Lesson 3 — Sorting
In this lesson you will learn
- three elementary sorting algorithms — bubble, selection, insertion — as three different answers to one question
- pseudocode, dry runs, and C++ implementations for each
- how to trace a sort by hand (the exam-proof skill)
- comparison counting and the O(n²) intuition
- which sort to pick, and the mistakes common to all three
All three algorithms answer the same question — rearrange this array into ascending order — with the same budget: compare two elements, swap or shift, repeat. They differ in which two elements they compare and what they do about it. Learn them as three personalities, not one blur.
A shared helper for this lesson and the lab:
// swap helper — used by bubble and selection
void swapInts(int& a, int& b) {
int t = a; a = b; b = t;
}
1. Bubble sort — big values float to the end
Concept. Walk the array comparing neighbours. Any pair out of order swaps, so after one full pass the largest value has bubbled to the last position. Repeat for the rest.
Pseudocode
function bubbleSort(arr, n):
for pass from 1 to n-1:
for i from 0 to n-1-pass: // the tail is already in place
if arr[i] > arr[i+1]:
swap(arr[i], arr[i+1])
Dry run — one full pass on {5, 1, 4, 2, 8} (the classic):
| compare | before | action | after |
|---|---|---|---|
| a₀,a₁ | 5,1 | swap | 1,5,4,2,8 |
| a₁,a₂ | 5,4 | swap | 1,4,5,2,8 |
| a₂,a₃ | 5,2 | swap | 1,4,2,5,8 |
| a₃,a₄ | 5,8 | ok | 1,4,2,5,8 |
Pass 1 ends 1,4,2,5,8 — and notice 8 was placed, not 5: the last pass position always lands the region’s maximum. Full sort: pass 2 on the first four compares 1,4 / 4,2 / 2,5 → one swap → 1,2,4,5,8; pass 3 makes no swaps → the flag ends it early. That is exactly why hand-tracing matters — the table is the truth, the story in your head is not.
C++ implementation
// bubble.cpp — Programming Fundamentals Using C++
// Unit 10 · Lesson 3 · Bubble sort
// Compile: g++ -std=c++17 -Wall -Wextra bubble.cpp -o bubble
#include <iostream>
using namespace std;
void bubbleSort(int a[], int n) {
for (int pass = 1; pass <= n - 1; pass++) {
bool swapped = false; // the early-exit flag
for (int i = 0; i < n - pass; i++) {
if (a[i] > a[i + 1]) {
int t = a[i]; a[i] = a[i+1]; a[i+1] = t;
swapped = true;
}
}
if (!swapped) break; // a clean pass: already sorted, stop early
}
}
int main() {
int a[] = {5, 1, 4, 2, 8};
bubbleSort(a, 5);
for (int i = 0; i < 5; i++) cout << a[i] << " ";
cout << "\n"; // 1 2 4 5 8
return 0;
}
Explanation notes. The swapped flag is the early exit: on already-sorted input one clean pass proves sortedness and stops — bubble’s best case is O(n), the only one of the three that can notice. The inner bound n - pass skips the sorted tail.
Complexity. Worst case (reverse sorted): (n−1)+(n−2)+…+1 = n(n−1)/2 ≈ O(n²) comparisons and swaps. Best case with the flag: n−1 comparisons, zero swaps.
Test cases: {5,1,4,2,8} → 1 2 4 5 8 · {1,2,3} → unchanged, 1 pass · {3,2,1} → sorted, max passes · {7,7,7} → unchanged (note > not >=: equal neighbours don’t swap) · single element → untouched.
2. Selection sort — pick the best, put it in place
Concept. Find the minimum of the unsorted region; swap it to the region’s front; the sorted region grows by one. It is the arrays module’ “index-tracking minimum” wearing a sorting costume — selection is that exact min-finding pass, repeated, with a shrinking boundary.
