Programming and Problem-Solving Fundamentals

The bridge module between “my compiler works” and Unit 01 · ~3–4 h + practice · ← Course home

The one idea of this module

Programming is not typing code. Programming is thinking, and then typing the thinking.

Students who struggle in Unit 02 are almost never struggling with C++ — they are struggling with the thinking that happens before C++. This module teaches that thinking: how to take a fuzzy, human request like “figure out the electricity bill” and turn it into precise steps a computer can execute. Then, and only then, does it become code.

You will practise on 20 progressively harder scenarios, each fully worked — statement, inputs/outputs, thinking questions, approach, pseudocode, explanation, C++, tests, edge cases — and finish with a problem-solving lab. No C++ knowledge beyond the Week-0 first program is required; every C++ feature used is explained where it first appears, and the same ideas are re-taught formally in Units 02–06.


Try It Yourself Before Looking at the Solution

This section is the most important thing on this page. The 20 scenarios below are fully worked — which makes them wonderful for learning and dangerous for thinking if you read them like a novel.

The rule: your brain must meet every scenario before your eyes do. Reading a solution and nodding produces the feeling of competence without the substance — educators call it the illusion of fluency. A solution you read is a story; a solution you almost-wrote is a skill.

The protocol — before opening any scenario:

1. READ the problem statement only.        (stop before "Thinking questions")
2. RESTATE it aloud in your own words — one or two sentences.
3. SKETCH the IPO: what comes in? what must come out? what happens between?
4. ANSWER the thinking questions in writing — guesses are fine, silence isn't.
5. WRITE pseudocode in your notes — ugly is fine, vague is not.
6. NOW open the scenario. Compare, don't grade:
   - Where did we agree? (reinforces what you already own)
   - Where did they differ? (that difference is the lesson — study it)
   - Which test case would break MY version? (then check if it breaks theirs)
7. Only now: type the C++, compile, run the tests yourself.

Total honest attempt: 5–10 minutes per scenario. Too easy? Good — that confidence is real now. Stuck? Write down where you got stuck and what you would ask, then read. That question in your notes is worth more than the solution is.

Difficulty honesty: Sets A and B (scenarios 1–10) need nothing but arithmetic and the idea of a choice. Set C (11–15) needs repetition — the lesson’s §14 prepares you, Unit 05 teaches it formally. Set D (16–20) combines everything; even experienced students should attempt these before reading. ★ = think · ★★ = sweat a little · ★★★ = sleep on it.


What’s in the module

Piece What you do Time
📖 The Lesson all 20 concepts — computational problems, decomposition, IPO, requirements/assumptions/constraints, algorithms, pseudocode, flowcharts, decisions, repetition, dry runs, trace tables, test cases, edge cases, classic mistakes, translation to C++ — threaded through one worked example (the Cafeteria Bill) 60–90 min
✏️ Scenarios 1–5 — Set A: First steps pure input→process→output problems; ★ 5–10 min each
✏️ Scenarios 6–10 — Set B: Decisions problems that branch: thresholds, categories, choices 10 min each
✏️ Scenarios 11–15 — Set C: Repetition problems that loop: totals, counting, tables 10–15 min each
✏️ Scenarios 16–20 — Set D: Combining everything full problems: validation, multi-step processing, trace tables 15 min each
🧪 Problem-Solving Lab 4 practical tasks + write-up + self-check 60–90 min

Suggested pace: lesson on day 1, one scenario set per day, lab on day 5 — one “pre-course week” alongside the setup checklist.


The method in one line (the whole module, compressed)

UNDERSTAND  →  DECOMPOSE  →  IPO  →  ALGORITHM  →  (pseudocode / flowchart)
   →  DRY RUN (trace table)  →  TEST PLAN  →  CODE  →  TEST  →  FIX

The lesson unpacks every arrow; the scenarios run it 20 times; the lab makes it yours.


Where this fits in the course

This module Later
thinking in IPO and steps Unit 01–03: variables, types, input/output — the machinery of I, P, O
decisions on paper (§13) Unit 04: if/else/switch in C++
repetition on paper (§14) Unit 05–06: while/for in C++
dry runs and trace tables (§15–16) a habit used in every unit to Unit 16
test cases and edge cases (§17–18) every lab’s “self-check” section

Finish the lab, and continue to Unit 01 · Lesson 1 — now knowing exactly why the course insists on predict before you run.


← Course home · Lesson · Scenarios A · B · C · D · Lab