Debugging — 10 seeded hunts

← Module home · Each program compiles (or nearly) but misbehaves. Read the code, predict the symptom, form a hypothesis, then hunt. Hints escalate; the diagnosis is separated at the bottom of its hunt. The module’s standing rule applies: trace before you trust.

The hunts and their prey: D1 base case · D2 unreachable base · D3 shift-loses-key · D4 loop-bound pairing · D5 binary update error · D6 wrong shrink direction · D7 binary boundary · D8 flag misuse · D9 comparison strictness · D10 the audit.


D1 — The countdown that never lands

int countdown(int n) {
    if (n == 0) return 0;
    return countdown(n - 1);
}

int main() {
    cout << countdown(-3) << "\n";   // expected: 0
    return 0;
}

The programmer expected 0. The program dies with a stack overflow. Why does n == 0 never arrive, and what is the general rule this violates? (Write the rule as a sentence you could apply to any recursive function.)

Diagnosis — after you've committed to an answer

The shrinkage is n - 1 from a negative starting value: −3, −4, −5, … — the base case n == 0 is behind the start, unreachable. The general rule: the base case must lie on the path the shrinkage takes from every legal input. Fixes: (a) precondition n >= 0 documented and checked, or (b) base case n <= 0 if the contract says negatives also terminate at 0. The bug class: a base case written for friendly input only.


D2 — The skip that skips the door

// intent: sum every second element: {1,2,3,4,5} -> 1+3+5 = 9
int everyOther(const int a[], int n, int i) {
    if (n == 1) return a[0];
    return a[i] + everyOther(a, n - 2, i);
}

everyOther(a, 5, 0) on {1,2,3,4,5} returns 9 sometimes… and reads garbage other times. Two distinct defects: the base case tests the wrong variable, and the shrinkage doesn’t move i. Trace with n=5 and n=4 and name both.

Diagnosis

Defect 1: the base case checks n but the function’s real position is i — the recursion walks i through the array, so the door should be if (i >= n) return 0;. Defect 2: i never advances — every level reads a[0]. Correct version: int eo(const int a[], int n, int i){ if (i >= n) return 0; return a[i] + eo(a, n, i + 2); }. Bug class: two moving parts, one updated — when a recursion walks an index, the index is the state that must shrink.


D3 — The insertion sort that loses a value

void insertionSort(int a[], int n) {
    for (int i = 1; i < n; i++) {
        int j = i - 1;
        while (j >= 0 && a[j] > a[i]) {   // no key variable!
            a[j + 1] = a[j];
            j--;
        }
        a[j + 1] = a[i];                  // ...and this reads the wrong thing
    }
}

Sorting {7, 3, 9, 3} produces 3 7 3 3? — run the trace by hand and find the exact statement where the value 7’s slot gets clobbered. Then state the fix in four words.

Diagnosis

Without key, the first shift overwrites a[i] — the very value being inserted. Tracing {7,3,9,3}: i=1, key missing, a[0]=7 > a[1]=3 → a[1] = 7 destroys the 3 → array 7,7,9,3; insert reads a[1] — now 7 — putting 7 back. The 3 is gone. Fix, four words: save the key first (int key = a[i]; before the while; compare and insert with key). Symptom signature of this bug class: output has one value duplicated and one missing.


D4 — The condition that reads the fence

void insertionSort(int a[], int n) {
    for (int i = 1; i < n; i++) {
        int key = a[i];
        int j = i - 1;
        while (a[j] > key && j >= 0) {    // conditions swapped
            a[j + 1] = a[j];
            j--;
        }
        a[j + 1] = key;
    }
}

Most inputs sort fine. The crash (or garbage) happens on exactly one kind of input — which, and why? What does this teach about condition order?

Diagnosis

a[j] is evaluated before j >= 0, so when the key is smaller than every element, j reaches −1 and a[-1] is read — out of bounds, undefined. The input that triggers it: any array whose smallest element is its first key or travels to the front (e.g. {5, 1, 2, 3}). Lesson: guard conditions first — the cheap, safe test before the data test. (C++’s && guarantees left-to-right evaluation only if you put the guard on the left.)


D5 — The binary search that walks in circles

int binSearch(const int a[], int n, int x) {
    int lo = 0, hi = n - 1;
    while (lo <= hi) {
        int mid = lo + (hi - lo) / 2;
        if (a[mid] == x) return mid;
        if (a[mid] < x)  lo = mid;      // ← the bug
        else             hi = mid;
    }
    return -1;
}

On {3, 7, 11, 19, 23}, searching for 23 never returns. Trace (lo, hi, mid) for three iterations and describe the stall; then state the two-character fix and the invariant each update preserves.

Diagnosis

Trace x=23: (0,4) mid=2, 11<23 → lo=2. (2,4) mid=3, 19<23 → lo=3. (3,4) mid=3, 19<23 → lo=3 — stalled: lo never moves past mid, and mid is inside the range forever. The updates must exclude the already-checked mid: lo = mid + 1 and hi = mid - 1. Invariant: every update must shrink the range (hi−lo strictly decreases); mid is the element you’ve already compared, so the surviving half starts beyond it. Without exclusion, the range can stop shrinking → infinite loop.


D6 — The recursion that grows

// intent: digits(n) — how many digits?
int digits(int n) {
    if (n == 0) return 0;
    return 1 + digits(n * 10);   // ← the shrinkage
}

digits(5) should be 1. What actually happens, and what does the erroneous expression compute instead of shrinking? Give the fix and the one-sentence test that catches this class before running.

