Arrays Challenges (15)
← Module home · Attempt on paper (boxes + passes sketch) before code. Solutions describe approaches.
The problems
C1 ★ — The reverser. Write void reverse(int a[], int n) that reverses in place (no second array). Then the extra-array version. When does each earn its keep?
C2 ★ — The shifter. void rotateRight(int a[], int n, int k) — shift every box right by k, wrapping (n = 5, k = 2: {1,2,3,4,5} → {4,5,1,2,3}). Watch the direction rule from D9.
C3 ★ — The pair hunter. In {8, 3, 11, 6, 1, 9}, find whether any two boxes sum to 10 — print each pair once. (Nested pass; think about which pairs you’ve already checked.)
C4 ★ — The second champion. Find the second-largest value in one pass, handling duplicates honestly ({9, 9, 5} → second-largest is 5? or 9? Decide, document, test).
C5 ★★ — The deduplicator. Remove duplicates from a sorted array in place ({1, 2, 2, 3, 3, 3} → {1, 2, 3}, n shrinks). Then the unsorted version (order must survive). What does the sorted version’s n-returning signature look like?
C6 ★★ — The merger. Merge two sorted arrays into one sorted array without re-sorting — the walk-two-pointers pass (the seed of Unit 10’s merge sort).
C7 ★★ — The histogram. Marks 0–100 arrive in an array. Print a banded histogram (0–9, 10–19, …, 90–100) as star rows. The tally idea (Lesson 2 §4) with an index formula instead of raw values.
C8 ★★ — The majority report. Find the majority value — one appearing more than n/2 times — or report none. (Tally pass, then a champion pass over the tally.)
C9 ★★ — The saddle hunter. In a matrix, find “saddle points”: boxes that are the maximum of their row and the minimum of their column. One example exists in { {4,5,6},{1,2,3},{7,8,9}} — find it by hand first.
C10 ★★★ — The multiplication prover. Implement matrix multiply (Lesson 4 §4) and prove it on paper for { {1,2},{3,4}} × { {5,6},{7,8}} before running. Then the boundary probe: what does multiplying by the identity matrix { {1,0},{0,1}} yield, and why is that a correctness check?
C11 ★★★ — The diagonal inspector. Report whether a square matrix is (a) a diagonal matrix (non-diagonal boxes all zero), (b) symmetric (a[r][c] == a[c][r] for all r, c). One traversal each — and say why asymmetric test data is mandatory for (b).
C12 ★★★ — The magic square. Verify a 3×3 magic square: all rows, all columns, and both diagonals sum to the same value. Structure the check as a function team — and count how many sums you’re comparing (9 lines total: can you collect them in one array?).
C13 ★★★ — The stable partitioner. Rearrange an array so all even values precede all odd values, preserving relative order ({3, 8, 5, 2} → {8, 2, 3, 5}), using one extra array. Then attempt it in-place and describe honestly what breaks.
C14 ★★★ — The window analyst. Given daily sales, find the k-day window (k read from input) with the highest total — the sliding-window pass: compute the first window’s sum, then slide (add the entering box, subtract the leaving one). Compare its pass-count with the brute-force nested version.
C15 ★★★ — The local-maxima cartographer. Print the positions of all local maxima — boxes strictly greater than both neighbours (ends count with one neighbour). {3, 7, 4, 9, 2} → positions 1 and 3. Edge boxes are the exercise.
Solutions (C1–C15)
C1 — The reverser
In place: swap box i with box n−1−i for i = 0 .. n/2−1 — for (i = 0; i < n/2; i++) { int t = a[i]; a[i] = a[n-1-i]; a[n-1-i] = t; }. Odd n: the middle box swaps with itself harmlessly. Extra-array: backward copy into b — clearer, costs n boxes. In-place earns its keep when memory is the constraint or mutation is the contract; the copy when the original must survive. Direction discipline: the swap version is direction-proof because it swaps pairs, it never overwrites a needed source.
