Arrays Exercises (32)
← Module home · ★ = first pass · ★★ = needs the passes · ★★★ = combines ideas
How to use this page. Attempt 15 minutes before opening any solution. Draw the boxes first — indices above, values below — then code. Solutions S17+ are function teams; compare signatures, not just bodies.
Part A — Boxes, indexing, traversal (★, E1–E8)
E1. Declare an array of 6 integers, initialize it to {4, 8, 15, 16, 23, 42} with an initializer list, and print the third and last boxes. State both indices before coding.
E2. Draw the boxes for int a[5] = {2}; — what does each box hold? Then the same for int b[5]; (local, uninitialized). What may you legitimately say about b’s contents?
E3. Write the traversal that prints an array’s values on one line, space-separated, with a newline only at the end. Then the backward traversal printing the same values in reverse.
E4. Read n (validated 1–20) and n values into an array; print them back with their positions: box 0: 72 per line. Then print only the odd-positioned boxes (indices 1, 3, …).
E5. Given int a[8] = {5, 3, 8, 1, 9, 2, 7, 4}; — without running code, write the values of a[0], a[3], a[7], a[8] (mark the last one’s verdict), and a[a[1]].
E6. Update pass: read n values, then add 5 to every box (in place), then print. Then a second variant: double only the boxes whose current value is even.
E7. Bounds audit — for each, say whether it compiles, and what may happen at run time:
(a) int a[4]; std::cout << a[4];
(b) int a[4]; std::cin >> a[3];
(c) int a[4]; int i = 2; a[i + 1] = 0;
(d) int a[4]; a[-1] = 0;
E8. Read values until sentinel −1 into an array of capacity 10, printing Array full if a 11th value (before the −1) is attempted. Print how many landed. Then state which gallery bug the capacity check prevents.
Part B — The classic passes (★★, E9–E16)
E9. Write linearSearch (from Lesson 2 §1) and a driver that searches {4, 8, 15, 16, 23, 42} for 15, for 42, and for 7 — three calls, expected results written first.
E10. Count-the-matches variant: count how many boxes equal a target. Trace on {3, 7, 3, 9, 3} for target 3.
E11. Write indexMax and indexMin (Lesson 2 §2) and use them to print the values of the largest and smallest boxes of {72, 85, 91, 67, 88}.
E12. Sum and average of {72, 85, 91, 67, 88} — write the expected sum by hand first, then verify. State the division fix that makes the average 80.6 instead of 80.
E13. Frequency: 12 answers each 1–5 arrive in an array; print a tally per option and name the mode. Trace the tally array for {1, 3, 3, 5, 2, 3, 4, 1, 3, 5, 3, 2} — mode 3 with 5 votes.
E14. Copy {1, 2, 3, 4, 5} into a second array with the element loop; prove the copy is independent by changing copy1[0] and reprinting both.
E15. Write double averageOf(const int a[], int n) and int countAtLeast(const int a[], int n, int cut). Then: how many of {72, 85, 91, 67, 88} are at least the class average? (Two passes over stored data — the Functions C1 wall falling.)
E16. Merge-two-counters: one pass that computes the sum of the even boxes and the sum of the odd boxes of {1..10}. (Expected: 30 and 25 — verify by hand.)
Part C — Arrays and functions (★★, E17–E24)
E17. Sign and write void fillWithSquares(int a[], int n) (box i gets i²) and a driver printing the first 6 squares. What is a[0], and why does the identity start there?
E18. The handle experiment: write void tryZero(int data[]) that sets data[0] to 0, and a main that proves the caller’s array changed. One sentence: what actually got passed?
E19. Add const where it belongs — sign these three correctly and justify each:
(a) a function printing all boxes; (b) a function filling random-ish test values; (c) a function counting boxes equal to x.
E20. Write int readData(int data[], int capacity) reading until sentinel −1 or capacity; return the logical size. Then printMarks(const int a[], int n) printing n boxes. Wire both in a main that reads, prints, and reports the count.
E21. Trace the boxes for:
void twist(int a[], int n) {
for (int i = 0; i < n; i = i + 1) a[i] = a[i] * 2;
}
int main() {
int v[3] = {1, 2, 3};
twist(v, 3);
std::cout << v[0] << v[1] << v[2] << '\n';
return 0;
}
E22. A teammate writes int sumOf(const int a[], int n) but inside uses sizeof(a) / sizeof(a[0]) instead of n. Explain precisely why this is wrong inside a function (what does sizeof(a) return there?), and test their version against yours on a 3-box and a 100-box array.
