Lab 15 · File Handling and Exceptions
Module 15 · Lectures L29–L30 · Week 15 · 120 minutes · guided/independent 40/60
Prerequisites: completion of Labs 1–14 (Lab 1: none). Bring your laptop with the course toolchain verified (see § 3) and your exercise notebook.
2. Learning objectives
By the end of this lab you can:
- Read/write text files with ifstream/ofstream
- Use getline + istringstream for robust line parsing
- Check stream state and classify failures
- Contrast stream-state error handling with exceptions (try/catch demo)
These deliver the module's outcomes (PF codes in ../../LEARNING_OUTCOMES.md).
3. Required software and compiler
- Compiler contract:
g++ -std=c++17 -Wall -Wextra -pedantic(GCC 13+ via MSYS2/MinGW-w64 on Windows; GCC or clang++ on macOS/Linux — see ../../docs/TOOLCHAIN.md). - Editor: any (VS Code + C/C++ extension recommended; debugger optional until Lab 4).
- Verify before starting:
g++ --version
- Starter files for this lab live in
starter_code/next to this manual; they compile warning-free under the contract (see../../../docs/LAB_AUDIT.md).
4. Relevant theory
ifstream/ofstream, line parsing, failure taxonomy, exception demo — full treatment in the lecture notes; the lab applies it, the lecture explains it.
5. Pre-lab questions
Answer in your notebook BEFORE the session; the TA checks them at entry:
- Which open failure is fatal, and which data line is a skip?
- What does !in test after opening?
- When would try/catch be preferable to return codes?
6. Instructor demonstration (15 min)
The instructor or TA demonstrates: Streams, robust reading, error strategies. Watch for the workflow (how errors are read and fixed), not just the final code. The demo ends with the checkpoints you must hit in § 7.
7. Guided coding tasks
- guided: write-then-read-back a 5-number file
- guided: CSV line parsing with skip-and-report
- independent: sensor-log to summary-report pipeline
- independent: append-mode grade book with read-back report
Checkpoint rule: show each guided result to the TA before moving on. TAs give guidance, not solutions (../../TEACHING_GUIDE.md § 5).
8. Independent programming exercises
Complete the tasks labeled independent in § 7 without step-by-step help. You may consult lecture notes and this manual — not a neighbor's screen. The TA records who completes what.
9. Debugging task
Robustness clinic: 3 fault injections (missing file, bad line, empty file)
Use the five-step debug loop (reproduce, isolate, hypothesize, test, fix-and-verify) and record it in your debug log (../../labs/resources/debug_log_template.md) from Lab 4 onward. Identify the stage of each defect (compile, link, runtime, logic).
10. Test cases
Your program must pass at minimum:
- Boundary values (0, 1, maximum legal input).
- Normal cases from the task descriptions.
- At least one invalid input handled gracefully (from Lab 4 onward).
Record results in the test-evidence table (../../labs/resources/submission_template.md): input, expected, actual, verdict.
11. Expected learning outcomes
After this lab, verified by the checkpoints and your submission, you can reliably read/write text files with ifstream/ofstream; use getline + istringstream for robust line parsing; check stream state and classify failures; contrast stream-state error handling with exceptions (try/catch demo). This maps to the module's PF outcomes and feeds the next lab's prerequisites.
12. Submission requirements
Submit via the course LMS before the start of next week's lab:
- Source file(s) named per the task list (snake_case).
- Test-evidence table (completed template).
- Debug log for the § 9 task (Lab 4 onward).
- Pre-lab answers (photo or scan is fine).
Code must compile warning-free under the course contract — a warning costs the compile check (§ 13).
13. Assessment rubric (10 points)
| Criterion | Points | Evidence |
|---|---|---|
| Pre-lab completed | 1 | notebook check at entry |
| Guided checkpoints | 3 | TA sign-offs during session |
| Independent tasks correct | 3 | code + test evidence |
| Debug task diagnosed (not just fixed) | 2 | debug log with stage + cause |
| Compiles warning-free + naming/format | 1 | build log, file names |
Total 10, scaled to the 10 % course component. Labs 1–15 count the best 12 of 15 (drop-lowest); Lab 16 is graded as the project milestone with the same rubric plus the demo (see the instructor notes).