Worked Examples — Lecture 14
Each example below follows the same arc: problem, analysis, algorithm, pseudocode, then Python where the lecture has introduced it. Python blocks are machine-verified; the comment lines # expect: match the actual output. Edge cases and complexity close each example - they are part of the answer, not decoration.
| Example | Case | Python? |
|---|---|---|
| 1. The validator trio: three contracts, one driver | cs-053 | yes |
| 2. Refactor the monolith: same output, new shape | cs-054 | yes |
| 3. The parameter jungle: the mutable default | cs-055 | yes |
| 4. Pipelines as functions: clean, tokenise, count | cs-056 | yes |
1. The validator trio: three contracts, one driver (case cs-053)
Problem. Write three independent checks - email-ish, phone-ish, student-ID - and a driver that prints a verdict table for sample values.
Analysis. Each check is a function: input string -> boolean. The driver is dumb plumbing. Splitting them means each rule can be tested alone - the reuse lesson in miniature.
Algorithm.
- define looks_like_email(s): one '@', a '.' after it
- define looks_like_phone(s): digits, spaces, plus, right length
- define looks_like_id(s): letter + digits pattern
- drive: print each value with its three verdicts
Pseudocode.
FUNCTION looks_like_email(s) RETURN boolean
FUNCTION looks_like_phone(s) RETURN boolean
FUNCTION looks_like_id(s) RETURN boolean
FOR each value in samples
WRITE value, three verdicts
Python (this block runs; its output is verified by scripts/validate.py):
def looks_like_email(s):
return s.count("@") == 1 and "." in s.split("@")[1]
def looks_like_phone(s):
digits = s.replace(" ", "")
return digits.isdigit() and len(digits) in (10, 11)
def looks_like_id(s):
return len(s) >= 2 and s[0].isalpha() and s[1:].isdigit()
for v in ["ada@uni.edu", "07123 456789", "S2023/4471"]:
print(v, looks_like_email(v), looks_like_phone(v), looks_like_id(v))
# expect: ada@uni.edu True False False
# expect: 07123 456789 False True False
# expect: S2023/4471 False False False
Trace (dry run). 'ada@uni.edu': one @, domain has a dot -> email True; digits only after removing the space -> phone True; 'S2023/4471' has a slash -> id False. Each column is independent - exactly the design goal.
Expected output. three verdict columns for the three sample values
Edge cases. Empty string fails all three (good). Multiple '@' fails email. IDs with leading zeros survive because we check types, not numeric value.
Complexity. Each check O(len(s)); the trio demonstrates decomposition, not performance.
2. Refactor the monolith: same output, new shape (case cs-054)
Problem. One script parses 'name,course,score' lines, drops blanks, averages per student, prints a report. Refactor it into functions without changing behaviour.
Analysis. Find the three jobs hiding in the script: parse one line, aggregate, format. Behaviour is locked by testing on the ORIGINAL output first - refactor under test protection.
Algorithm.
- capture the monolith's output on fixed input (the contract)
- extract parse_line(line) -> (name, course, score) or None
- extract averages(rows) -> dict
- extract format_report(avgs) -> string
- re-run: output must be identical
Pseudocode.
expected <- run original on sample
FUNCTION parse_line / averages / format_report
actual <- run refactored on same sample
CHECK actual = expected
Python (this block runs; its output is verified by scripts/validate.py):
def parse_line(line):
parts = [p.strip() for p in line.split(",")]
if len(parts) != 3 or not parts[2]:
return None
return parts[0], parts[1], float(parts[2])
def averages(rows):
acc = {}
for name, _course, score in rows:
acc.setdefault(name, []).append(score)
return {k: sum(v) / len(v) for k, v in acc.items()}
lines = ["ada,CS1,80", "bo,DS1,", "ada,CS1,95"]
rows = [r for r in (parse_line(l) for l in lines) if r]
avg = averages(rows)
print(round(avg["ada"], 1), len(rows))
# expect: 87.5 2
Trace (dry run). 'bo,DS1,' -> empty score -> None -> dropped. ada contributes 80 and 95 -> 175/2 = 87.5. Two rows survive. The output line proves both the filter and the average.