C2 — The shifter
Naive: repeat k times, one right-shift each (backward loop, temp = a[n−1] saved first) — O(n·k). Better: each box’s source is a[(i - k + n) % n] — copy into a fresh array, then copy back (in-place without the fresh array kinks into index-cycle chasing, which is beyond today). Trace n=5, k=2: new[0] = a[3], new[1] = a[4], new[2] = a[0]… → {4,5,1,2,3} ✓. The % n wrap is the whole trick; test k = 0 (identity), k = n (identity), k > n (reduces to k % n).
C3 — The pair hunter
for (int i = 0; i < n; i = i + 1)
for (int j = i + 1; j < n; j = j + 1) // j starts at i+1: pairs (i, j), i < j, each once
if (a[i] + a[j] == 10) print a[i], a[j];
{8, 3, 11, 6, 1, 9} → (8, … 8+3=11 no; 8+11 no; 8+6 no… 3+… 3+11=14; 3+6=9; 3+1=4; 3+9=12; 11+6=17; 11+1=12; 11+9=20; 6+1=7; 6+9=15; 1+9=10 ✓ → pair (1, 9)). Starting j at i+1 is the “each pair once” rule — starting at 0 would double-count and self-pair.
C4 — The second champion
Decision first: with {9, 9, 5}, is the second-largest 9 (two boxes hold it) or 5 (second distinct value)? Pick the distinct reading (more useful, harder) and document. One pass, three champions: best, second (both seeded from the first two distinct values — seed carefully), challenger v: if (v > best) { second = best; best = v; } else if (v > second && v != best) second = v;. Test: {9, 9, 5} → 5; {5, 9, 9} → 5; {1, 2} → 1; {7} → none (contract: n ≥ 2 distinct — document). The three-way champion is the exercise: two ifs with the demotion order right.
C5 — The deduplicator
Sorted version — two-pointer read/write:
int w = 1; // write position (box 0 always stays)
for (int r = 1; r < n; r = r + 1) {
if (a[r] != a[w - 1]) { a[w] = a[r]; w += 1; } // keep first of each run
}
return w; // new logical size
Sorted input makes duplicates adjacent, so one comparison against the last kept value suffices. Unsorted: keep a “seen” tally/scan — O(n²) with the tools so far (for each r, scan kept boxes a[0..w-1]), fine at course scale. The n-returning signature: int dedup(int a[], int n) — shrink the logical size, boxes beyond w are simply unused.
C6 — The merger
int i = 0, j = 0, w = 0;
while (i < nA && j < nB) {
if (a[i] <= b[j]) c[w++] = a[i++]; // <= keeps the merge stable
else c[w++] = b[j++];
}
while (i < nA) c[w++] = a[i++]; // drain the leftovers — one of these runs
while (j < nB) c[w++] = b[j++];
Two pointers each own a sorted array; the smaller head advances. The two drain loops handle the tails (only one can have leftovers). Trace {1,4,7} + {2,3,9} → 1, (1<2) then 2, 3, 4, 7, 9 ✓. This is merge — Unit 10 will recurse it into merge sort.
C7 — The histogram
Ten bands: int bands[10] = {0}; — the index formula converts a mark to a band: band = mark / 10 for 0–99, with 100 folded into band 9 (mark == 100 ? 9 : mark / 10 — the boundary the division misses). Guard the range (gallery A3, data-as-index), tally, then print band*10–band*10+9 labels with setw-aligned star rows. Test rows: 0 → band 0; 99 → band 9; 100 → band 9; 55 → band 5.
C8 — The majority report
Pass 1: tally into count[value] (values bounded — say 0..99; guard as in C7). Pass 2: champion over the tally; report the value if count[champion] > n / 2 — strictly greater, so a 50/50 split reports none. Trace {2,2,3,2,3}: counts 2→3, 3→2; champion 2; 3 > 5/2 = 2 ✓ → majority 2. {1,2,1,2}: no value exceeds 2 → none. Two passes, one array of counters — the tally idiom answering a victory question.
