Quiz 5 — Counting and Algorithms I (Lectures 15–18)
Time: 20 minutes · Closed book · Answer all questions.
Q1. Multiplication principle (4 marks)
A canteen menu: 3 mains, 4 drinks, 5 desserts. A "meal" is one item from each category.
(a) How many different meals? (2) (b) The dessert category is replaced by "any two different desserts". How many meals now? (2)
(b) is harder: count unordered pairs of desserts.
Q2. Not-found behaviour (4 marks)
def find(xs, target):
for i, x in enumerate(xs):
when found: return i
# implicit fall-through
(a) What does the function return when the target is absent? (2) (b) Why is a deliberate not-found result better than this fall-through? Give one concrete caller-side failure. (2)
Q3. Sort keys (5 marks)
Records are (name, marks) pairs, e.g. [("ann", 82), ("bo", 82), ("cy", 91)]. The ranking rule: higher marks first; ties broken by name, A-before-B.
(a) Write the one-line Python sort. (2) (b) Explain the role of the - sign on marks but not on name. (2) (c) Give the sorted output for the example. (1)
Q4. Two pointers (6 marks)
For a sorted list, this plan claims to find a pair summing to a target: start pointers at both ends; if the sum is too small move the left pointer right; too large, move the right pointer left; equal — found.
(a) Trace the plan on [1, 3, 4, 6, 8], target 10. List each step (sum, comparison, move). (3) (b) State the invariant that justifies the moves, in one sentence. (3)