Files Exercises (18)
← Module home · ★ = first pass · ★★ = needs the toolkit · ★★★ = combines ideas
How to use this page. Attempt 15 minutes before opening any solution. The file habit: write the file’s first two lines by hand before writing code — the format is the contract. Exercises marked ✍ create files: inspect the produced file in an editor afterward, every time.
Part A — Streams, open, close (★, E1–E7)
E1. Write the three-line “hello file”: create hello.txt containing your name and today’s date (as text). ✍ Then open it in an editor and confirm. What are the two failure modes of this program (one at open, one you avoid by closing)?
E2. The missing-file experiment: write a program that reads does-not-exist.txt (a) without the open check (b) with it. Describe both behaviours — what prints, what doesn’t — and state which failure mode is more dangerous in a real program, and why.
E3. The erasure experiment, done deliberately: (a) write notes.txt with two lines. (b) Open it again with a plain ofstream and write one new line. ✍ (c) Inspect. What happened to the two original lines? Then repeat step (b) with std::ios::app and inspect again. State the mode contract in one sentence each.
E4. The numbered-copy: read any text file line by line and write a copy with line numbers (1: ...). Both files stream through your program at once — one ifstream, one ofstream, open checks on both. ✍ Test with a 3-line file and an empty file (0 lines out — why?).
E5. The stream-as-condition drill: without running it, state how many loop iterations each runs for a file containing exactly 10\n20\n30\n and why:
(a) while (in >> x) (b) while (!in.eof()) { in >> x; ... } (c) while (in >> x, !in.eof()) — the comma operator one is the worst of the three; say what it loses.
E6. A program must add a timestamped line to events.log each run. Write it (timestamp = a fixed string like "2026-09-23 T3" is fine). ✍ Run it three times, inspect, and confirm all three lines. Which mode flag made this work?
E7. Explain, in two sentences each, what .close() does and why the course closes explicitly even though streams auto-close on scope exit. Then: why would a long-running program that writes one critical record per transaction close (or flush) more often?
Part B — Reading strategies and formats (★★, E8–E13)
E8. Line vs formatted: given data1.txt = Ali\nAyesha Khan\nSana\n — which strategy reads these three names correctly, >> or getline, and what exactly does >> produce instead? (This is D4’s seed — state the rule that decides.)
E9. Formatted records: points.txt contains 3 4\n5 6\n7 8\n. Write the loop that reads and prints each pair as (3, 4) — and then explain why the same loop reads 3 4 5 6 7 8 (one line) identically. What does that imply about >>-formats and “lines”?
E10. The mixing fix: input.txt is 92\nAyesha Khan\n78\nAli Raza\n (score, then full name, per record). Write the read loop with the ignore rhythm, printing Ayesha Khan scored 92. Then delete the ignore — one word changes; state the new (broken) output precisely.
E11. CSV writing and reading: write students.csv with a header name,score,programme and three records; then write the reader that skips the header and prints each record’s fields on one line. ✍ Inspect the file: exactly where are the commas? What decides “is line 1 data?” — and why must writer and reader agree?
E12. CSV split, by hand: given the line "Sana Mir,85,BSDS", trace the find/substr calls that extract the three fields — write each intermediate value (p1, p2, each substr argument and result). Then: what breaks if a field contains a comma, and what is this course’s documented answer?
E13. The count-first header: write saveItems/loadItems for struct Item { std::string name; int qty; }; with the count-first format. Include: the capacity clamp, the ignore rhythm (where does it appear twice?), and the missing-file contract for the loader. ✍ Round-trip a 3-item array.
Part C — Errors, records, integration (★★–★★★, E14–E18)
E14. The gallery drill: for each, name the mistake (M1–M10) and its one-line prevention:
(a) a log file that’s empty after the second run (b) a report whose last record prints twice (c) "Ayesha Khan" loaded as "Ayesha" with score 0 (d) a corrupted count of 99999 overflowing the roster array.
E15. The state-flag drill: after each sequence, state which flags are set (eof/fail/neither) and what one more in >> x would do:
(a) file 10\n20\n, read 10 then 20 (b) file 10\nabc\n, read 10 then attempt 20 from abc (c) an empty file, one >> attempt.
E16. Write bool fileExists(const char* filename) using only what the course teaches (open + check + close — no filesystem library). What are its two false verdicts — when does it say “yes” for something unusable, or “no” for something you can create?
E17. The tail reader: print the last 3 lines of a file. (You can’t seek backwards with course tools — so: read all lines into an array of strings — capacity-guarded — then print the last three. Or the clever version: a 3-line rolling buffer. Attempt both.) ✍
E18. Capstone drill: a program that (a) appends one expense to expenses.txt in the format description;amount (semicolon-separated — why semicolon and not comma here?), (b) then loads the whole file and prints all expenses with a running total. Open checks everywhere, format documented in comments at both ends. ✍ This is Lab 2’s seed — do it small here.
Solutions (S1–S18)
S1 — Hello file
std::ofstream out("hello.txt");
if (!out.is_open()) { std::cout << "open failed\n"; return 1; }
out << "Ayesha Khan\n2026-09-23\n";
out.close();
Failure modes: open can fail (permissions/path — caught by the check); and without close() the buffered tail could be lost on an abnormal exit — close flushes. (On normal exits the destructor flushes; the habit exists for the abnormal ones and for clarity.)
S2 — The missing-file experiment
(a) Without the check: no crash, no output, no error — every read silently fails; an “empty report” bug that’s actually a never-opened file. (b) With it: your message prints and the program exits gracefully. The checked version is safer because the silence is broken — silent wrongness beats loud failure only at sounding louder, and here loud is what you want.
S3 — The erasure experiment
(a) two lines. (b→c) after the plain ofstream open: both original lines gone — one new line remains (the truncate default). With std::ios::app: three lines — the new one appended. Contract: plain ofstream = replace (fresh start); app = add to the end (history survives).
S4 — Numbered copy
std::ifstream in("in.txt");
std::ofstream out("out.txt");
if (!in.is_open() || !out.is_open()) { std::cout << "open failed\n"; return 1; }
std::string line; int n = 1;
while (std::getline(in, line)) out << n++ << ": " << line << '\n';
Empty file → zero iterations → out.txt exists and is empty: correct, since “0 lines” is the honest copy. (n++ post-increment: prints 1 first, then increments.)
S5 — Stream-as-condition drill
File 10\n20\n30\n: (a) 3 iterations — >> succeeds on 10, 20, 30, fails on the 4th attempt. (b) 4 bodies run — after reading 30, eof() is still false (no attempt past the end yet), so a 4th body runs, in >> x fails, and the stale x (= 30) gets processed again: the phantom record. (c) the comma version reads then checks eof — it also processes the stale value on the last pass, and it can drop a record whose read succeeds but lands exactly at EOF (eof set, body skipped even though x was just read). The read-in-condition idiom (a) is the only one that processes exactly the data that exists.
S6 — The event log
std::ofstream log("events.log", std::ios::app);
if (!log.is_open()) { std::cout << "open failed\n"; return 1; }
log << "2026-09-23 T3 session started\n";
log.close();
std::ios::app — each run’s write lands at the (growing) end; nothing is erased.
S7 — close()
close() disconnects the stream and flushes the buffer — file streams collect characters in memory and write to disk in batches; close pushes the remainder. The course closes explicitly because (1) it states “the file is complete” at a readable point in the code, (2) it protects buffered tail data against abnormal exits, and (3) it releases the file for other programs. A long-running transactional program closes (or flushes) per record because a crash must not lose already-confirmed data.
S8 — Line vs formatted
>> reads "Ali", "Ayesha", "Sana" — it stops at the first space, so "Ayesha Khan" truncates and the word Khan is then read as the next name (or worse, mismatches the next field). getline reads each full line — correct. The rule: a field that can contain spaces forces line-based reading (Lesson 2 §2).
S9 — Formatted records
double x, y;
while (in >> x >> y) std::cout << '(' << x << ", " << y << ")\n";
Identical on both files because >> skips all whitespace — newlines are just whitespace to it. Implication: >>-formats live in the sequence of values, not in line layout — you can’t rely on line breaks to delimit records unless the format says so explicitly (which is exactly why line-based formats exist).
S10 — The mixing fix
int score; std::string name;
while (in >> score) {
in.ignore(1000, '\n');
std::getline(in, name);
std::cout << name << " scored " << score << '\n';
}
Without the ignore: score=92 reads, then getline consumes the leftover newline → name = "" → prints " scored 92"; the real name line Ayesha Khan becomes the next >> target… which fails (not a number), ending the loop early. One missing word = half the file silently lost.
S11 — CSV round trip
std::ofstream out("students.csv");
out << "name,score,programme\n";
out << "Ayesha Khan,92,BSCS\n" << "Ali Raza,78,BSIT\n" << "Sana Mir,85,BSDS\n";
out.close();
std::ifstream in("students.csv");
std::string line;
std::getline(in, line); // skip the header — by agreement
while (std::getline(in, line)) std::cout << line << '\n'; // (parsing in E12)
Commas sit exactly between fields — the writer’s separators are the reader’s delimiters. “Is line 1 data?” is decided by convention (header or not) that both ends must honour; nothing in the file format marks a header. That’s why the agreement is documentation, not accident.
S12 — CSV split, by hand
Line = Sana Mir,85,BSDS:
p1 = line.find(',')→ 9 (afterSana Mir)p2 = line.find(',', 10)→ 12name = line.substr(0, 9)→"Sana Mir"score = stoi(line.substr(10, 12 - 10 - 1))→stoi("85")→ 85prog = line.substr(13)→"BSDS"
A comma inside a field shifts every subsequent find — "Khan, Ali,92,BSIT" splits into four fields. Course answer: fields never contain commas — a documented constraint of the format (real-world CSV’s quoted-fields answer is noted in C7).
S13 — Count-first items
// FORMAT (contract — keep beside BOTH functions):
// line 1: <n>
// then n records: <name>\n<qty>\n
void saveItems(const Item items[], int n, const char* filename) {
std::ofstream out(filename);
if (!out.is_open()) return;
out << n << '\n';
for (int i = 0; i < n; i = i + 1)
out << items[i].name << '\n' << items[i].qty << '\n';
}
int loadItems(Item items[], int cap, const char* filename) {
std::ifstream in(filename);
if (!in.is_open()) return 0; // missing = empty, by contract
int n = 0;
in >> n; in.ignore(1000, '\n'); // ignore #1 (after the count)
if (n > cap) n = cap; // clamp — trust up to the guard
for (int i = 0; i < n; i = i + 1) {
std::getline(in, items[i].name);
in >> items[i].qty;
in.ignore(1000, '\n'); // ignore #2..n+1 (after each qty)
}
return n;
}
The ignore appears after the count and after every qty — every >>-before-getline seam.
S14 — Gallery drill
(a) M3 — no append mode; open with std::ios::app. (b) M2 — the eof() loop’s phantom record; read in the condition. (c) M4 — missing ignore (with M8’s truncation as the mechanism >> provides); ignore(1000, '\n') at every seam. (d) M6 — trusting the file’s count; clamp to capacity.
S15 — State-flag drill
(a) eof set (the read of 20 consumed the final bytes; attempting again trips it — precisely: after reading 20, eofbit may not be set until another attempt; the next in >> x attempts, fails, sets eof/fail, x unchanged). (b) failbit set at the abc read — and the next in >> x does nothing (stream is failed; all reads no-op until cleared). (c) fail + eof on the first attempt — nothing was ever there. Practical rule: after any failed read, the stream stays failed — check the read’s result at the boundary, don’t read on.
S16 — fileExists
bool fileExists(const char* filename) {
std::ifstream in(filename);
return in.is_open();
}
False “yes”: opens a directory or an unreadable-permission file (is_open may succeed where reading won’t). False “no”: reports false for a file that doesn’t exist yet but could be created by an ofstream — existence and writability are different questions. (In practice: check by attempting the real operation you wanted — the labs do exactly that.)
S17 — The tail reader
std::string lines[1000];
int n = 0;
std::string line;
std::ifstream in("log.txt");
if (!in.is_open()) { std::cout << "open failed\n"; return 1; }
while (n < 1000 && std::getline(in, line)) lines[n++] = line; // read all, guarded
int start = (n >= 3) ? n - 3 : 0;
for (int i = start; i < n; i = i + 1) std::cout << lines[i] << '\n';
Rolling-buffer version: keep a std::string ring[3] and ring[n % 3] = line; n++ — after the loop, print indices ((n-3+k) % 3 + 3) % 3 for k = 0..2 — memory stays 3 lines forever (the classic log-tail trick; try it as the extension).
S18 — Expense capstone drill
// FORMAT (contract): each line: <description>;<amount>\n (append-only file)
// Semicolon, not comma: descriptions may contain commas ("lunch, taxi, tips")
// and our course format forbids separators inside fields — ';' can't appear in a price.
void addExpense(const char* filename, const std::string& desc, double amount) {
std::ofstream out(filename, std::ios::app); // append: history survives
if (!out.is_open()) { std::cout << "open failed\n"; return; }
out << desc << ';' << amount << '\n'; // every write ends with its separator
out.close();
}
double printAll(const char* filename) {
std::ifstream in(filename);
if (!in.is_open()) { std::cout << "(no expenses yet)\n"; return 0.0; } // missing = empty
std::string line; double total = 0.0;
while (std::getline(in, line)) {
std::size_t p = line.find(';');
if (p == std::string::npos) { std::cout << "malformed: " << line << '\n'; continue; }
double amt = std::stod(line.substr(p + 1));
std::cout << line.substr(0, p) << " : " << amt << '\n';
total += amt;
}
return total;
}
Semicolon rationale: the data may contain commas but never semicolons — the separator must be a character the data can’t produce (the same reasoning as the sentinel rule). Round trip: append N lines, load N lines, total = Σ — the labs scale this to records.