02 — Data Analysis¶
Tabular data manipulation and scientific computing: pandas, NumPy, Polars, SciPy, and statsmodels.
Scope¶
Cheat sheets for array computing, tabular data wrangling, scientific statistics, and statistical modeling. Visualization belongs to 03-Data-Visualization; predictive ML to 04-Machine-Learning.
Cheat Sheets¶
| Cheat Sheet | Description |
|---|---|
| numpy.md | Arrays, dtypes, broadcasting, vectorized math, random, linear algebra, performance |
| pandas.md | Series & DataFrames: I/O, cleaning, groupby, merge/join/concat, pivot/reshape, datetime, strings, categoricals |
| polars.md | Fast Rust-based DataFrames: expression API, lazy evaluation, large-file workflows |
| scipy.md | stats & hypothesis tests, optimization, sparse matrices, interpolation, signal/image processing |
| statsmodels.md | OLS/GLM/logit regression, formula API, diagnostics, ANOVA, time-series (ARIMA, ETS) |
Planned Cheat Sheets¶
- Time Series Analysis with pandas — resampling, rolling windows, feature engineering for forecasts
Contribute¶
- Template: CHEATSHEET_TEMPLATE.md
- Guide: CONTRIBUTING.md