E23. Write void minMax(const int a[], int n, int& lo, int& hi) — one pass, two reference outputs (Functions minMax over an array). Contract for n = 0?
E24. Function team plan (signatures only): a program reads up to 30 temperatures, then reports count, average, hottest index, coldest index, and how many were above average. Write the prototype block in house order and mark each function const/plain and why.
Part D — Matrices (★★–★★★, E25–E32)
E25. Declare int g[2][3] = { {1,2,3},{4,5,6}}; and print it as a grid. Then print g[1][0] and g[0][2] — state both coordinates in row, column order before running.
E26. Read a 3×3 grid from input row by row, then print it with column headers. Which loop is outer, and why?
E27. Row sums and column sums of { {1,2,3},{4,5,6},{7,8,9}} — compute all six by hand first, then verify. (Rows: 6, 15, 24. Columns: 12, 15, 18.)
E28. The whole-grid pass: total of all boxes, plus the box count. Then the max of all boxes and its coordinates (two answers — which loop structure finds coordinates naturally?).
E29. Row and column reports: given a 4×3 marks grid (4 students, 3 subjects), print each student’s total and each subject’s average. Which accumulator resets where?
E30. Write void addMatrices(const int a[][3], const int b[][3], int sum[][3], int rows) — box-by-box sum. Then transpose: void transpose(const int a[][3], int t[][3], int rows) with asymmetric test data; explain why symmetric data would have hidden a swapped-index bug (gallery M1).
E31. Diagonal pass: for a 4×4 grid, print the main diagonal (r == c) and the anti-diagonal (r + c == 3) — one traversal, two conditions.
E32. Matrix multiplication, by hand then in code, for A = { {1,2},{3,4}}, B = { {5,6},{7,8}}. Write the expected prod (first row: 19, 22) before coding the triple loop.
Solutions (S1–S32)
S1 — Boxes and indices
int a[6] = {4, 8, 15, 16, 23, 42};
std::cout << a[2] << ' ' << a[5] << '\n'; // 15 and 42
Third box = index 2 (offset from the start); last = index 6 − 1 = 5 — the last-index rule.
S2 — Initializer vs garbage
a = {2, 0, 0, 0, 0} — the listed value lands in box 0, the rest become 0. b = five boxes of garbage; the only honest statement is “their values are undefined until assigned” — reading them before writing is a bug (gallery A6).
S3 — Two traversals
for (int i = 0; i < n; i = i + 1) std::cout << a[i] << ' ';
std::cout << '\n';
for (int i = n - 1; i >= 0; i = i - 1) std::cout << a[i] << ' ';
std::cout << '\n';
Backward bound: start at n − 1 (the last valid index), continue while i >= 0. The i < n style has no backward twin — this is why both traversal patterns belong in your hands.
S4 — Positions
for (int i = 0; i < n; i = i + 1)
std::cout << "box " << i << ": " << a[i] << '\n';
for (int i = 1; i < n; i = i + 2) // odd positions: start 1, step 2
std::cout << a[i] << ' ';
The step-2 loop is Iteration S2’s step idiom wearing an index.
S5 — Index arithmetic
a[0] = 5 · a[3] = 1 · a[7] = 4 · a[8] = out of bounds — undefined, do not use · a[a[1]] = a[3] = 1 (the index is itself a box’s value — data-as-index, the tally mechanic in miniature).
S6 — Updates
for (int i = 0; i < n; i = i + 1) a[i] += 5; // everyone
for (int i = 0; i < n; i = i + 1)
if (a[i] % 2 == 0) a[i] *= 2; // evens only
Both are in-place update passes — the box is read and written in the same statement.
S7 — Bounds audit
(a) compiles; reads past the end — garbage or worse (undefined). (b) fine — a[3] is the last box of four. (c) fine — i + 1 = 3, the last box. (d) compiles; writes before the array — the most dangerous class: corrupts whatever lives there.
S8 — Capacity guard
int data[10], n = 0, value;
std::cin >> value;
while (value != -1) {
if (n >= 10) { std::cout << "Array full\n"; break; }
data[n] = value; n += 1;
std::cin >> value;
}
std::cout << n << " value(s)\n";
Prevents gallery A7 — the sentinel read past capacity. Note the check sits before the write: the 11th value is rejected, never stored.
