In-Class Activities

Short, no-preparation classroom routines used inside the 2-hour lectures. Each is a repeatable format rather than a one-off — run them with any case study. Instructors: timings and pitfalls are in the linked notes.

ActivityFormatTimeUsed in
Think-Pair-DebugDebug a 6-line snippet8 minany lecture from 05
Case RelayTeams each solve one step12 minlectures 09–20
Sketch That FlowFlowchart under time pressure7 minlectures 01–04, 17
Complexity DuelRank snippets by cost6 minlectures 17–24

Enrichment, not assessment: none of these are graded.