Quiz 4 — Lists, Debugging, Dictionaries, Functions (Lectures 11–14)
Time: 20 minutes · Closed book · Answer all questions.
Q1. Aliasing (4 marks)
a = [1, 2, 3]
b = a
b.append(4)
print(a)
(a) State the output and explain the mechanism in one sentence. (2) (b) Rewrite one line so that a stays [1, 2, 3]. (2)
Q2. Dictionary reasoning (5 marks)
votes = ["ann", "bo", "ann", "cy", "bo", "ann"]
tally = {}
for v in votes:
if v in tally:
tally[v] = tally[v] + 1
else:
tally[v] = 1
(a) State the dictionary after the loop. (2) (b) Add pseudocode after the loop to report the winner, assuming a rule for ties (state your rule). (3)
Q3. Debug a function (5 marks)
This function should return the second-largest value in a list of distinct numbers, but it returns the largest:
def second_largest(nums):
best = nums[0]
for n in nums:
if n > best:
best = n
return best
(a) Give a test input and expected output that exposes the defect. (1) (b) Locate the mechanism: which line, and why does it cause the symptom? (2) (c) Rewrite the function minimally (track two values). (2)
Q4. Functions and contracts (6 marks)
A teammate writes one function process(names) that: lowercases every name, removes duplicates, sorts, prints the sorted list, and prints the count.
(a) State the contract problem with this function in one sentence. (2) (b) Redesign it as two functions; give each a name, parameters, and what it returns (one line each). (2) (c) Give one input that tests the boundary of the dedup step. (2)