Project Progress Review Checklist

Used at the week-28 midpoint check-in (10 minutes per project, in the lab session) and by students as a self-check at the end of weeks 26 and

  1. The midpoint decomposition document is worth 5 of the 30 project

points; this checklist is how the conversation is structured — it is not a form to submit.

Before the meeting (student)

The six checkpoints (instructor ticks each)

1. The tree is real

2. The data exists

3. One vertical slice works

4. The test plan has rows

5. Assumptions survived contact

6. The cut order still holds

The three outcomes

OutcomeMeaning
On track (5–6 ticks)Proceed; the 5 midpoint points are recorded.
On track with cuts (3–4)Proceed with the cut decided in the meeting — write the cut on the document; both sign.
Rescue needed (≤ 2)Scope is reduced to the vertical slice + one question; a new one-page plan is agreed; the project can still reach the "good" band of the rubric — say so explicitly, mid-semester panic is the enemy.

After the meeting (student)