Assignment 3 — Cost and Model (Block III)
Due: week 22 · Weight: see assessment plan · Covers LO7, LO8 · Submit code + report.
This assignment has two halves: measure what an algorithm costs, and model a messy situation with mathematics you can defend. Every claim needs arithmetic or a run behind it.
Part A — Measuring cost (10 marks)
A teammate proposes three ways to answer "did any student score exactly the class average?" on a list marks of n integers:
V1: compute the average once, then scan the list for it.V2: for each element, recompute the average of the whole list and compare.V3: sort a copy, binary-search for the average.
Tasks
(a) State, with n-expressions, the number of element-visits for each version (count the average's computation and the scan separately). (3) (b) Time V1 and V2 empirically at n = 1,000 and n = 10,000 (use lists of even numbers so the average is an integer; report both timings and the ratio). Do your measurements agree with (a)? (4) (c) The average being searched for may not exist in the list. Give one concrete list where V3's binary search is incorrect unless the list was sorted first, and explain the fix V3 already contains. (2) (d) One sentence: which version would you ship, and what would change your mind? (1)
Part B — Modelling a waiting list (10 marks)
The campus clinic runs a walk-in slot of exactly 120 minutes. Patients arrive with consultation needs of 15, 20, or 30 minutes. The nurse sees patients in arrival order and stops when the next patient cannot fit in the remaining time (that patient is referred to tomorrow).
Tasks
(a) Model the day: define the state (remaining minutes), the decision, and the stopping rule, precisely enough to trace by hand. (3) (b) Trace your model on arrivals [15, 20, 30, 20, 15, 30]. Show the remaining time after each decision. Who is referred? (3) (c) The clinic proposes: "serve the shortest consultation first". On the same arrivals, does the reordering serve more patients? Show the trace. Is reordering fair? One sentence each. (3) (d) Name one input where no ordering serves more patients than arrival order — or argue none exists. (1)
Submission checklist
- Part A timings: machine, n values, and raw numbers pasted; ratios shown.
- Part B: traces as tables (arrivals × remaining time).
- Every claim of "this is fair/unfair" is argued, not asserted.
- Length guide: code + 3–5 report pages.