Worked Examples — Lecture 03
Each example below follows the same arc: problem, analysis, algorithm, pseudocode, then Python where the lecture has introduced it. Python blocks are machine-verified; the comment lines # expect: match the actual output. Edge cases and complexity close each example - they are part of the answer, not decoration.
| Example | Case | Python? |
|---|---|---|
| 1. Rain or shine: decisions to diamonds | cs-010 | no |
| 2. The ATM loop, arrows and all | cs-009 | no |
| 3. Dispatch loop: proving termination | cs-011 | no |
| 4. Guess and check as a loop | cs-012 | no |
1. Rain or shine: decisions to diamonds (case cs-010)
Problem. Picnic decision: go if temperature is 18-28 and no rain; if rain but warm, go with a tent; otherwise cancel. Flowchart it, then trace three days.
Analysis. Extract decisions first: 'is t in [18, 28]?' (two comparisons), 'is it raining?' (one diamond). Structure the two diamonds so both exits are used - a common draft leaves the 'warm and raining' path dead.
Algorithm.
- diamond 1: warm? (18 <= t <= 28)
- diamond 2 (if warm): raining?
- rain → tent; dry → go; cold → cancel
Pseudocode.
READ t, raining
IF 18 <= t <= 28 THEN
IF raining THEN WRITE "go with tent"
ELSE WRITE "go"
ELSE WRITE "cancel"
Trace (dry run). (24, dry) → go. (24, rain) → tent. (15, dry) → cancel. Each trace follows named arrows.
Expected output. go / go with tent / cancel
Edge cases. t = 18 and t = 28 exactly (both 'warm' - boundary convention stated); t = 28.5 (cancel - even though 'nearly warm'); the dead-branch draft where rain is checked before warmth.
Complexity. Constant; the lesson is diamond wiring, not cost.
2. The ATM loop, arrows and all (case cs-009)
Problem. Cash machine: allow withdrawals while the balance lasts and at most 3 per session; refuse amounts over balance without ending the session.
Analysis. Two loop conditions (balance sufficient, count < 3) combine into one WHILE with AND - and the flowchart shows why: the loop-back arrow must carry both checks. Termination: session count strictly increases to 3.
Algorithm.
- count <- 0
- while count < 3: read amount; if amount <= balance: pay, count += 1; else refuse (no count change)
- print balance and session end
Pseudocode.
count <- 0
WHILE count < 3
READ amount
IF amount <= balance THEN
balance <- balance - amount
count <- count + 1
ELSE WRITE "refused"
WRITE balance
Trace (dry run). balance 100, requests 40, 90, 30: 40 ok (count 1), 90 refused, 30 ok (count 2). Loop ends by count, balance 30.
Expected output. refused / balance 30
Edge cases. Refusals must not consume the count (a classic draft bug); exact balance withdrawal to 0; three refused requests in a row - loop still ends (count never moves; termination is by count, not by success).
Complexity. O(requests). The flowchart question: draw where the 'refused' arrow re-enters.
3. Dispatch loop: proving termination (case cs-011)
Problem. A dispatch system processes queued jobs; every processed job may enqueue 0-2 smaller sub-jobs. Flowchart the loop and argue it terminates.
Analysis. Loop: while queue non-empty, take one job, process it, enqueue its sub-jobs. Naive reading suggests it may never end; the resolution: each sub-job is strictly smaller (bounded size), so total work is finite. In the flowchart the argument is concrete: the 'queue length' counter can rise, but the 'remaining size budget' strictly falls.
Algorithm.
- while queue non-empty and size budget > 0
- take job; process; enqueue sub-jobs with smaller sizes
- decrease budget by the job's size
Pseudocode.
WHILE queue not empty
job <- take first
PROCESS job
FOR each sub in subjobs(job)
IF size(sub) < size(job) THEN enqueue sub
budget <- budget - size(job)
WRITE "all dispatched"
Trace (dry run). Queue [J1(4)]: process J1, enqueue J1a(2), J1b(1). Process J1a (no subs), then J1b. Queue drains; budget 4 → 2 → 0.
Expected output. all dispatched
Edge cases. A job with no sub-jobs (leaf); a sub-job equal in size (refused by the guard - otherwise infinite); empty initial queue (loop never runs). The termination argument is the deliverable.
Complexity. O(total size). This is the first occurrence of 'the loop ends because something provably shrinks'.
4. Guess and check as a loop (case cs-012)
Problem. Number game: the program holds a secret 1-50; the player guesses; feedback 'higher'/'lower'/'correct'. Flowchart the game loop including a maximum of 7 guesses.
Analysis. Loop with three exits (win, out of guesses, continue). The flowchart forces clarity: which diamond owns each exit. The strategy discussion (halving) is deliberately saved for lecture 21; today the loop structure is the point.
Algorithm.
- tries <- 0
- while tries < 7 and not correct: read guess; compare; give feedback; tries += 1
- win or lose message
Pseudocode.
tries <- 0
WHILE tries < 7
READ guess
IF guess = secret THEN WRITE "correct"; STOP
ELSE IF guess < secret THEN WRITE "higher"
ELSE WRITE "lower"
tries <- tries + 1
WRITE "out of guesses"
Trace (dry run). secret 23, guesses 10 (higher), 40 (lower), 23 (correct) on try 3 - loop exits early via the STOP arrow.
Expected output. higher / lower / correct
Edge cases. Guess outside 1-50 (invalid - re-ask or count it? state the rule); exactly 7 wrong guesses; first guess correct (loop body runs once). The 7-guess guarantee is log2(50) - a teaser for lecture 21.
Complexity. At most 7 feedback rounds by the rules; a halving strategy needs ceil(log2(50)) = 6.
Python companion. Optional preview - today's rain-or-shine diamond logic as decisions:
rain = True
tent = False
if rain:
if tent:
print("go with tent")
else:
print("cancel")
else:
print("go")
# expect: cancel