C9 — The saddle hunter
Hand: row maxima are 6, 3, 9; column minima are 1, 2, 3 — the box (row 1, col 2) = 3 is both (max of its row 3 ≥ 6? no — recheck: row 1 is {1,2,3}, max 3 ✓; column 2 is {6,3,9}, min 3 ✓) → saddle at (1, 2) with value 3. Code: per row, find the max and its column; then scan that column for the min; saddle iff the two agree. Rows with tied maxima need all their columns checked (test { {3,3},{3,3}} — every box is a saddle!). The composition: two champion passes with a shared coordinate.
C10 — The multiplication prover
By hand: row 0 · col 0 = 1×5 + 2×7 = 19; (0,1) = 6+16 = 22; (1,0) = 15+28 = 43; (1,1) = 18+32 = 50 → { {19,22},{43,50}} ✓ (matches S32). Identity check: A × I — row 0 · col 0 = 1×1 + 2×0 = 1; row 0 · col 1 = 0 → { {1,2},{3,4}} = A itself. Multiplying by the identity is the matrix world’s ×1: any correct implementation must return A unchanged — a zero-cost regression test baked into mathematics.
C11 — The diagonal inspector
(a) Diagonal matrix: one full-grid pass, if (r != c && a[r][c] != 0) return false;. (b) Symmetric: for r, for c: if (a[r][c] != a[c][r]) return false; — early exit on the first mismatch. Asymmetric data is mandatory for (b)’s test: on a symmetric matrix every implementation passes; on { {1,2},{3,4}} a wrong version (say, testing only r < c) still passes half the checks but must fail the honest one — design test data so each comparison is exercised both ways.
C12 — The magic square
Team: int rowSum(const int g[][3], int r), int colSum(..., int c), int diagSum(g, bool main), then bool isMagic(const int g[][3]) — collect all nine sums into an array int sums[9] (rows 0–2, cols 3–5, diag 6, anti 7… that’s 8 — the ninth comparison is each against the first), and verify sums[i] == sums[0] for all i. Lo Shi test: { {8,1,6},{3,5,7},{4,9,2}} → rows 15/15/15, cols 15/15/15, diagonals 15/15 → magic ✓. The array-of-sums trick is the lesson: even your checks become data a loop can walk.
C13 — The stable partitioner
Extra array, two write pointers: for r in 0..n-1: if (a[r] even) tmp[we++] = a[r]; then a second pass for odds (tmp[wo++], wo starting at we). One extra array, two stable passes, order preserved: {3, 8, 5, 2} → evens 8, 2 then odds 3, 5 → {8, 2, 3, 5} ✓. In-place stable partition with O(1) extra space is a genuinely hard classical problem — attempting it honestly and failing informatively (the rotations needed scramble order) is the point: stability costs either time or space, pick one knowingly.
C14 — The window analyst
Brute force: for each start, sum k boxes — O(n·k). Sliding window: sum boxes 0..k−1 once; then for each slide sum += a[i] − a[i-k] — O(n) total. Trace n=7, k=3, {4, 2, 7, 1, 9, 5, 8}: first window 13; slides: 10 (−4+1), 17 (−2+9), 17 (−7+5), 22 (−1+8) → best 22, window starting at index 4. Two test traps: k = n (one window) and k > n (reject in the reader). The sliding trick — add the entering, subtract the leaving — is the difference between re-summing and updating an accumulator.
C15 — The local-maxima cartographer
Interior boxes: a[i] > a[i-1] && a[i] > a[i+1]. End boxes are the exercise: index 0 is a local max iff a[0] > a[1]; index n−1 iff a[n-1] > a[n-2]. Trace {3, 7, 4, 9, 2}: i=0: 3 > 7 no; i=1: 7>3 && 7>4 ✓; i=2: no; i=3: 9>4 && 9>2 ✓; i=4: 2>9 no → positions 1 and 3 ✓. Test the flat-top case {5, 5, 1} — strictly greater means neither 5 qualifies; document the plateau policy. Structure: one pass with three guarded branches (two edges, one interior) — bounds discipline at both ends of the same loop.