14 — Data Engineering¶
Data engineering: pipelines, Airflow, ETL/ELT, and data quality.
Cheat Sheets¶
| # | File | Topic |
|---|---|---|
| 1 | airflow.md | Apache Airflow — DAGs, operators, scheduling, sensors, XComs |
| 2 | etl-elt.md | ETL/ELT patterns — extraction, transformation, loading, incremental processing |
| 3 | data-pipelines.md | Pipeline design — architecture, orchestration, monitoring, testing |
Planned Cheat Sheets¶
- dbt Essentials — models, tests, materializations
- Data Warehousing — schemas, partitioning, cost control
- Stream Processing — real-time pipeline patterns
Related Categories¶
- 13-Big-Data — distributed processing
- 16-DevOps — CI/CD and deployment
Contribute¶
- Template: CHEATSHEET_TEMPLATE.md
- Guide: CONTRIBUTING.md