Project Roadmap¶
Thirty projects and ten capstones, arranged so that each one asks you for something you have not done before. This page is the path: what to do when, in what order, and what each step is actually testing.
The tiers differ in how much design freedom you get, not in how long they take. A mini project tells you the classes. A capstone tells you the problem and nothing else.
Mini Intermediate Advanced Capstone
──── ──────────── ──────── ────────
1–3 classes 4–8 classes 8–15 classes whatever it needs
2–5 hours 10–18 hours 1–3 weeks a term
1 idea each a small system a design you defend a system you own
Modules 1–8 Modules 8–13 Modules 12–15 Modules 1–16
The path in one table¶
| Stage | After | Do | What it proves |
|---|---|---|---|
| 1 | Module 2 | Mini 1, Mini 2 | You can write a class with an invariant, from scratch |
| 2 | Module 5 | Mini 3, Mini 4 | Operators and class-level state are things you can design, not copy |
| 3 | Module 8 | Mini 5, Mini 6, Mini 7 | You can put a polymorphic container together and keep the lifetimes straight |
| 4 | Module 10 | Mini 8, Mini 9, Mini 10 | Templates, exceptions and the STL are usable, not just known |
| 5 | Module 11 | Two intermediate projects | You can hold a small system together on your own |
| 6 | Module 13 | Two more intermediate projects | Failure behaviour is part of your design, not an afterthought |
| 7 | Module 15 | One or two advanced projects | You can make, name and defend a design decision |
| 8 | Module 16 | One capstone | You can carry a system from problem statement to design report |
If you are studying to a schedule, the minimum honest path is: three mini projects, four intermediate, one advanced, one capstone. That is enough to have built something with every element in the course at least once, and it is roughly the workload of a single term's project plus exercises.
What each tier demands, and what it leaves to you¶
| Mini | Intermediate | Advanced | Capstone | |
|---|---|---|---|---|
| Class list | Given or suggested | Yours, with the elements stated | Yours | Yours |
| Relationships | One or two | An ownership diagram required | Diagram, multiplicities, justified | Diagram, justified, marked as a deliverable |
| Polymorphism | Where it is the topic | Required | Required, with no type tags in the core | Required |
| The STL | Optional but likely | Required, with reasons | Required, with measurements or arguments | Required |
| Exceptions | Refusals only | A failure policy required | Guarantees designed and tested | Guarantees, failures and recovery designed |
| Patterns | None | Considered, not required | Two named and one declined, argued | Two required and one declined, argued |
| Persistence | No | Usually required | Required, with a versioned format | Required, with hand-editing tolerated |
| Tests | A checklist run | Assertions, invariants and boundaries | Assertions plus a deliberate bug caught | Full suite, plus a design report |
| Writing | A checklist | A one-page design note | One to two pages, with decisions reversed | A design report, with one decision reversed |
Concept coverage: where each idea is first forced¶
Every concept in the course appears at least twice across the tiers. The first project that forces it — as opposed to allowing it — is listed here.
| Concept | First forced by |
|---|---|
| Encapsulation and invariants | Mini 1 — Temperature Converter |
| Operator overloading | Mini 3 — Fraction Type |
| Static members and lifetimes | Mini 4 — Visitor Counter |
| Inheritance and abstract interfaces | Mini 5 — Shape Areas |
| Copy and move semantics | Mini 6 — Stopwatch |
| Ownership with smart pointers | Mini 7 — Playlist Ownership |
| Templates and non-type parameters | Mini 8 — Generic Ring Buffer |
| Exception hierarchies and guarantees | Mini 9 — Report Parser |
| Containers and algorithms with reasons | Mini 10 — Word Frequency |
| Composition and ownership across objects | Intermediate 1 — Virtual Zoo |
| Rules that vary by configuration | Intermediate 2 — Student Gradebook |
| Undo, as a design decision | Intermediate 3 — Shape Editor |
| State machines | Intermediate 6 — Vending Machine |
| Golden-file testing | Intermediate 10 — Shipping Quote Engine |
| A named design pattern, justified | Advanced 1 — Chess Engine Core |
| Recalculation and dependency graphs | Advanced 2 — Spreadsheet Engine |
| Deterministic simulation | Advanced 5 — Elevator Simulation |
| Compile-time versus run-time decisions | Advanced 6 — Policy-Based Cache |
| Extension without editing the host | Advanced 8 — Plugin Command Runner |
| A whole system, designed and defended | Capstone options |
Choosing what to do, if you have limited time¶
Two weeks. Pick three mini projects that cover concepts you have not yet used in your own code — usually the ones you have only read about. Then stop; a rushed capstone is worse than none.
A month. Four mini projects, then two intermediate projects from different skill columns (one for invariants, one for persistence). Write both design notes properly.
A term, with an assessed project. Two mini, two intermediate, one advanced, then one capstone. Do not start the capstone before the advanced project is finished and reviewed, because the capstone assumes you can already make design decisions unaided.
A term, self-study, no assessment. Follow the eight stages in the table above. The value is in the order, not in the count: each project prepares you for the next, and skipping stages shows up as a design that cannot survive a change.
When the last project is done: teach it
The one test of understanding that nothing else substitutes for is explaining it. Rewrite your hardest module from memory as though you were teaching it, then correct it against the real page — the corrections are your revision list. Or take an advanced project you finished and implement one part a second, different way, then write down which version you would keep and why. That comparison is the design judgement the capstone is marked on.
How the tiers build on each other¶
Each tier reuses a skill the previous one introduced, but not the same domain or the same code. That is deliberate: a project that starts from your own previous solution is an extension, not a project — and the capstone briefs explicitly rule out reusing the lab system for the same reason.
- Mini → Intermediate. Mini teaches one class with an invariant. Intermediate asks for several classes with relationships, and for the invariant to survive operations that touch two objects.
- Intermediate → Advanced. Intermediate asks for a system that works. Advanced asks for a system whose structure you chose, can name, and would defend under challenge.
- Advanced → Capstone. Advanced asks for one deep decision, named and justified. The capstone asks for many, held together: a documented format, a multi-file layout, a test suite, patterns justified by requirements, and a design report that names the decision you would reverse.
The no-solutions rule, across the whole ladder¶
None of these projects comes with a complete solution in this course. The sixteen labs have reference solutions because the labs teach techniques; the projects exist to make you practise choosing among them. Each brief gives you requirements, constraints, a design discussion that raises the questions without answering them, and checklists that are strict enough to serve as a code review.
Reading a solution to a project you have attempted teaches you less than re-reading your own design note. That is not a motivational claim; it is what the rubric measures.