Worked Examples — Lecture 05

Each example below follows the same arc: problem, analysis, algorithm, pseudocode, then Python where the lecture has introduced it. Python blocks are machine-verified; the comment lines # expect: match the actual output. Edge cases and complexity close each example - they are part of the answer, not decoration.


1. The pager schedule as a cycle (case cs-017)

Problem. On-call duty rotates among 5 people daily; person 1 is on call on day 1. Who is on call on day 47? And what changes if rotation skips weekends (day 1 = Monday)?

Analysis. The plain rotation is a cycle of length 5: day n maps to ((n - 1) mod 5) + 1. The minus-one/plus-one shifts keep person 1 on day 1; forgetting them is the classic off-by-one. The weekend variant needs a second model: count only the weekdays before day n, then apply the same cycle formula to that count.

Algorithm.

  1. subtract 1 from the day number (convert to a 0-based cycle position)
  2. take the remainder mod 5
  3. add 1 back
  4. weekend variant: weekdays = weeks * 5 + min(remainder_days, 5), then reuse the cycle formula

Pseudocode.

FUNCTION on_call(day) RETURN ((day - 1) MOD 5) + 1

FUNCTION on_call_weekdays(day) (weeks, rem) <- DIVMOD(day - 1, 7) weekdays <- weeks * 5 + MIN(rem, 5) RETURN (weekdays MOD 5) + 1

Trace (dry run). Day 47: (47 - 1) mod 5 = 46 mod 5 = 1, so person 2. Weekend variant: divmod(46, 7) = (6, 4), so weekdays = 30 + 4 = 34; 34 mod 5 = 4, so person 5. The reference code prints 2 then 5.

Expected output. 2 then 5

Edge cases. Day 1 itself must return person 1 (the -1/+1 discipline). Day 0 and negative days are outside the spec - say so. If day 1 were a Wednesday the weekday count needs an offset; the assumption 'day 1 is Monday' must be written down.

Complexity. O(1) for both variants - arithmetic beats simulating day by day.

2. Digits, sums, and the divisible-by-3 rule (case cs-018)

Problem. Peel the digits of 4723 by arithmetic and sum them. Is 4723 divisible by 3?

Analysis. Peeling: n mod 10 is the last digit; n div 10 removes it. Repeat until n reaches 0. The digit sum doubles as the divisibility rule: a number is divisible by 3 exactly when its digit sum is.

Algorithm.

  1. total <- 0
  2. while n > 0: total <- total + (n mod 10); n <- n div 10
  3. return total

Pseudocode.

FUNCTION digit_sum(n) total <- 0 WHILE n > 0 total <- total + (n MOD 10) n <- n DIV 10 RETURN total

Trace (dry run). 4723: digit 3, n becomes 472. 472: digit 2, n 47. 47: digit 7, n 4. 4: digit 4, n 0. Sum 3 + 2 + 7 + 4 = 16. 16 mod 3 = 1, so not divisible by 3.

Expected output. 16 then False

Edge cases. n = 0 must return 0 (the loop never runs). Negative numbers: the spec covers n >= 0, or take the absolute value first - either is fine if stated. Leading zeros do not exist in this model: the digit sum of 10^k is 1 for any k.

Complexity. O(d) where d is the digit count (about log10 of n) - logarithmic in the value, which surprises students.


Python companion. The digit-peel loop from today's staircase, executing:

n = 4723
total = 0
while n > 0:
    total += n % 10
    n //= 10
print(total)
# expect: 16