Functions Exercises (26)

← Module home · ★ = first pass · ★★ = needs the idioms · ★★★ = combines ideas

How to use this page. Attempt each exercise for at least 15 minutes before opening its solution — each exercise links to its own. For design exercises, write the function list (name, parameters, returns) first; for traces, dry-run on paper first.


Part A — First machines (★, E1–E7)

E1. Write double square(double x) and a main that prints square(2.5), square(3), and square(square(2)). State the last one’s value before running, using the call-flow diagram of Lesson 1 §4.

E2. Write int max2(int a, int b) (no if/else — two returns) and int max3(int a, int b, int c). Rule: max3 must call max2 twice, never compare directly. Trace max3(4, 9, 2) in a table.

E3. Write void printBox(int w, int h) that prints a hollow rectangle of * (from Iteration C12). Call it three times with different sizes. Why is void the right return type here?

E4. Write bool isEven(int n) and use it in a loop in main that prints the even numbers from 1 to 20. (You’re wrapping the Iteration S2 filter in a machine.)

E5. Write char gradeOf(int marks) implementing the course ladder (≥80 A, ≥70 B, ≥60 C, ≥40 D, else F). Then write the five-row test table for it before running, including boundary owners 80, 79, 40, 39.

E6. Trace on paper, then run: what does this print? (Call-flow diagram first.)

int twist(int n) {
    n = n * 2;
    return n + 1;
}
int main() {
    int n = 5;
    int result = twist(n);
    std::cout << n << ' ' << result << '\n';
    return 0;
}

E7. Each snippet has one function-mechanics bug. Name it (gallery) without compiling: (a) void f(int x) { return x * 2; } (b) int g(int x); int main() { return g(3); } int g(int x) { return x; } — prototype int g(int x);, definition int g(double x) { ... } variant: prototype says int g(int);, definition is int g(int x, int y). (c) int h(int x) { if (x > 0) return 1; } called with h(0).


Part B — Copies, scope, prototypes (★★, E8–E13)

E8. Predict the output, tracing the boxes:

void bump(int a, int b) { a += 1; b += 10; }
int main() {
    int a = 1, b = 2;
    bump(b, a);            // note the order!
    std::cout << a << ' ' << b << '\n';
    return 0;
}

E9. Write void trySwap(int a, int b) that swaps its parameters, then demonstrate in main (with printed before/after) that the callers are unchanged. One sentence: why?

E10. Scope audit. For each variable, state its scope (which functions see it) and whether the program compiles:

int g = 1;
void f() {
    int a = g;          // (i)
}
int main() {
    int b = 2;
    f();
    // a = 3;           // (ii)
    // g = b;           // (iii)
    return 0;
}

Then rewrite the program with g removed: f must return the value it used to fetch from g, and main must pass it in.

E11. Convert this define-above program to house style — prototypes → main → definitions — without changing behaviour:

double half(double x) { return x / 2; }
int main() {
    std::cout << half(9) << '\n';
    return 0;
}

E12. Decomposition plan (no code): “A program reads a student’s five marks, validates each (0–100, re-prompt), computes the average and grade, and prints a formatted report.” Produce the function table (name / takes / returns / job), mark each row alone-testable or not, and write the narrator main in pseudocode.

E13. A teammate’s function compiles, runs, and passes three tests — but uses the global int attempts = 0; to count calls. Explain the two concrete ways this breaks, then fix the signature so the count is honest.


Part C — References and testing (★★, E14–E19)

E14. Trace the boxes for:

void wire(int& r, int v) { r = v * 2; v = 100; }
int main() {
    int a = 3, b = 4;
    wire(a, b);
    std::cout << a << ' ' << b << '\n';
    return 0;
}

E15. Write void divMod(int a, int b, int& q, int& r) producing quotient and remainder in one call (guard: caller promises b ≠ 0 — document it). Write the four-row test table, then a check-style driver for two of the rows.

E16. Rewrite Iteration S25’s digit-stats as one function void digitStats(long long n, int& count, int& sum, long long& reversed) — one pass over the digits, three answers. (Input order: value in, three outputs out — the house convention.)

E17. Which of these calls compile, and why (not)?

void f(int& x);
int a = 1;
f(a);        // (i)
f(2);        // (ii)
f(a + 1);    // (iii)

E18. Write the mini-driver for isPrime (your Iteration S28 machine) with check-style output: rows for 2, 3, 4, 9, 4729, 1, 0. Two of those rows are boundary/edge — say which and why they matter.

E19. Design decision: a function must produce the average and the pass count of five marks. Compare two designs — (A) double stats(int m1..m5, int& passed) vs (B) two functions double average(...) and int countPassed(...). Which does the house style prefer, and what tips the balance if a third statistic is added tomorrow?


Part D — Overloads, defaults, refactoring (★★–★★★, E20–E26)

E20. Write overloaded double area(double side) (square) and double area(double l, double w) (rectangle) and double area(double a, double b, double h)? — stop: that third one is a trapezium needing different parameters. Write the first two only, plus area for a circle (double area(double r) — wait, that’s the same signature as the square!). Resolve the collision honestly: rename or re-signature, and justify.

