Trace Pack — 15 dry runs

← Module home · Trace on paper before opening the answers. Every table you build by hand is a deposited skill; every table you read is a borrowed one.

Protocol: copy the data, run the algorithm by hand one step at a time, record each step in a table, and only then check. If your table disagrees with the answer, re-trace the answer’s steps until you can see where your hand went wrong — that reconciliation is the learning event.

Recursion (T1–T6)

Searching (T7–T11)

Sorting (T12–T15)


Answers

Recursion

A1. Descent stacks f(5)→f(4)→f(3)→f(2)→f(1)→f(0); f(0) returns 1; ascent: f(1)=1, f(2)=2, f(3)=6, f(4)=24, f(5)=120. Five boxes deep.

A2. Descent: sumTo(6) waits on (5) waits on (4) waits on (3) waits on (2) waits on (1)=1. Ascent: sumTo(2)=2+1=3, sumTo(3)=3+3=6, sumTo(4)=4+6=10, sumTo(5)=5+10=15, sumTo(6)=6+15=21.

A3. digitSum(9182) = 2 + dS(918) = 2 + (8 + dS(91)) = 2+8+(1 + dS(9)) = 2+8+1+9 = 20. digits(9182) = 1 + digits(918) = 1+1+1+1 = 4. Same depth (4 calls each) — both shrink by a factor of 10 per call; digitSum does more combining, digits doesn’t.

A4. Descent: 4729→472→47→4; 4 < 10 is the base, prints nothing yet (base prints when reached: 4 prints at the base). Ascent prints: after returning from 4, the 47 frame prints 7, then 472 prints 2, then 4729 prints 9. Output: 4729. All digits except the leading one print during ascent — recursion-first-then-print is the whole mechanism.

A5. fib(5) tree: fib(5)→{fib(4)→{fib(3)→{fib(2), fib(1)}, fib(2)}, fib(3)→{fib(2), fib(1)}}. Calls: 15. Duplicates: fib(3) ×2, fib(2) ×3, fib(1) ×2. Distinct subproblems: 5 (fib 1..5). The ratio 15/5 is the overlap tax.

A6. Calls: (n=5, a[4]=9≠2 → +0, recurse) → (n=4, a[3]=2 → +1) → (n=3, a[2]=2 → +1) → (n=2, a[1]=7 ≠2 → +0) → (n=1, a[0]=2 → +1) → (n=0 → base 0). Ascent: 0, 1, 2, 2, 2 → returns 3.

Searching

A7. Compare 42≠16, 7≠16, 19≠16, 16==16 → return index 3. 4 comparisons.

A8. All five compared, none match → −1. 5 comparisons (worst case, n=5).

A9. (0,6): mid=3, a[3]=19 → found. 1 comparison — the average-looking case, caught on the first split. (log₂ 7 ≈ 2.8, so worst would be 3; this input is lucky.)

A10. (0,6): mid=3, 19>5 → left. (0,2): mid=1, 7>5 → left. (0,0): mid=0, 3<5 → lo=1. Now lo(1) > hi(0) → −1. Absence is proved by the range emptying — specifically by the last comparison (3<5) showing even the last candidate is too small; there is no “not found” message, only an empty range.

A11. x=57: (0,6,mid3,19<57)→(4,6,mid5,42<57)→(6,6,mid6,57) = 3. x=3: (0,6,mid3,19>3)→(0,2,mid1,7>3)→(0,0,mid0,3) = 3. Equal — both are the ⌈log₂ 7⌉ = 3 worst case; ends of the array are not lucky for binary search, the middle often is.

Sorting

A12. Bubble, {9,3,7,1}: pass1: (9,3)sw, (9,7)sw, (9,1)sw → 3,7,1,9; pass2: (3,7)ok, (7,1)sw → 3,1,7,9; pass3: (3,1)sw → 1,3,7,9; pass4: clean → flag fires, stop. Swaps: 6. Without the flag, pass 4 still runs (5 more comparisons for nothing).

A13. Selection, {9,3,7,1}: start0: min 1(idx3), swap → 1,3,7,9; start1: min 3(idx1), self; start2: min 7(idx2), self. Swaps: 1. Comparisons: 3+2+1 = 6, fixed — the opposite personality from A12’s 6 swaps: selection pays in comparisons, bubble in swaps.

A14. Insertion, {9,3,7,1}: i1 key=3: 1 shift → 3,9,7,1; i2 key=7: 1 shift → 3,7,9,1; i3 key=1: 3 shifts → 1,3,7,9. Shifts: 5.

A15. Insertion on {1,2,4,3,5,6}: only key=3 shifts one element (4). 1 shift. Selection on the same: comparisons = 5+4+3+2+1 = 15 — unchanged, because selection never looks at the input’s order. Sentence: insertion’s cost reads the data’s shape (1 unit of disorder → 1 unit of work); selection’s cost ignores it entirely — the same input is one algorithm’s best case and another’s average.


Where next

— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor