Ana 20 3.4 Ben 22 2.8 Ana 21 3.9 Cy 20 3.1 Dee 23 3.5 Ana 19 3.6 Eli 300 2.0 Fay 21 3.8 Gus 22 4.1 Hal 20 2.9 Joy 22 3.3 Ivy 21 three