S9 — Search driver
Expected first: 15 → index 2; 42 → index 5; 7 → −1. Then the three calls confirm. The miss convention (−1) is exercised by the third row — and every caller must check it.
S10 — Count matches
int count = 0;
for (int i = 0; i < n; i = i + 1)
if (a[i] == target) count += 1;
Trace {3,7,3,9,3}, target 3 → count 3. No early return — a count is global (Functions C3’s stopping-power lesson).
S11 — Champions
int imax = indexMax(a, n); // 2 → a[imax] = 91
int imin = indexMin(a, n); // 3 → a[imin] = 67
Seed at box 0; challengers from box 1; the index is the answer, the value one dereference away.
S12 — Sum, average
Hand sum: 72+85+91+67+88 = 403. Average = 403/5 = 80.6 — so static_cast<double>(total) / n is required; plain total / n would print 80 (integer division).
S13 — Tally
tally[1..5] ends as {2, 2, 5, 1, 2} — sums to 12 ✓ (sanity check: tallies must sum to n). Mode = 3 (5 votes) via indexMax over tally[1..5] — note box 0 excluded by construction (answers are 1-based).
S14 — Independent copy
for (int i = 0; i < n; i = i + 1) copy1[i] = a[i];
copy1[0] = 99;
// print both: a = {1,2,3,4,5}, copy1 = {99,2,3,4,5}
Independence is the proof that the loop made new boxes — = wouldn’t compile, and a “copy” sharing boxes would show 99 in both.
S15 — Above average
Average = 80.6 → countAtLeast(a, 5, 81) = 2 (85, 91)… but hold on: “at least the average” with the true 80.6 means 85 and 91 → 2. The cast decision (compare against 80.6 directly vs a rounded int) changes the answer — document which policy you chose. The two passes over stored data are exactly what Functions C1 couldn’t do.
S16 — Even/odd sums
int evenSum = 0, oddSum = 0;
for (int i = 0; i < n; i = i + 1) {
if (a[i] % 2 == 0) evenSum += a[i];
else oddSum += a[i];
}
{1..10}: even boxes (values) 2+4+6+8+10 = 30; odd 1+3+5+7+9 = 25. Two accumulators, one pass.
S17 — Squares
void fillWithSquares(int a[], int n) {
for (int i = 0; i < n; i = i + 1) a[i] = i * i;
}
a[0] = 0 — zero squared; the identity of “start counting at 0” appearing in the values. Plain (non-const) parameter: the function is a writer (Lesson 3 §2).
S18 — The handle experiment
main’s array prints 0 in box 0 — because what got passed was the address of the caller’s first box (a handle), not a copy (Lesson 3 §1). Same boxes, second name.
S19 — Const placement
(a) void printAll(const int a[], int n) — reader. (b) void fillTest(int a[], int n) — writer. (c) int countEqual(const int a[], int n, int x) — reader. Rule: const for every read-only array parameter; writers plain.
S20 — Read and print
int readData(int data[], int capacity) {
int n = 0, value;
std::cin >> value;
while (value != -1 && n < capacity) {
data[n] = value; n += 1;
std::cin >> value;
}
return n;
}
void printMarks(const int a[], int n) {
for (int i = 0; i < n; i = i + 1) std::cout << a[i] << ' ';
std::cout << '\n';
}
Writer plain, reader const; the logical size flows from one to the other (Lesson 3 §3).
S21 — twist
Prints 246. twist received a handle; each a[i] *= 2 doubled the caller’s boxes. Compare with Functions E8 — ints copied, arrays aliased.
S22 — sizeof trap
Inside the function, a is just the handle — sizeof(a) is the size of the handle (typically 4 or 8 bytes), not the row. On a 3-int array, sizeof(a)/sizeof(a[0]) yields something like 1 or 2, not 3 — and it’s constant regardless of n: the 100-box test exposes it (the teammate’s “sum” adds 1–2 boxes). The size parameter exists precisely because the handle carries no length.