Diagnosis

n * 10 grows the argument — the recursion runs away from the base case until signed overflow (then undefined behaviour) or the stack dies. Shrinkage for digit problems is division: n / 10 (with base n < 10 → 1, or keep base 0 and accept digits(0)=0 — but document it). The pre-run test: state, in one sentence, why the argument moves toward the base case. If you can’t, it doesn’t.


D7 — The boundary that loses the first element

int binSearch(const int a[], int n, int x) {
    int lo = 0, hi = n;          // ← starts wrong for this loop
    while (lo < hi) {
        int mid = lo + (hi - lo) / 2;
        if (a[mid] == x) return mid;
        if (a[mid] < x)  lo = mid + 1;
        else             hi = mid - 1;
    }
    return -1;
}

On {3, 7, 11, 19}, this finds 3… sometimes, and misses it other times. Trace x=3 carefully, name the inconsistency (the loop condition and the updates belong to two different standard formulations), and give one consistent version.

Diagnosis

Trace x=3: (0,4) mid=2, 11>3 → hi=1. (0,1) mid=0, a[0]=3 → found. Now x=7: (0,4) mid=2, 11>7 → hi=1. (0,1) mid=0, 3<7 → lo=1. (1,1): loop condition lo < hi false → −1, but 7 is present. Mixed formulation: hi = n (half-open style) with hi = mid - 1 updates (closed style) loses candidates. Consistent version A (closed): hi = n - 1; while (lo <= hi); updates mid±1. Consistent version B (half-open): hi = n; while (lo < hi); updates lo = mid + 1, hi = mid. Bug class: formulation mixing — pick one convention, apply it to condition and updates.


D8 — The flag that fires too late

void bubbleSort(int a[], int n) {
    bool swapped = true;
    int pass = 0;
    while (swapped) {
        swapped = false;
        for (int i = 0; i < n - 1 - pass; i++) {
            if (a[i] > a[i+1]) {
                int t = a[i]; a[i] = a[i+1]; a[i+1] = t;
                // missing line here
            }
        }
        pass++;
    }
}

On sorted input this version does n−1 full passes instead of one. Which line is missing, what does its absence cost exactly, and where must it sit?

Diagnosis

swapped = true; inside the swap branch. Without it, swapped is false at every pass end, the while never exits early, and the early-exit optimization is dead — the algorithm degenerates to fixed (n−1) passes (still correct, still O(n²) always). It must sit inside the if, immediately after the swap, so that “this pass moved something” is recorded per movement. Cost on sorted input: n−1 passes × (n−1−pass) comparisons ≈ n²/2 comparisons for a job that costs n−1 with the flag.


D9 — The sort that chews equals

void insertionSort(int a[], int n) {
    for (int i = 1; i < n; i++) {
        int key = a[i];
        int j = i - 1;
        while (j >= 0 && a[j] >= key) {   // note: >=
            a[j + 1] = a[j];
            j--;
        }
        a[j + 1] = key;
    }
}

The output is still correctly sorted — so what’s wrong? Construct the input where this version does strictly more work than the lesson’s, and connect the observation to the stability idea from Exercise E29.

Diagnosis

With >=, an element equal to the key is shifted right and the key lands before it — equal elements cross. Output stays sorted (values don’t care), but (1) extra shifting on duplicate-heavy input: {2,2,2,2,2} shifts 10 times vs 0 with strict >; (2) stability is lost: records that compared equal come out in reversed original order. The lesson’s strict > shifts only strictly greater elements — equals never cross. Symptom class: “correct output, wasted motion, broken equal-order” — the bugs that only a work-counting test catches.


D10 — The audit: three bugs, one file

// A lab submission. Find all three defects before reading the list.
void selectionSort(int a[], int n) {
    for (int start = 0; start <= n; start++) {          // line A
        int m = start;
        for (int i = start; i < n; i++) {               // line B
            if (a[i] < a[m]) m = i;
        }
        int t = a[start]; a[start] = a[m]; a[m] = t;    // line C
    }
}
Diagnosis

Line A: start <= n runs one pass too many; on the final pass start == n and m = n, so line C reads a[n] — out of bounds. Must be start < n - 1. Line B: the inner scan starts at start instead of start + 1 — harmless for correctness (comparing a[i] with itself changes nothing) but wasteful, and it masks nothing: it’s the tell that the author copied the min-scan template without adapting the bound. Line C: no if (m != start) guard — self-swaps happen on nearly every pass of sorted input. Wasteful but correct; the guard is cheap professionalism. Verdict order: A is a crash bug, B is a waste bug, C is a hygiene bug — audit in that order.


Fix-list recap

Hunt Bug class Prevention rule
D1 base case off the shrink path sentence-test the shrinkage
D2 one of two moving parts updated name the state that shrinks
D3 shift destroys the key save the key first
D4 guard after the data test conditions: guard first
D5 update doesn’t exclude mid shrink or stall
D6 grow instead of shrink sentence-test the shrinkage
D7 mixed loop formulations one convention, fully applied
D8 early-exit flag never set set the flag inside the swap
D9 >= in shifting loops strict comparison, stable order
D10 bound/guard hygiene audit crashes → waste → hygiene

Where next

— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor