Quiz — Lecture 31
Section A from memory, one line each. Section B shows your reasoning - marks are for method, not final answers. Answers are discussed in class; the exit ticket goes on a card.
Section A
A1. Define expected value of an action.
A2. What is a flip point?
A3. What information does the host's opened door carry in the game show?
A4. EV is one decision rule; name another for catastrophic stakes.
Section B
B1. Umbrella: cost 2, rain cost 10, p = 0.3 - decide and give the flip point.
B2. Game show: enumerate three doors for stay vs switch.
Exit ticket
Answer one of these on your card in 60 seconds (choose any one):
- What does expected value compare, and what does it ignore?
- Why does switching win in cs-122?
- When is a dominated strategy visible instantly?
Homework
- Before: skim the four student pages; attempt case 1 on paper.
- After: write a five-line pseudocode solution for any case you did not
- Enrichment (optional): the stretch question on each case page.