S23 — minMax
void minMax(const int a[], int n, int& lo, int& hi) {
// contract: n >= 1 (an empty array has no champion)
lo = a[0]; hi = a[0];
for (int i = 1; i < n; i = i + 1) {
if (a[i] < lo) lo = a[i];
if (a[i] > hi) hi = a[i];
}
}
One pass, two reference outputs; inputs left, outputs right. n = 0: contract violated — the caller guards (or the function could return a bool).
S24 — Team plan
int readTemps(int t[], int capacity); // writer
double averageOf(const int t[], int n); // reader (uses sum)
int indexMax(const int t[], int n); // reader
int indexMin(const int t[], int n); // reader
int countAbove(const int t[], int n, double cut); // reader — cut is double: the true average
One writer, four readers; countAbove takes the unrounded average — the S15 policy lesson baked into a signature.
S25 — Grid declare
g[1][0] = 4 (row 1, column 0) · g[0][2] = 3 (row 0, column 2). Row first, always.
S26 — Grid read
Outer = rows: input arrives “row by row”, so the row loop must be the slow one — three rows, each consuming 3 values in its inner loop. Headers: print c values before the row loop, then per row print the row label and boxes.
S27 — Six sums
Rows 6/15/24, columns 12/15/18 — verified by hand before coding. Structure: per-row pass (reset inside outer); per-column pass with c frozen in the outer loop.
S28 — Whole grid
int total = 0, best = g[0][0], br = 0, bc = 0;
for (int r = 0; r < R; r = r + 1)
for (int c = 0; c < C; c = c + 1) {
total += g[r][c];
if (g[r][c] > best) { best = g[r][c]; br = r; bc = c; }
}
Coordinates come from tracking two champions — position, not just value (Lesson 2 §2 in 2D).
S29 — Row and column reports
for (int r = 0; r < 4; r = r + 1) { // per-student totals
int rowTotal = 0; // RESET per row
for (int c = 0; c < 3; c = c + 1) rowTotal += marks[r][c];
std::cout << "Student " << r + 1 << ": " << rowTotal << '\n';
}
for (int c = 0; c < 3; c = c + 1) { // per-subject averages
int colTotal = 0; // RESET per column
for (int r = 0; r < 4; r = r + 1) colTotal += marks[r][c];
std::cout << "Subject " << c + 1 << " avg: "
<< static_cast<double>(colTotal) / 4 << '\n';
}
The accumulator resets at the top of each outer pass — gallery M2.
S30 — Add and transpose
void addMatrices(const int a[][3], const int b[][3], int sum[][3], int rows) {
for (int r = 0; r < rows; r = r + 1)
for (int c = 0; c < 3; c = c + 1)
sum[r][c] = a[r][c] + b[r][c];
}
void transpose(const int a[][3], int t[][3], int rows) {
for (int r = 0; r < rows; r = r + 1)
for (int c = 0; c < 3; c = c + 1)
t[c][r] = a[r][c];
}
Test transpose on { {1,2,3},{4,5,6}} (2×3 → its transpose is 3×2 with t[0][1] == 4): asymmetric data proves the index order — symmetric data can’t tell t[c][r] from t[r][c].
S31 — Diagonals
for (int r = 0; r < 4; r = r + 1) {
if (r == c_pattern) ... // see below
}
// one traversal:
for (int r = 0; r < 4; r = r + 1)
for (int c = 0; c < 4; c = c + 1) {
if (r == c) std::cout << g[r][c] << ' '; // main diagonal
if (r + c == 3) std::cout << g[r][c] << ' '; // anti-diagonal
}
Diagonals are index conditions, not loops (Lesson 4 §4); a 4×4 has 4 boxes per diagonal, 7 visited boxes total in this pass (the centre boxes of odd squares would coincide).
S32 — Multiply
By hand: prod[0][0] = 1×5 + 2×7 = 19; prod[0][1] = 1×6 + 2×8 = 22; prod[1][0] = 3×5 + 4×7 = 43; prod[1][1] = 3×6 + 4×8 = 50 → { {19,22},{43,50}}.
for (int r = 0; r < 2; r = r + 1)
for (int c = 0; c < 2; c = c + 1) {
prod[r][c] = 0; // accumulator per box
for (int k = 0; k < 2; k = k + 1)
prod[r][c] += a[r][k] * b[k][c];
}
The triple loop: r, c select the output box; k walks the shared dimension. The reset-to-0 before the k-loop is the per-box accumulator — forget it and every box accumulates garbage on top of garbage.