Programming Fundamentals Using C++

Case Studies · Data Science

Eight supplementary case studies for BS Data Science sections, in the same 5-minute think → discuss → reveal format as the main bank (by_tier/). Numbering uses the PF-DS-CS prefix so the main bank's PF-CS-001…108 stays contiguous. Worked discussion guides live in the instructor area only (../instructor/case_studies/ds_solutions.md).


PF-DS-CS-1 · The Billion-Row Mean


PF-DS-CS-2 · One Missing Sensor Beat the Mean


PF-DS-CS-3 · The Two-Median Trick


PF-DS-CS-4 · The Frequency Table That Lied


PF-DS-CS-5 · Skip, Repair, or Abort?


PF-DS-CS-6 · Percentile by Hand


PF-DS-CS-7 · The Simulation That Looked Rigged


PF-DS-CS-8 · The Report That Could Not Be Rebuilt

Programming Fundamentals Using C++ · C++17 · 16 weeksBack to top ↑