property of the linear scan, stated in the contract). Defaults make the config optional — a missing file loads as pure defaults, the same missing-file contract as the roster loader.

C9 — Backup rotation
bool backupFile(const char* src, const char* dst) {
    std::ifstream in(src);
    if (!in.is_open()) return false;              // nothing to back up = failure? or ok? — decide, document
    std::ofstream out(dst);                       // truncate: the .bak is replaced wholesale
    if (!out.is_open()) { return false; }
    std::string line;
    while (std::getline(in, line)) out << line << '\n';
    return true;                                  // (a flush-checking version would test out.good())
}
// rewrite pipeline:
// 1. if (!backupFile("roster.txt", "roster.txt.bak")) { refuse the rewrite; }
// 2. rewrite roster.txt from the filtered records

The order is the whole lesson: copy first, destroy second. If the backup fails, the rewrite must not run — the current file is the only good copy, and the pipeline’s job is to never reach a state with zero copies. (Failure-policy choice documented above: a missing source is a failure here, because the caller believes data exists. The honest alternative — missing source = nothing to protect, proceed — is defensible; pick one and write it down.)

C10 — The file-format designer

The format contract:

# patients.txt — v1
# line 1: <count>
# then per patient (3 lines):
#   <id> <age> <critical 0|1> <WARD>     (formatted — no spaces in these fields)
#   <yyyy-mm-dd>                          (dash-structured date, validated on load)
#   <full name>                           (line-based — may contain spaces)

Justifications, one sentence each: text over binary — inspectable in editors, matches every tool this course built; mixed strategy — the numeric/enum fields are >>-perfect, but the name’s spaces force line-based for that field, so the record is a composed read (>> the scalars, ignore, getline the name, ignore, getline the date, validate); separators — space between scalars, dashes inside dates, newlines between line-based fields: each is a character its data cannot produce (C4’s property); count-first header + version comment — the loader validates the claim against capacity instantly (M6) and the version line is the D9 amendment mechanism; missing-file contract — empty list, by written agreement; capacity clamp — if (n > cap) n = cap; always.

// load core (save is the mirror):
int id, age, crit;  std::string ward, name, date;
in >> id >> age >> crit >> ward;   in.ignore(1000, '\n');
std::getline(in, name);
std::getline(in, date);
// + isValid on the date, ward string -> enum via a mapper, crit != 0 && crit != 1 rejected

Round-trip test table:

Case Expected
save 1 record, load identical record back; file is 4 lines
save 3, load 3 records, order preserved
save 0, load 0 records; file is 1 line (0)
load, file missing 0 records, no error — the contract
load, truncated mid-record loader stops or rejects the malformed record — clamp + validation decide; document which (validation-reject is the stronger contract, and it’s the one your isValid/mapper checks give you)

The deliverable isn’t the code — it’s that every design choice has a sentence, and the sentences agree with each other. That’s the skill Lab 6 and the mini-project are built on.