Challenges

← Module home · Labs →

Open problems — no solutions exist on these pages on purpose. Rate yourself honestly: ★ warm-up · ★★ solid · ★★★ stretch. Every one is answerable with this module plus the Foundations toolkit. When you solve one, write the solution so a classmate could follow it — that is the next level.

The standing rule: Try It Yourself.


C1 ★ — The Multiplication Poster. Ask for a number; print its times table 1–10 as a perfectly aligned two-column table (factor width 3 right, product width 6 right). No loops exist in your toolkit yet — ten output statements are allowed; alignment is the point.

C2 ★ — The Fallback Receipt. Read item, quantity, unit price (one word, one int, one double); print a receipt with fixed/setprecision money, a dot-filled line to a 30-character subtotal, and a grand total. Money columns must survive the swap Chai 3 40 → Mango Shake 2 125.5 without editing code.

C3 ★★ — The Echo Machine. Read one line; print it back enclosed in >>> <<<. Then read a second line; print it in reverse-word order. You may split with >> in a loop, or use find/substr — or read words until the line ends (think: how does >> behave at a newline?).

C4 ★★ — The Form That Cannot Be Filled Wrong. Build the data-entry part of Lab 1 (name, roll no, marks) such that every read survives the user typing the fields on one line, on separate lines, or with junk after numbers. Document the exact input formats your program tolerates, in a comment header.

C5 ★★ — The Buffer Forensics Report. Write a program that reads, in order: int, string (word), double, string (line, cured), and after each read prints what your paper model says the buffer holds (you can’t print the buffer itself — print your claim, then design inputs that prove or disprove it). Deliverable: code + a filled trace table + a one-paragraph verdict on where your mental model was wrong.

C6 ★★ — The Two Cures, Compared. Implement the age-then-name program three times: buggy, ignore-cured, >> ws-cured. Then craft one input transcript where the two cures produce different visible results (hint: junk after the number on the age line). Report the transcripts and explain which cure is right for which promise.

C7 ★★ — The Silent Grand Total. Read expenses until the user types a negative number (sentinel — a borrowed loop is allowed), then print the total money-formatted. The trap: your numeric loop uses >>, so the newline left by the last expense is still there when you try to read the final confirmation line. Design the interaction; cure the buffer; show three test transcripts.

C8 ★★★ — The Teacher’s Explainer. Write (in Markdown, in your repo notes) a one-page explanation of the cin/getline mixing trap aimed at the student one week behind you: buffer diagrams, the table of readers from Lesson 3 §3.5, and two worked transcripts. Test it on a classmate; revise where they got lost.

C9 ★★★ — The Robust Ask. Write int askInRange(string prompt, int lo, int hi) — a function that prints the prompt, reads, rejects non-numbers (fail/clear/ignore) and out-of-range values, and loops until legal — then use it to build a 3-question “course rating” form. Functions arrive officially in Unit 07; consider this the installation preview. (Yes, this is a deliberate bridge forward.)

C10 ★★★ — The Column Test Suite. Design and print a 4-column report (name w12 left, roll w6 right, marks w5 right, grade w4 centre-by-hand) for five hard-coded students whose name lengths are 4, 6, 9, 12, and 14 — the last one must visibly overflow column 1, and your write-up must explain what overflow means for tables. Then swap in setfill('.') for the marks column only, and explain what had to change.


← Module home · Labs →