Functions Challenges (10)
← Module home · Design-first problems ★–★★★. Attempt on paper (function list + test table) before code — the Try It Yourself protocol applies. Solutions describe approaches; your decomposition may differ and be right.
The problems
C1 ★ — The statistics suite. Design the function set for: read n values (sentinel −1), print count, total, average, min, max, and how many were above average. Constraint: no global variables; main narrates. How many functions, and which one is the surprise?
C2 ★ — The unit converter. Design convert(double value, char from, char to) for temperatures (C/F/K). Decide: one function with a switch, or a family of small ones (cToF, fToC, cToK…)? Justify with testability and the overload-by-meaning rule. Then write its test table (include −40 and absolute zero as anchors).
C3 ★★ — The two-output analyzer. Design analyze(long long n, ...) that reports, in ONE pass over the digits: digit count, digit sum, digit product, max digit, min digit. Sign it (how many references?), write the test rows for n = 0, 7, 9045, 99999, and state the pass-count vs single-pass trade-off versus five separate functions.
C4 ★★ — The perfect refactor. Take your Iteration C1 perfect-number search and restructure it as a function team: sumOfProperDivisors(n), isPerfect(n) built on it, and a printPerfectUpTo(limit) that reports. Which function gets the test table with boundary owners, and what are they?
C5 ★★ — The library card. Formalise your personal toolbox: pick any five functions from previous units, write each one’s prototype + one-line contract + three-row test table on a single “library card” page. Which of the five couldn’t be tested without a driver, and why?
C6 ★★ — The menu machine. Design runMenu() for a 4-option utility (from your iteration mini-project): how does the quit decision leave the loop cleanly with prototypes → main → definitions layout, and where do the four option-handlers’ prototypes go? Write the skeleton (signatures only, // TODO bodies).
C7 ★★ — The safe division suite. Design the division trio: bool canDivide(double a, double b), double divide(double a, double b) (caller’s contract: only call when canDivide), and void safeDivide(double a, double b, bool& ok, double& result) (never crashes, reports instead). Same maths, three contracts — write the client code for each and say who each contract serves.
C8 ★★★ — The overload family. Design a readNumber overload family: int readNumber(const char* prompt), int readNumber(const char* prompt, int lo, int hi), double readNumber(const char* prompt, double lo, double hi). Where are the ambiguities (think readNumber("p", 1, 2) — which overload?), how do you resolve them honestly, and where do defaults fit without creating traps?
C9 ★★★ — The pipeline. A payroll pipeline: gross → tax (slab) → bonus (performance %) → net → report. Design the function team so that tax and bonus are individually testable AND swappable (the company changes bonus policy yearly). Write the narrator main, and mark which function’s test table survives a policy change untouched.
C10 ★★★ — The stateless empire. A 150-line program tracks a bank account through deposits, withdrawals, a balance report, and a transaction counter — written by “past you” with two globals (balance, txCount). Produce the de-globalisation plan: every function signature before/after, the new narrator main, and the argument for why the new version is testable row-by-row. (This is the D5/R4 lesson at full scale — the exact refactor you’ll redo with structs in Stage E.)
Solutions (C1–C10)
One sound approach each; compare decompositions first.
C1 — The statistics suite
Five machines: readValue() (thin sentinel reader), printStats(count, total, min, max) (printer), and the surprise — above-average needs a second pass over the data… which the course can’t store yet (no arrays!). Honest resolutions: (a) collect the above-average count in a second reading pass (read the data twice — clumsy but honest), or (b) descope: report above-average only when the data is re-entered. The lesson: decomposition exposes data-dependency walls before code hides them — this is exactly why arrays exist, and C1 has now made you feel it. (Count/total/min/max fold into one reading pass with the four idioms; main holds the state and narrates.)
C2 — The unit converter
Family of small ones wins: cToF, fToC, cToK, kToC are each one formula with one test row each — alone-testable, composable (fToK = cToK(fToC(x))). The convert(value, from, to) switch is one function with a 6-way switch — testable, but every new unit multiplies cases, and a wrong pairing fails silently. Char-code routing also breaks the overload-by-meaning instinct: the name should say the conversion. Anchors: −40 (C == F), 0/32 (freezing), 100/212 (boiling), 0 K = −273.15 °C (the floor — a value below it is garbage: reject with kToC guard or document).
C3 — The two-output analyzer
void analyze(long long n,
int& count, int& sum, long long& product,
int& maxD, int& minD);
Five references + the input — wide but honest, inputs left / outputs right. One pass: peel d; sum += d; product *= d; count++; champion updates for max/min. Test rows: 0 → (0,0,1,0,0) — product’s identity is 1, so zero passes leaves 1; is that the answer for n=0? Document!; 7 → (1,7,7,7,7); 9045 → (4,18,0,9,0) — product 0 because of the 0 digit, the accumulator identity rule colliding with real data; 99999 → (5,45,59049,9,9). Trade-off: five separate functions = five passes, five test tables, five chances for inconsistent edge handling; one pass = one table, but a wide signature. Five statistics is where the multi-output reference design starts paying rent.
