Set A — First Steps (Scenarios 1–5)

★ difficulty · 5–10 min honest attempt each · ← Module home

These five are pure IPO: information in, a small chain of computations, answers out. No decisions, no loops — just the discipline. Every scenario has the same ten fields; everything from Thinking questions onward is inside the collapsed solution, so do your attempt first (protocol refresher: here).

Read every scenario as: statement → (your turn) → expected I/O → constraints/assumptions → then open and compare.

C++ you’ll meet here (all taught properly in Units 01–03): int variables for whole numbers, std::cin >> to read, std::cout << to print, * + - for arithmetic, / and % for divide and remainder.


Scenario 1 ★ — The rectangular garden bed

Problem statement. A school is building a rectangular vegetable bed. Given its length and width in metres, the gardener wants to know the perimeter (for the wooden border) and the area (for ordering soil).

Expected input. Two whole numbers on separate lines: length, width (metres).

Expected output.

Perimeter: 14 m
Area:      12 m^2

(for length 5, width 2 — wait, check this during your attempt!)

Constraints & assumptions. Both values are positive whole numbers ≤ 1000. No validation required — the gardener types carefully.

Thinking questions (answer before opening):

  1. What are I, P, O here — in one line each?
  2. How many output numbers are there? What unit does each carry?
  3. What arithmetic turns (length, width) into perimeter? Into area?
  4. If the gardener measures 5 m by 2 m, what should the output be? Write both numbers down.
Open: thinking questions answered, approach, pseudocode, solution

Thinking questions — answered.

  1. I: length, width. P: two formulas. O: perimeter, area.
  2. Two outputs. Perimeter is in metres (a length); area is in square metres (an area). Units are part of the output — printing “12” for soil-ordering purposes is ambiguous; “12 m²” is an answer.
  3. Perimeter = 2 × (length + width). Area = length × width.
  4. Perimeter = 2 × (5 + 2) = 14 m; area = 5 × 2 = 10 m² — the sample output above deliberately said 12 m² to make the point: verify every worked number yourself. Your paper calculation outranks the page.

Suggested approach. Straight-line IPO: read two values, compute two results, print with units. No pattern beyond sequence.

Pseudocode.

READ length
READ width
perimeter ← 2 × (length + width)
area      ← length × width
PRINT "Perimeter: ", perimeter, " m"
PRINT "Area:      ", area, " m^2"

Solution explanation. Two independent formulas off the same inputs — the decomposition is three steps wide, each instant. The only design decisions are the parentheses (perimeter needs them: without, `2 × length

  • width` would be a different, wrong number — precedence) and printing units with the numbers.

C++ solution.

// s01_garden.cpp — Set A · Scenario 1
// Compile: g++ -std=c++17 -Wall -Wextra s01_garden.cpp -o s01

#include <iostream>

int main() {
    int length = 0;
    int width  = 0;

    std::cout << "Length (m): ";
    std::cin  >> length;
    std::cout << "Width (m): ";
    std::cin  >> width;

    int perimeter = 2 * (length + width);
    int area      = length * width;

    std::cout << "Perimeter: " << perimeter << " m\n";
    std::cout << "Area:      " << area << " m^2\n";
    return 0;
}

Test cases.

Input Expected output
5, 2 Perimeter 14 m · Area 10 m²
1, 1 Perimeter 4 m · Area 1 m²
10, 3 Perimeter 26 m · Area 30 m²

Edge cases. The smallest legal garden: 1 × 1 (perimeter 4, area 1) — if your formula prints 2 or 0, parentheses or the formula are wrong. A square (7 × 7) is legal and must work like any rectangle. Length 1000, width 1: perimeter 2002, area 1000 — the largest area at the constraint’s edge. (0 × anything is excluded by the assumptions — see the assumption discipline in the lesson §7.)


Scenario 2 ★ — Movie night time

Problem statement. A film club stores durations in total minutes. For the schedule poster they need it human-readable: given a movie’s length in minutes, print hours and leftover minutes (e.g. 137 minutes is “2 h 17 min”).

Expected input. One whole number: total minutes (0 … 600).

Expected output.

137 minutes = 2 h 17 min

Constraints & assumptions. Input is a whole number 0–600. Output uses “h” and “min” exactly as shown.

Thinking questions:

  1. Which arithmetic operation “extracts” the hours from 137? Which extracts the leftovers?
  2. Try it on paper: 137 ÷ 60 = …? and the remainder is …?
  3. What should happen for 60 exactly? For 59? For 0?
Open: approach, pseudocode, solution

Thinking questions — answered.

  1. Division gives hours (how many whole 60s fit); remainder gives the leftover minutes. In C++: / on whole numbers and % (the remainder operator).
  2. 137 ÷ 60 = 2 remainder 17 → 2 h 17 min. ✓
  3. 60 → “1 h 0 min” (remainder 0 is fine). 59 → “0 h 59 min” (0 hours is fine — don’t “fix” it, the format handles it). 0 → “0 h 0 min” — legal at the constraint edge.

Suggested approach. The decompose-a-quantity pattern: divide by the unit size for the big piece, remainder for the rest. (This exact pattern returns as money-change, digit extraction, and h:m:s in Set A #3.)

Pseudocode.

READ totalMinutes
hours    ← totalMinutes ÷ 60        (whole-number division)
leftover ← totalMinutes % 60        (remainder)
PRINT totalMinutes, " minutes = ", hours, " h ", leftover, " min"

Solution explanation. Two computations, both derived from the same input — / and % are a matched pair: for whole numbers, (a ÷ b) × b + a % b always rebuilds a. Check it: 2 × 60 + 17 = 137. ✓ That identity is your built-in correctness check for every divide-and- remainder problem this course poses.

C++ solution.

// s02_movie.cpp — Set A · Scenario 2
// Compile: g++ -std=c++17 -Wall -Wextra s02_movie.cpp -o s02

#include <iostream>

int main() {
    int totalMinutes = 0;
    std::cout << "Total minutes: ";
    std::cin  >> totalMinutes;

    int hours    = totalMinutes / 60;   // whole hours
    int leftover = totalMinutes % 60;   // remaining minutes

    std::cout << totalMinutes << " minutes = "
              << hours << " h " << leftover << " min\n";
    return 0;
}

Test cases.

Input Expected
137 2 h 17 min
60 1 h 0 min
59 0 h 59 min
90 1 h 30 min

Edge cases. 0 (the minimum — prints 0 h 0 min), 600 (the maximum — 10 h 0 min), 61 and 119 (the “just over” values people get wrong when they round instead of using remainder: 1 h 1 min, 1 h 59 min).


Scenario 3 ★ — The long drive

Problem statement. A trip tracker records a journey in total seconds. Print it as hours, minutes, seconds — e.g. 7385 seconds is “2 h 3 m 5 s”.

Expected input. One whole number: total seconds (0 … 86400).

Expected output.

7385 seconds = 2 h 3 m 5 s

Constraints & assumptions. Whole number 0–86400 (one day is 86400 s). Hours, minutes, seconds are each printed as plain whole numbers.

Thinking questions:

  1. Can you reuse Scenario 2’s idea? What is the “unit size” now — 60? 3600? Both?
  2. Plan the order: to get hours first, what do you divide by? What is left after taking out the hours?
  3. Dry-run your plan on 7385 before opening.
Open: approach, pseudocode, solution

Thinking questions — answered.

  1. Yes — this is Scenario 2 applied twice, because 1 h = 3600 s and the remainder then still contains minutes.
  2. hours = total ÷ 3600. The remainder (total % 3600) is the not-yet-full hour: minutes = remainder ÷ 60, seconds = remainder % 60.
  3. Dry run: 7385 ÷ 3600 = 2 (7200 used), remainder 185; 185 ÷ 60 = 3 (180 used), remainder 5 → 2 h 3 m 5 s. ✓

Suggested approach. Cascade decomposition: peel the biggest unit, then re-process the remainder with the next unit. One variable (remaining) that shrinks is easier to keep honest than three ad-hoc expressions.

Pseudocode.

READ total
hours     ← total ÷ 3600
remaining ← total % 3600
minutes   ← remaining ÷ 60
seconds   ← remaining % 60
PRINT total, " seconds = ", hours, " h ", minutes, " m ", seconds, " s"

Solution explanation. Four stored values, each one step — no nested expressions, so the trace table stays trivial and the code reads like the pseudocode. The identity check again: 2×3600 + 3×60 + 5 = 7385. ✓ Notice how the design (peel biggest unit first) made the code structure obvious — that’s §19-mistake-7 avoidance: the thinking shaped the code, not vice versa.

C++ solution.

// s03_drive.cpp — Set A · Scenario 3
// Compile: g++ -std=c++17 -Wall -Wextra s03_drive.cpp -o s03

#include <iostream>

int main() {
    int total = 0;
    std::cout << "Total seconds: ";
    std::cin  >> total;

    int hours     = total / 3600;
    int remaining = total % 3600;
    int minutes   = remaining / 60;
    int seconds   = remaining % 60;

    std::cout << total << " seconds = "
              << hours << " h " << minutes << " m " << seconds << " s\n";
    return 0;
}

Test cases.