Pseudocode
function selectionSort(arr, n):
for start from 0 to n-2:
m = index of minimum in arr[start..n-1]
swap(arr[start], arr[m])
Dry run — {64, 25, 12, 22, 11}:
| start | unsorted region | min | swap | array after |
|---|---|---|---|---|
| 0 | 64,25,12,22,11 | 11 (idx 4) | 64↔11 | 11,25,12,22,64 |
| 1 | 25,12,22,64 | 12 (idx 2) | 25↔12 | 11,12,25,22,64 |
| 2 | 25,22,64 | 22 (idx 3) | 25↔22 | 11,12,22,25,64 |
| 3 | 25,64 | 25 (idx 3) | self | 11,12,22,25,64 |
C++ implementation
// select.cpp — Programming Fundamentals Using C++
// Unit 10 · Lesson 3 · Selection sort
// Compile: g++ -std=c++17 -Wall -Wextra select.cpp -o select
#include <iostream>
using namespace std;
void selectionSort(int a[], int n) {
for (int start = 0; start < n - 1; start++) {
int m = start; // assume the front is the min
for (int i = start + 1; i < n; i++) {
if (a[i] < a[m]) m = i; // remember the INDEX, not the value
}
if (m != start) { // swap only when needed
int t = a[start]; a[start] = a[m]; a[m] = t;
}
}
}
int main() {
int a[] = {64, 25, 12, 22, 11};
selectionSort(a, 5);
for (int i = 0; i < 5; i++) cout << a[i] << " ";
cout << "\n"; // 11 12 22 25 64
return 0;
}
Explanation notes. Track the index of the minimum — swapping values directly loses the position. The m != start guard skips self-swaps. The min-finding inner loop uses strict <, so with duplicates it keeps the first minimum — relevant for stability discussions later; at this level, just be consistent.
Complexity. Comparisons are fixed: n(n−1)/2 regardless of input — O(n²) always. But swaps are at most n−1 (one per pass, sometimes zero) — the fewest of the three. That trade defines selection’s personality: minimal movement, maximal comparison. Ideal when writes are expensive; useless when data is nearly sorted (it still scans everything).
Test cases: {64,25,12,22,11} → 11 12 22 25 64 · {2,1} → one swap · {1,2} → guard skips the swap · {5} → untouched · duplicates {3,1,3} → 1 3 3.
3. Insertion sort — the card-player’s sort
Concept. Keep a sorted region at the left (initially just a[0]). Take the next element — the key — and shift bigger elements right until the key’s home appears; insert. It is exactly how people sort a hand of cards: the hand is sorted, the new card slides into place.
Pseudocode
function insertionSort(arr, n):
for i from 1 to n-1:
key = arr[i]
j = i - 1
while j >= 0 and arr[j] > key:
arr[j+1] = arr[j] // shift right
j = j - 1
arr[j+1] = key // drop the key into its gap
Dry run — {7, 3, 9, 3}:
| i | key | shifts | array after |
|---|---|---|---|
| 1 | 3 | 7→right | 3,7,9,3 |
| 2 | 9 | none (7 ≤ 9) | 3,7,9,3 |
| 3 | 3 | 9,7 right | 3,3,7,9 |
C++ implementation
// insert.cpp — Programming Fundamentals Using C++
// Unit 10 · Lesson 3 · Insertion sort
// Compile: g++ -std=c++17 -Wall -Wextra insert.cpp -o insert
#include <iostream>
using namespace std;
void insertionSort(int a[], int n) {
for (int i = 1; i < n; i++) {
int key = a[i];
int j = i - 1;
while (j >= 0 && a[j] > key) { // both conditions, in this order
a[j + 1] = a[j]; // shift right
j--;
}
a[j + 1] = key; // insert into the gap
}
}
int main() {
int a[] = {7, 3, 9, 3};
insertionSort(a, 4);
for (int i = 0; i < 4; i++) cout << a[i] << " ";
cout << "\n"; // 3 3 7 9
return 0;
}
Explanation notes. The shifting loop is where all the care lives. Condition order matters: j >= 0 first, or a[j] reads a[-1] on the smallest key. The key is saved in key because shifting overwrites a[i]’s slot. The insert lands at j+1 — the gap the last shift opened.