C4 — The perfect refactor
sumOfProperDivisors(int n) gets the boundary table: 1 → 0 (no proper divisors), 6 → 6 (perfect), 28 → 28, a prime p → 1, 12 → 16 (abundant). isPerfect(n) is one comparison — n > 1 && sumOfProperDivisors(n) == n — its table is two rows because its job is one sentence. printPerfectUpTo(limit) owns the search loop and the printing. The boundary owners live with the machine that computes the boundary concept — test tables attach to computation, not to orchestration.
C5 — The library card
Example card rows: max2(int,int) → int — “larger of two” — (3,9)→9, (9,3)→9, (-5,-2)→-2. The one that couldn’t be tested without a driver: any reader (e.g. readInRange) — its contract involves the console, so the driver is the test harness (feed keystrokes, observe prompts). The rule that falls out: library = pure machines + thin readers; only pure machines get automatic tables.
C6 — The menu machine
void handleAdd(); // prototypes block
void handleStats();
void handleAnalyze();
void handleHelp();
int readChoice(); // validated reader (gallery D)
int main() { runMenu(); return 0; } // or main IS the menu loop — house style: main narrates
void runMenu() {
int choice;
do {
printMenu(); // printer, separate
choice = readChoice();
switch (choice) { case 1: handleAdd(); break; ... case 0: break; default: ... }
} while (choice != 0);
}
The quit decision lives in the loop condition (sentinel), not a break inside the switch — one exit, visible in the header (iteration Lesson 3 §5). Handlers’ prototypes sit in the same block; their definitions after main. Skeleton-first means each // TODO becomes a one-function task a teammate could take.
C7 — The safe division suite
canDivide/divide = design-by-contract: caller checks, callee trusts — two test tables, zero duplicated checks, fastest at the call site, and the caller’s bug (dividing without checking) is invisible until it crashes. safeDivide = self-defending: one call, no precondition — the bool& out is the cost of safety at every call. Client code: tight numeric loops use the contract pair; interactive calculators and student tools use safeDivide (or the re-prompting reader from the gallery, which prevents the bad call entirely). Three contracts, three audiences — the design question “who is the caller?” is the answer.
C8 — The overload family
The trap: readNumber("p", 1, 2) — 1 and 2 are int literals; they bind exactly to the (const char*, int, int) overload… so far so good; the real ambiguity is readNumber("p", 1.0, 2.0) only matching the double overload (fine) versus mixed readNumber("p", 1, 2.0) — one conversion per argument to either range overload → ambiguous, compiler refuses. Honest fixes: (a) accept it — mixed int/double bounds is a caller bug; write the error message to say so; (b) name them apart (readInt, readDouble) and keep overloads only where the meaning is identical (E20’s rule). Defaults fit cleanly on the reader only where a range has a natural universal (“readNumber(prompt)” = unbounded) — but that signature collides with the bounded int version for any 2-arg call, so the honest family is: readInt(prompt), readInt(prompt, lo, hi), readDouble(prompt, lo, hi) — three machines, zero ambiguity, meaning-aligned names.
C9 — The pipeline
double computeTax(double gross); // slab ladder — pure
double computeBonus(double gross, double rate);
double computeNet(double gross, double taxRate, double bonusRate);
void printPayslip(...);
main: read gross → tax → bonus → net → report. Swappability: bonus policy changes = edit computeBonus (or its rate table), nothing else — the pipeline’s shape is policy-independent because each stage takes values and returns values. The test table that survives untouched: computeTax’s — its slab boundaries belong to tax law, not bonus policy. computeNet’s table changes if stages’ order changes — which is exactly why the order lives in one place (main), visible, not smeared across functions.
C10 — The stateless empire
Signatures before → after: deposit(amount) → double deposit(double balance, double amount); withdraw(balance, amount) → double withdraw(double balance, double amount) (with the insufficiency guard returning a bool via bool& ok or a documented sentinel); report() → void report(double balance, int txCount); counter increments move to main (the orchestrator owns state). New main: reads commands in a sentinel loop, owns balance and txCount, calls pure machines. Testability argument: every machine now has a table that runs with no setup ritual — check(withdraw(100, 30), 70, ...) — whereas the global version needed balance arranged just-so before every row and leaked state between rows. Full-scale note: five pieces of account state would make these signatures groan — that groan is Stage E’s structs calling.