E21. Predict, then verify: which overload runs for each call?

void p(int x)    { std::cout << "I\n"; }
void p(double x) { std::cout << "D\n"; }
p(3); p(3.0); p('A'); p(true); p(3.0f);

E22. Write void printLine(char fill = '-', int width = 20) and show three calls: default, one explicit, both explicit. Then add printLine(int width) — does it compile? Explain the clash using Lesson 4 §2.

E23. Fix the trailing-default violation: void log(double value, int digits = 2, bool debug) — re-order the parameters so it compiles and keeps every caller sensible. Show the two resulting call forms.

E24. The iteration module’s Lab 5 copy-pasted its robust reader four times. Sketch the signature of ONE function that replaces all four, list its parameters (prompt, minimum, maximum — anything else?), and state which past behaviour would need a decision (non-numeric message? range message?).

E25. Refactor plan (no full code): given the giant-main electricity bill program from the decisions module, produce the ordered extraction list (which block first, second, …) and the baseline test rows you’d record before touching anything.

E26. Each snippet breaks one overload/defaults rule. Name the rule: (a) int f(int); double f(int); (b) void g(int a = 1, int b); (c) void h(int x); void h(int x, int y = 0); then calling h(1). (d) prototype double rate(double); and default .15 also written on the definition.


Solutions (S1–S26)

Compare designs first — a different but honest decomposition is a win.

S1 — Square and nesting

double square(double x) { return x * x; }
// main: 6.25, 9, 24.0144...

square(square(2)): inner call runs first (2 → 4), its return value becomes the outer argument (4 → 16). Stack: main → square → back → square → back. Value: 4² = 16.

S2 — max2, max3

int max2(int a, int b) {
    if (a > b) return a;
    return b;
}
int max3(int a, int b, int c) {
    return max2(a, max2(b, c));
}

Trace max3(4, 9, 2): inner max2(9, 2) → 9; outer max2(4, 9) → 9. One direct comparison in max3 would duplicate max2’s logic — composition is the point.

S3 — printBox

void printBox(int w, int h) {
    for (int r = 1; r <= h; r = r + 1) {
        for (int c = 1; c <= w; c = c + 1) {
            if (r == 1 || r == h || c == 1 || c == w) std::cout << "* ";
            else                                      std::cout << "  ";
        }
        std::cout << '\n';
    }
}

void because nothing is computed — the effect is the printout; there’s no value for a caller to use.

S4 — isEven

bool isEven(int n) { return n % 2 == 0; }
// main:
for (int i = 1; i <= 20; i = i + 1) {
    if (isEven(i)) std::cout << i << ' ';
}

The loop filters via a question-machine — computation (parity) separated from printing, exactly the Lesson 1 split.

S5 — gradeOf

char gradeOf(int marks) {
    if (marks >= 80) return 'A';
    if (marks >= 70) return 'B';
    if (marks >= 60) return 'C';
    if (marks >= 40) return 'D';
    return 'F';
}

Table (write first, verify after): 85→A, 80→A, 79→B, 70→B, 69→C, 60→C, 59→D, 40→D, 39→F, 0→F. Most-demanding-first ladder inside a machine.

S6 — twist

Prints 5 11. twist doubled its own copy (n=5 stays 5 in main; copy becomes 10, returns 11). main’s n never touched — the copy rule in one line.

S7 — Mechanics bugs

(a) void function returns a value — compiler error (or, if it were int f, missing return on the else path — F7’s cousin). Make it int f(int x) { return x * 2; }. (b) Prototype promises (int), definition delivers (int, int) — the linker then rejects the call: declared-and-defined machines don’t match (F1’s signature-mismatch form). (c) h(0) falls off the end with no return — F7; add the final return 0; (or else).

S8 — bump

Prints 1 2. Inside bump, a is a copy of b’s value (2→3) and b a copy of a’s (1→11) — both destroyed at return. Swapped argument order changes nothing outside.

S9 — trySwap

void trySwap(int a, int b) { int t = a; a = b; b = t; }
// main: print x y; trySwap(x, y); print x y — identical lines.

Because parameters are copies (Lesson 2 §1); the real swap needs int& — Lesson 3 §2.

S10 — Scope audit

(i) legal — f sees the global. (ii) illegal — a is local to f, dead after return. (iii) legal — main sees g. Program compiles. De-globalised:

int f(int g) { return g; }          // takes what it used to fetch
int main() {
    int g = 1;
    g = f(g);                       // or just use the return directly
    return 0;
}

S11 — House style

double half(double x);              // prototype

int main() {
    std::cout << half(9) << '\n';
    return 0;
}

double half(double x) { return x / 2; }   // definition, any order now

S12 — Decomposition plan

Function Takes Returns Job Alone-testable
readMark — int validated single mark logic yes (console no — keep it thin)
average5 5 ints double arithmetic yes
gradeOf int char ladder yes
printReport 5 ints void formatting + calls the above via its parts
MAIN
    read five marks (readMark x5)
    SET avg TO average5(m1..m5)
    SET gr  TO gradeOf(ROUND(avg))     ← policy decision: grade the average? document it
    CALL printReport(m1..m5, avg, gr)

The grade-the-average-vs-grade-each question is exactly the kind of ambiguity decomposition surfaces before coding.

S13 — Global attempts

Breaks: (1) tests can’t run in isolation — every test starts with attempts inherited from the last; (2) any future function can silently reset/change it — action at a distance (Lesson 2 §3). Fix: the counter belongs to the caller’s loop — main counts calls; the function stays pure. If it must report its own calls, return the count or take int& attempts.

S14 — wire

Prints 8 4. r is a wire to main’s a: r = 8 writes main’s box. v is a copy of b — v = 100 dies at return.

S15 — divMod

void divMod(int a, int b, int& q, int& r) {
    // caller contract: b != 0 (division by zero otherwise)
    q = a / b;
    r = a % b;
}

Table: (17,5)→3,2 · (20,5)→4,0 · (3,7)→0,3 · (-7,2)→-3,-1 (truncation toward zero — document it!). Driver with check on rows 1–2.

S16 — digitStats

void digitStats(long long n, int& count, int& sum, long long& reversed) {
    count = 0; sum = 0; reversed = 0;
    while (n > 0) {
        int d = n % 10;
        sum += d;
        reversed = reversed * 10 + d;
        count += 1;
        n = n / 10;
    }
}

One pass, three answers — replaces two separate loops from S25/S26. (Edge: n = 0 → all zeros; document like S25.)

S17 — Reference calls

(i) compiles — a variable. (ii) no — no box to attach the wire to. (iii) no — a + 1 is a value, not a variable (Lesson 3 §3).

S18 — isPrime driver

void check(bool got, bool want, const char* label) {
    std::cout << (got == want ? "PASS " : "FAIL ") << label << '\n';
}
int main() {
    check(isPrime(2),    true,  "smallest prime");
    check(isPrime(3),    true,  "odd prime");
    check(isPrime(4),    false, "first composite");
    check(isPrime(9),    false, "odd composite");
    check(isPrime(4729), true,  "lab-10 value");
    check(isPrime(1),    false, "boundary: not prime by definition");
    check(isPrime(0),    false, "edge: rejected by n > 1 guard");
    return 0;
}

Boundary rows: 1 (the definition’s lower edge) and 0 (garbage tolerance). 2 is the even-prime boundary — a naive even-skipping optimisation breaks it.

S19 — Stats design

House style prefers (B) — two single-job machines, each with its own clean test table; composition in main: passed = countPassed(...); avg = average(...). (A) couples two answers and forces a reference. But if a third statistic arrives: five parameters × three functions gets noisy — that’s the moment minMax-style multi-output references (or a struct, later) start winning. Design rules have scope: single-job until the parameter list itself becomes the problem.

S20 — Area overloads

double area(double side);                  // square
double area(double l, double w);           // rectangle

Circle can’t be area(double) — it is the square’s signature. Honest fixes: circleArea(double r) (distinct concept, distinct name), or area(double r, bool isCircle) — which is worse (a bool flag is a hidden second machine). Different meanings deserve different names — overload by meaning only.

S21 — Overload picks

p(3)→I · p(3.0)→D · p('A')→I (char promotes to int) · p(true)→I (bool→int beats bool→double) · p(3.0f)→D (float→double is a promotion). Compare with Lesson 4’s table — the true row is the famous surprise.

S22 — printLine

void printLine(char fill = '-', int width = 20) {
    for (int i = 1; i <= width; i = i + 1) std::cout << fill;
    std::cout << '\n';
}
// printLine();        → 20 dashes
// printLine('=');     → 20 equals
// printLine('*', 5);  → 5 stars

Adding void printLine(int width) does not compile alongside it cleanly: printLine(30) would be ambiguous-ish (int→char conversion for the first overload vs exact for the second) — and printLine('x') already binds to char fill. The clash is the defaults+overloads trap: don’t grow by overload what a default already serves.

S23 — Trailing default

void log(bool debug, double value, int digits = 2);
// log(false, 3.14159);         → digits 2
// log(true, 3.14159, 4);       → digits 4

The defaulted parameter must be rightmost; debug moves to the front (and is now required, which is honest — callers should say whether they’re debugging).

S24 — readInRange

int readInRange(const char* prompt, int lo, int hi);

(Or const std::string& — the Strings module formalises strings.) Replaces all four copied readers. Decisions to make explicit: one message for non-numeric (“Numbers only, please.”) and one for range (“Between lo and hi, please.”) — parameterise or standardise? House choice: standardise the wording, parameterise the bounds. This becomes a library entry (Lesson 3 §6).

S25 — Extraction order

Baseline rows first: units 50/100/150/200/201/400 outputs written down (walkthrough §3). Order: 1) computeBill (slab ladder — pure, testable), 2) applySurcharge (pure decision), 3) printReceipt (output block), 4) readUnits (input loop), 5) main as narrator. Compile-and-compare after each.

S26 — Overload/defaults rules

(a) return type alone can’t overload. (b) defaults must trail. (c) ambiguity — h(1) fits both signatures. (d) default declared twice — put it on the prototype only.