Expected output. averages: ada 87.5 (bo flagged, not silently dropped)
Edge cases. A line with extra commas -> None (strict). Score 'abc' -> ValueError; a robust parse_line catches it and returns None - flag, do not crash (lecture 12's rule).
Complexity. Unchanged O(n) - refactoring changes shape, not cost.
3. The parameter jungle: the mutable default (case cs-055)
Problem. def add_tag(tag, tags=[]): called three times accumulates instead of starting fresh. Explain, then fix.
Analysis. The default list is created ONCE, at definition time, and shared by every call. This is not a style quirk; it is a correctness bug with a standard fix: None sentinel.
Algorithm.
- demonstrate the bug: three calls, print
- explain: default evaluated once at definition
- fix: default None, create a fresh list inside
Pseudocode.
BUGGY: FUNCTION add_tag(tag, tags = new list)
FIXED: FUNCTION add_tag(tag, tags = NULL)
IF tags = NULL THEN tags <- new list
Python (this block runs; its output is verified by scripts/validate.py):
def add_tag(tag, tags=None):
if tags is None:
tags = []
tags.append(tag)
return tags
a = add_tag("x")
b = add_tag("y")
print(a, b, a is b)
# expect: ['x'] ['y'] False
Trace (dry run). With the buggy default: call 1 appends into the shared list ['x']; call 2 appends into the SAME list ['x','y']; call 3 -> ['x','y','z']. With the sentinel each call starts empty; the identity check prints False, proving two distinct lists.
Expected output. buggy: calls accumulate in one shared list; fixed: each call gets its own list
Edge cases. The bug only bites for mutable defaults (list, dict, set) - an int default cannot accumulate. Any function returning the mutated default spreads the shared object further.
Complexity. No performance argument either way - this is a semantics lesson.
4. Pipelines as functions: clean, tokenise, count (case cs-056)
Problem. Turn ' the CAT, the dog! ' into a word count. Build it as three small functions composed in a pipeline.
Analysis. Each stage's output is the next stage's input: clean (strip, collapse spaces) -> tokenise (split) -> count (dictionary). Functions make each stage testable and the order swappable.
Algorithm.
- clean(s): strip and squeeze whitespace
- tokenise(s): split on spaces
- count(words): dictionary tally
- pipeline: count(tokenise(clean(s)))
Pseudocode.
FUNCTION clean(s) RETURN normalised string
FUNCTION tokenise(s) RETURN list of words
FUNCTION count(ws) RETURN dictionary
WRITE count(tokenise(clean(text)))
Python (this block runs; its output is verified by scripts/validate.py):
def clean(s):
return " ".join(s.split())
def tokenise(s):
return s.split(" ")
def count(words):
d = {}
for w in words:
d[w] = d.get(w, 0) + 1
return d
text = " the CAT, the dog! "
words = tokenise(clean(text))
tally = count(words)
print(words)
print(tally["the"] == 2, tally.get("CAT,"))
# expect: ['the', 'CAT,', 'the', 'dog!']
# expect: True 1
Trace (dry run). clean removes the doubled spaces -> 'the CAT, the dog!'. tokenise splits -> four tokens. count gives the:2, CAT,:1, dog!:1. Note punctuation clings to tokens - real pipelines add a punctuation-stripping stage (lecture 10's normalisation).
Expected output. the:2, CAT,:1, dog!:1 (punctuation shows why cleaning rules matter)
Edge cases. Empty string: clean gives '', tokenise gives [''] - one empty token! A production tokenise returns [] for empty input. This off-by-one is a classic pipeline bug.
Complexity. O(n) total; the pipeline adds no cost, only clarity.