FAQ

For students

Do I need programming experience? No. The course assumes none. Weeks 1–3 deliberately use pseudocode and flowcharts before Python appears in Lecture 04. Students who already program should attempt the case extensions instead of finishing early.

I'm in semester 1 — will Advanced and Expert cases count against me? No. Only core cases and the graded components count. Advanced/Expert cases are discussion targets: the class reasons together, and the instructor's reveal does the heavy lifting. You are expected to follow the reasoning, not reproduce it in week 2.

Why pseudocode first? Because the course grades reasoning, not syntax. Pseudocode lets you show the algorithm before you fight a language. From Block III you may go straight to Python, but every discussion still asks why it works.

What if I can't solve a case in five minutes? That is normal — most students can't solve most cases at first. Write what you would try: a diagram, a smaller example, a question. That is a serious attempt and earns full participation credit.

Is Python the only language? Examples and solutions are Python because it is the CS and DS teaching standard here. If your programme uses another language in parallel courses, you may still submit pseudocode or flowcharts for participation.

How much work outside class? About 30 minutes per lecture of optional but strongly recommended practice (re-solving one case), plus assignments, labs, and the project.

Where are the solutions? With your instructor. Public pages show student-facing problem statements only; publishing solutions would defeat the attempt-first method.

For instructors

Can I show the instructor page on the projector by mistake? Guard against it: keep student and instructor tabs in different windows and close the instructor window during the attempt phase. The instructor page title names the approach, which spoils the discussion.

The class solves everything instantly — what now? Release the Extensions, then move to the next lecture's first case. Every student page carries optional extensions sized for this situation.

The class solves nothing — what now? Check you are not skipping the What to notice observation question; it gives every student a foothold. Then use the instructor page as a worked mini-lecture and continue. Discussion-target cases are designed for this.

Can I reorder lectures or cases? Within a block, yes — cases are tagged with the lectures that reference them, and the validator checks those references. Across blocks, no: the course builds deliberately (e.g., recursion in Lecture 22 needs invariants from 19).

Can I publish a modified student site for my section? Yes. Build with scripts/build_site.py — instructor material is excluded at build time and the build fails if it detects any solution file in the output. Never deploy public_instructor/ anywhere public.

How do I add my own cases? Follow CONTRIBUTING: a student file and an instructor file sharing one ID and slug, difficulty and lecture metadata, and regenerate the catalog. The validator will catch mismatches.

Is this enough for a full semester of a 2-2 schedule? Yes: 32 meetings of 2 hours. For 3-credit variants, use the adaptation notes in the Instructor Guide.

Technical

Why a static site with no framework? Plain HTML generated from Markdown is readable forever, needs no toolchain for readers, and keeps the GitHub Pages deployment a single workflow with no dependencies to break.

What exactly does the validator check? Required files, case ID uniqueness and pairing, difficulty and lecture reference validity, all internal links, required headings in lecture plans, and that no instructor-only material appears in student pages or the public build. See CONTRIBUTING for the list.

The build failed with a leak error — what does that mean? A file matching instructor patterns (an instructor/ path or a solution heading) reached the public output. Do not bypass it; find how the file got there. This check exists because the strongest safeguard against leaking solutions is refusing to ship them.