Input Expected
7385 2 h 3 m 5 s
3600 1 h 0 m 0 s
3661 1 h 1 m 1 s
60 0 h 1 m 0 s

Edge cases. 0 (all zeros), 86400 (exactly one day → 24 h 0 m 0 s), 3599 (one second shy of an hour → 0 h 59 m 59 s — the classic near- boundary value), 86399 (23 h 59 m 59 s).


Scenario 4 ★ — The class party budget

Problem statement. Your class raises money with a bake sale: cakes at 120 rupees, cupcakes at 40, juice boxes at 25. Given how many of each were sold, print each item’s earnings and the grand total.

Expected input. Three whole numbers: cakes, cupcakes, juice boxes.

Expected output.

Cakes    x 4 : 480
Cupcakes x 6 : 240
Juice    x 3 :  75
----------------
GRAND TOTAL  : 795

Constraints & assumptions. Counts are whole numbers ≥ 0. Prices are fixed constants (they don’t change mid-run). Output format should line the totals column up.

Thinking questions:

  1. How many named values will your solution keep track of? List them — inputs, computed, outputs.
  2. Which values are inputs and which are computed? (Never recompute a value you already have.)
  3. 4 cakes, 6 cupcakes, 3 juice: what should the output be? Compute it — this becomes a test case.
Open: approach, pseudocode, solution

Thinking questions — answered.

  1. Eight: three inputs (cakes, cupcakes, juice), three computed (cakeSales, cupcakeSales, juiceSales), one derived (grandTotal), plus the three price constants if you name them (recommended!). Naming things on paper first is the cheapest design review there is.
  2. Inputs: the three counts. Computed: each item’s sales; then the total from the computed values (not recomputed from scratch — one source of truth per value).
  3. 4×120 = 480, 6×40 = 240, 3×25 = 75 → total 795. ✓ (matches the sample — this one wasn’t lying)

Suggested approach. Straight-line with named constants: write PRICE_CAKES = 120 once, use it in the formula. If the price changes next month, one line changes. (In C++ this becomes const int — Unit 02.)

Pseudocode.

PRICE_CAKES    ← 120
PRICE_CUPCAKES ← 40
PRICE_JUICE    ← 25

READ cakes, cupcakes, juice

cakeSales    ← cakes    × PRICE_CAKES
cupcakeSales ← cupcakes × PRICE_CUPCAKES
juiceSales   ← juice    × PRICE_JUICE
grandTotal   ← cakeSales + cupcakeSales + juiceSales

PRINT item lines with sales
PRINT "GRAND TOTAL  : ", grandTotal

Solution explanation. The lesson’s cafeteria example with one more item and no decision — deliberately, so you notice the pattern is the same: read → per-item computation → sum → print. The design wins here are naming (each value has one obvious name) and constants (prices live in one place). Alignment in the output is cosmetic iteration — get the numbers right first, tidy spacing after.

C++ solution.

// s04_bakesale.cpp — Set A · Scenario 4
// Compile: g++ -std=c++17 -Wall -Wextra s04_bakesale.cpp -o s04

#include <iostream>

int main() {
    const int PRICE_CAKES    = 120;   // named constants: prices in ONE place
    const int PRICE_CUPCAKES = 40;
    const int PRICE_JUICE    = 25;

    int cakes = 0, cupcakes = 0, juice = 0;
    std::cout << "Cakes sold: ";
    std::cin  >> cakes;
    std::cout << "Cupcakes sold: ";
    std::cin  >> cupcakes;
    std::cout << "Juice boxes sold: ";
    std::cin  >> juice;

    int cakeSales    = cakes    * PRICE_CAKES;
    int cupcakeSales = cupcakes * PRICE_CUPCAKES;
    int juiceSales   = juice    * PRICE_JUICE;
    int grandTotal   = cakeSales + cupcakeSales + juiceSales;

    std::cout << "Cakes    x " << cakes    << " : " << cakeSales    << "\n";
    std::cout << "Cupcakes x " << cupcakes << " : " << cupcakeSales << "\n";
    std::cout << "Juice    x " << juice    << " : " << juiceSales   << "\n";
    std::cout << "----------------\n";
    std::cout << "GRAND TOTAL  : " << grandTotal << "\n";
    return 0;
}

Test cases.

Input Expected total
4, 6, 3 795
0, 0, 0 0
1, 0, 0 120

Edge cases. All zeros (total 0 — the legal minimum under our assumptions), single item sold of each kind (120 / 40 / 25 lines), large counts (999 of each: 119880 + 39960 + 24975 = 184815 — check it by hand, the point is your program agrees with your arithmetic).


Scenario 5 ★ — Fuel for the trip

Problem statement. A van rental includes fuel planning. Given the distance of a trip in km and the price of petrol per litre, print: the fuel needed (the van does exactly 15 km per litre — whole litres; round up to the next whole litre) and the fuel cost.

Expected input. Two whole numbers: distance in km, price per litre in rupees.

Expected output.

Distance      : 320 km
Fuel needed   : 22 litres   (rounded up)
Cost at 275 Rs/l : 6050 Rs

Constraints & assumptions. Distance 1–2000 km; price 100–500 Rs. “Rounded up” is a requirement: 21.33 litres must be planned as 22 — you can’t buy a third of a litre. Assume the input numbers are valid (no validation required yet — Set D, Scenario 19 adds it).

Thinking questions:

  1. Fuel needed = distance ÷ 15 — but rounded up. What does plain whole- number division give for 320 ÷ 15 (21.33…)? How do you turn “21” into the required “22” — without decimals?
  2. When does “round up” change nothing? (What must be true of distance for the fuel to be exact?)
  3. Which values feed which? Does cost depend on fuel — or on distance?
Open: approach, pseudocode, solution

Thinking questions — answered.

  1. Plain / gives 21 — the floor. A cheap whole-number ceiling trick: (distance + 14) / 15 — adding “one less than the divisor” pushes any remainder over the line: (320+14)/15 = 334/15 = 22. And when distance is an exact multiple, the addition doesn’t overflow the division: (300+14)/15 = 314/15 = 20 — still 20. ✓
  2. Exactly when distance is a multiple of 15 — the trick is idempotent there. Verify with 300 and 450 in your tests (see below).
  3. Cost = fuelNeeded × pricePerLitre — it depends on the computed fuel, not directly on distance. Two-stage processing: the output of stage 1 is an input to stage 2. Forgetting this dependency is how people compute cost from raw distance and get subtly wrong totals.

Suggested approach. Straight-line, two stages, with the ceiling trick written as its own named step (and a comment!) because it is the clever bit — isolating it makes it checkable.

Pseudocode.

READ distance, pricePerLitre

fuelNeeded ← (distance + 14) ÷ 15       (whole-number ceiling: round up)
fuelCost   ← fuelNeeded × pricePerLitre

PRINT distance, fuelNeeded, pricePerLitre, fuelCost

Solution explanation. The one non-obvious line is the ceiling: why +14? Because 14 = 15 − 1: if there is any remainder at all, adding 14 crosses into the next multiple; if there is none, the sum still divides cleanly one short of doubling. Try the two probe values from the thinking questions on paper until you believe it — a trick you can’t explain is a bug you haven’t met yet. (Alternative honest designs exist: e.g. fuelNeeded = distance / 15; if (distance % 15 != 0) fuelNeeded = fuelNeeded + 1; — same result, more verbose, zero cleverness. Either is fine; the second preview’s Unit 04’s if.)

C++ solution.

// s05_fuel.cpp — Set A · Scenario 5
// Compile: g++ -std=c++17 -Wall -Wextra s05_fuel.cpp -o s05

#include <iostream>

int main() {
    int distance = 0;
    int pricePerLitre = 0;

    std::cout << "Distance (km): ";
    std::cin  >> distance;
    std::cout << "Price per litre (Rs): ";
    std::cin  >> pricePerLitre;

    int fuelNeeded = (distance + 14) / 15;   // round UP to whole litres
    int fuelCost   = fuelNeeded * pricePerLitre;

    std::cout << "Distance      : " << distance << " km\n";
    std::cout << "Fuel needed   : " << fuelNeeded << " litres (rounded up)\n";
    std::cout << "Cost at " << pricePerLitre << " Rs/l : " << fuelCost << " Rs\n";
    return 0;
}

Test cases.

Input Expected
320, 275 22 litres · 6050 Rs
300, 275 20 litres · 5500 Rs (exact multiple — no extra litre)
15, 100 1 litre · 100 Rs
1, 500 1 litre · 500 Rs

Edge cases. Distance 1 (minimum → 1 litre — even a tiny trip needs fuel), distance 15 and 300 (exact multiples: the ceiling must not add a litre), distance 2000 (maximum: 2000 ÷ 15 = 133.33 → ceiling 134 litres — verify (2000 + 14) ÷ 15 = 134 on paper), distance 16 (the smallest value that does round up: 2 litres).


← Module home · Set B — Decisions →