Exercises · T08 searching sorting
Covers: linear and binary search, sort algorithms (selection, bubble), sorted-array workflows, comparison counting, complexity observation. Lectures L23–L24. Outcomes PF-12.x.
11 exercises · ladder 🟢 → 🔴.
PF-E-091 · Linear Search (with sentinel)
Difficulty: Beginner · Lecture: L23 · Outcomes: PF-12.1 Prerequisites: E-069 Problem: Read n (1–20), n integers, then a sequence of keys terminated by -1. For each key print its first position or not found. Input: n, values, keys… −1 · Output: one line per key. Sample: values 5 7 5 9, keys 5 9 2 -1 → 0 / 3 / not found Hints: reuse ONE search function per key; first occurrence wins.
PF-E-092 · Count Comparisons (linear)
Difficulty: Beginner · Lecture: L23 · Outcomes: PF-12.1, PF-12.4 Prerequisites: E-091 Problem: Like E-091, but the search also counts comparisons. Print position and comparison count for each key, then print the theoretical best/worst for n. Input: as E-091 · Output: per-key results + theory line. Sample: n=4, key at index 2 → 2 (3 comparisons) / theory: best 1, worst 4 Hints: a long long& counter parameter (L23's harness).
PF-E-093 · Is It Sorted?
Difficulty: Beginner · Lecture: L23 · Outcomes: PF-12.2 Prerequisites: E-092 Problem: Read n (1–20) then n integers. Print ascending, descending, or unsorted. Equal neighbors are allowed in both sorted orders. Input: n + values · Output: one verdict. Sample: 4 9 7 7 2 → descending Hints: track violations of each order; both-zero means constant → call it ascending.
PF-E-094 · Binary Search on Sorted Input
Difficulty: Foundational · Lecture: L23 · Outcomes: PF-12.1, PF-12.2 Prerequisites: E-093 Problem: Read n (1–20) then n ascending integers, then keys terminated by -1. Binary-search each key; print position or not found. If the input isn't sorted, print input not sorted and refuse to search. Input: n + sorted values + keys · Output: per-key result. Sample: values 2 4 6 8, key 6 → 2 / key 5 → not found Hints: reuse E-093's check as the precondition gate; low + (high-low)/2.
PF-E-095 · Selection Sort with Snapshots
Difficulty: Foundational · Lecture: L24 · Outcomes: PF-12.2, PF-12.3 Prerequisites: E-094 Problem: Read n (2–15) then n integers. Selection-sort the array, printing the array after every pass, plus final comparison and swap counts. Input: n + values · Output: n−1 snapshots + counts. Sample: 5 5 2 9 1 7 → pass lines ending 1 2 5 7 9, comparisons: 10, swaps: 3 Hints: swap only when minIdx != i — the swap count can be less than the pass count.
PF-E-096 · Bubble Sort with Early Exit
Difficulty: Foundational · Lecture: L24 · Outcomes: PF-12.2, PF-12.3 Prerequisites: E-095 Problem: Same I/O as E-095 but bubble sort with the swapped-flag early exit. On already-sorted input demonstrate: 1 pass, n−1 comparisons, 0 swaps. Input: n + values · Output: snapshots + counts. Sample: 4 1 2 3 4 → passes: 1 / comparisons: 3 / swaps: 0 Hints: reset the flag at the top of each pass; break when a pass is clean.
PF-E-097 · Sort Then Binary Search (full workflow)
Difficulty: Intermediate · Lecture: L24 · Outcomes: PF-12.2, PF-12.1 Prerequisites: E-096 Problem: Read n (5–30) then n integers (any order) and one key. Sort with your selection sort, print the sorted array, then binary-search the key, printing the position in the original array (map positions through the sort). Input: n + values + key · Output: sorted array + original index. Sample: 5 9 1 7 3 5 key 7 → sorted 1 3 5 7 9 / 7 was originally at index 2 Hints: sort a parallel index array alongside the values — every value swap moves both.
PF-E-098 · Median and Quartiles
Difficulty: Intermediate · Lecture: L24 · Outcomes: PF-12.2, PF-3.2 Prerequisites: E-097 Problem: Read n (4–20) then n integers. Sort them, then print the median (mean of two middles for even n, 1 decimal) and the lower/upper quartile (medians of the lower/upper halves). Input: n + values · Output: three numbers. Sample: 6 3 1 9 7 5 11 → sorted 1 3 5 7 9 11 / median: 6.0 / Q1: 3 / Q3: 9 Hints: index arithmetic on the sorted array; halves exclude the overall median for odd n.
PF-E-099 · Deduplicate (sorted)
Difficulty: Intermediate · Lecture: L24 · Outcomes: PF-12.2, PF-9.3 Prerequisites: E-098 Problem: Read n (1–30) then n integers. Sort, then remove duplicates in place (two-finger compaction on the sorted order). Print the unique count and the deduplicated array. Input: n + values · Output: count + array. Sample: 7 4 1 4 9 4 1 7 → unique: 4 / 1 4 7 9 Hints: in sorted order, duplicates are adjacent — a single pass suffices.
PF-E-100 · Frequency Sort (two-key ordering)
Difficulty: Advanced Introductory · Lecture: L24 · Outcomes: PF-12.2, PF-12.3 Prerequisites: E-099 Problem: Read n (1–30) then n integers (values 0–99). Print each distinct value sorted by descending frequency, ties broken by ascending value, with counts. Input: n + values · Output: value:count lines. Sample: 8 2 2 9 2 9 1 2 9 → 2:4 / 9:3 / 1:1 (1 before... actually 1:1 last) Hints: count into a 100-slot table, then selection-sort the distinct values by (count desc, value asc).
PF-E-101 · Search Strategy Showdown
Difficulty: Advanced Introductory · Lecture: L24 · Outcomes: PF-12.1, PF-12.4 Prerequisites: E-100 Problem: Read n (100–2000, sorted input guaranteed) and k (10–50) keys. For the whole key set, compare total comparisons: (a) linear search for each key; (b) selection-sort (0 — already sorted) + binary search for each key. Print both totals and a one-line verdict explaining when sort+binary wins. Input: n + n sorted values + k + k keys · Output: two totals + verdict. Sample: n=1000, k=20 → linear: 20000 / sort+binary: ~200 / verdict: binary wins when k << n Hints: reuse E-092 and E-094 counters; the break-even point is the L24 cost-model lesson.