Complexity. Worst case (reverse sorted): each key shifts past everything before it — O(n²). Best case (already sorted): each key fails the while immediately — O(n). Nearly-sorted data: only small shifts — close to O(n). This “excellent when almost sorted, fine when small” profile is insertion’s whole identity — and the reason many real libraries’ sort functions hand small slices to insertion sort internally.
Test cases: {7,3,9,3} → 3 3 7 9 · {1,2,3,4} → untouched, n−1 key checks · {4,3,2,1} → max shifts · {2,2,2} → unchanged (strict > never shifts equals) · {5} → untouched.
4. The three, compared — personalities and use cases
| Bubble | Selection | Insertion | |
|---|---|---|---|
| Core move | swap neighbours | swap min to front | shift right, insert key |
| Worst comparisons | O(n²) | O(n²), always | O(n²) |
| Best case | O(n) with early exit | O(n²) | O(n) |
| Swaps/moves | many (every inversion) | fewest (≤ n−1) | many shifts, but cheap ones |
| Nearly-sorted data | good with flag | poor | best |
| Signature virtue | simplest to explain | minimal writes | adaptive |
| Pick it when | teaching; tiny data | writes are expensive; tiny data | data is small or nearly sorted |
Three honest truths to carry forward:
- All three are O(n²) in the worst case. For 1,000,000 items that is ~500 billion comparisons — the lab makes you watch the wall. The professional sorts (merge, quick, heap — and the standard library’s
sort) reach O(n log n); the merge challenge you’ve already solved is that family’s seed. - The O(n²) family is not obsolete. For small n (dozens), constants and simplicity win, and real sorts switch to insertion sort for exactly those slices.
- Tracing is the transferable skill. Exams, interviews, and debugging all pay out on hand-traced tables, not on memorized code.
A counting game for intuition (do it once, really): compare-and-count both searches and sorts on the same paper. Linear search of 64 items: ≤ 64 comparisons. Binary search: ≤ 6. Bubble on 64: ~2,016 comparisons. Insertion on nearly-sorted 64: ~64. The same “count the comparisons” muscle that told you binary beats linear now tells you which sort fits your data’s shape.
5. Common mistakes — shared by all three sorts
- Off-by-one bounds. Bubble’s inner loop must stop at
n - pass; selection’s inner loop starts atstart + 1; insertion’s outer loop starts ati = 1(a one-element prefix is already sorted). Each violation reads or writes a neighbour it shouldn’t. - Shifting overwrites the key. In insertion,
a[i]is destroyed by the first shift — save thekeyfirst. Symptom: the sorted output has one value repeated and one missing. - Strict vs non-strict comparisons.
>vs>=decides whether equal elements swap/shift. Use strict comparisons for stability-friendly, wasted-motion-free sorts — and be consistent. - Forgetting the loop condition pairing. Insertion’s
while (j >= 0 && a[j] > key)— reversing the order readsa[-1]. Symptom: intermittent crashes on the smallest element. - Testing only on the lesson’s array. Every algorithm here must survive: empty, single element, two elements, all equal, already sorted, reverse sorted, negatives, duplicates. The trace pack and challenges keep the pressure on.
The ritual, same as recursion’s: pseudocode → one hand trace → implementation → the edge-case list. Not because the code is hard, but because the boundaries are.
Check yourself
- Which sort does the fewest writes? Which notices sorted input fastest? (selection; bubble with the flag)
- Why does insertion’s outer loop start at
i = 1? (a one-element prefix is trivially sorted) - On
{2,1,3}, which sort moves the fewest elements? Trace all three: bubble swaps once (2,1) then compares (1,3); selection finds min 1 and swaps once; insertion shifts 2 right to place the key 1 — one move, no swap. All three do comparable work here; “fewest moves” is insertion’s edge, but on tiny inputs the difference is a coin toss — which is exactly why small arrays are all three algorithms’ home turf.
Where next
- Labs: the Algorithm Performance and Comparison Lab — count the comparisons yourself.
- Exercises: Part C drills all three personalities.
— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor