Glossary
Terms are defined as used in this course. First-taught lecture noted where a term anchors to a specific case sequence.
Abstraction — Deliberately ignoring details that do not matter for the current problem (e.g., treating "a student record" as just two numbers). First taught in Lecture 01.
Algorithm — A finite sequence of unambiguous steps that transforms an input into an output.
Assignment — Storing a value in a named variable (x = 3).
Assumption — A condition you are allowed to rely on (stated in each case's metadata) that you need not check in code.
Big-O category — The growth class of a running time as input grows, e.g. constant, logarithmic, linear, linearithmic, quadratic, exponential. Taught from Lecture 17.
Binary search — Search on sorted data that halves the search range each step. Lecture 21.
Boolean expression — An expression that is true or false; drives if and while decisions.
Boundary case — An input at the edge of the constraints (smallest, largest, first, last, empty). Central to Lecture 08.
Brute force — Trying all possibilities without cleverness; the baseline every other strategy must beat. Lecture 20.
Case study — A short, self-contained problem used in the five-minute cycle. This course contains 144 of them (cs-001 … cs-144).
Complexity class — See Big-O category.
Constraint — A limit on inputs or resources that any valid solution must respect.
Contradiction (proof by) — Assuming the opposite of what you want and deriving an impossibility; used in Lecture 26 and later.
Decomposition — Splitting a problem into smaller sub-problems you can solve separately. Lecture 01.
Dictionary — Python's key→value map (counts[key]); used for frequency counting. Lecture 13.
Dynamic programming — Solving a problem by combining stored solutions of smaller sub-problems in a defined order. Lecture 23.
Edge case — An input outside the typical pattern where naive solutions break (empty, single element, duplicates, extremes).
Enrichment — Optional material (tagged in lecture plans) beyond the mandatory core sequence.
Flowchart — A diagram of an algorithm using standard shapes for processes, decisions, and input/output. Lecture 03.
Frequency counting — Tallying how often each value occurs, usually with a dictionary. Lecture 13.
Function — A named, reusable block of code with inputs (parameters) and an output (return). Lecture 14.
Greedy strategy — Making the locally best choice at each step and keeping it; requires an argument that local choices are safe. Lecture 22.
Heuristic — A rule of thumb that is fast and often good, without a guarantee; distinguished from an exact method in Lecture 31.
Invariant — A statement that stays true at every step of a loop; the standard way to argue a loop is correct. Lecture 19.
Linear scan — Checking items one by one; the default search when data is unsorted. Lecture 17.
Loop — Repeating steps: for over a sequence, while under a condition.
Loop invariant — See Invariant.
Model (mathematical) — A translation of a word problem into numbers, symbols, and relations. Lecture 05 onward.
Modulo (%) — Remainder after division; the workhorse of cycles, grouping, and parity checks. Lecture 05.
Monotonic — Only ever increasing or only ever decreasing; the property binary search needs. Lecture 21.
Off-by-one error — A boundary mistake in a loop or index (one too few or one too many steps). Lecture 06.
Pseudocode — Structured plain language that describes an algorithm precisely without syntax of a real language. Lecture 02.
Recursion — A function calling itself on a smaller input, with a base case. Lecture 22.
Running total — A variable that accumulates a result across loop iterations. Lecture 09.
Set — A collection of distinct items; used for membership and duplicate questions. Lecture 13.
Simulation — Answering a question by mimicking the process step by step under a model. Lecture 30.
Slicing — Extracting a part of a sequence, e.g. s[1:4]. Lecture 11.
State (program state) — The complete snapshot of all variables at one moment; what a trace table records. Lecture 06.
Strategy — A general plan for attacking unfamiliar problems (decompose, invariants, greedy, DP, simulation, heuristics). Lectures 31–32.
String — A sequence of characters; supports indexing and slicing. Lecture 10.
Test case — A named input with its expected output and the reason it was chosen. Lecture 08.
Trace table — A table of variable values after each step/iteration, used to predict and verify behaviour. Lecture 06.
Type — The kind of a value (int, float, string, bool, list, dict, set). Type mismatches are a top-three bug source in this course.
Walking pointer — An index that moves through data (e.g. two pointers moving toward each other). Lecture 18.