Challenges — 15 problems

← Module home · ★ to ★★★★. Each has a separated approach — choose the container and justify the choice in one sentence before building. The justification is half the deliverable.


Approaches and solutions

A1. Set-version: unordered_set<string> seen; vector<string> out; for (...) if (seen.insert(s).second) out.push_back(s); — O(n), arrival order. Sort-version: sort(v); v.erase(unique(v.begin(), v.end()), v.end()); — O(n log n), and it destroys arrival order (output is sorted) — unique only squeezes adjacent duplicates, which is why the sort precedes it. The preserved/lost pair is the answer.

A2. Full sort: sort(v.begin(), v.end(), greater<int>()); then print the first 3 — O(n log n). Heap: push all, pop thrice — O(n + k log n). When k ≪ n the heap wins by skipping the full ordering; the phrase “top-k under a sort” is the classic interview tell.

A3. map<size_t, int> hist; for (const string& w : words) hist[w.size()]++; — the [] here is deliberate insert-or-increment (the one place the mutating lookup is the right tool — D1’s rule, stated with its exception); the loop prints lengths ascending, free.

A4. unordered_set<string> inB(b.begin(), b.end()); then A-only = !inB.count(x); build inA symmetrically; both = both tests. For alphabetical output: collect the three result vectors and sort them — the computation stays hash-speed; the presentation pays one sort (D3’s fix pattern).

A5. Key = the word’s letters sorted: string k = w; sort(k.begin(), k.end()); group[k].push_back(w); — trace: eilnst → {listen, silent, enlist}; eggloo → {google, gooogle}. The insight worth stating: canonicalization by sorting turns an equivalence question into an exact-key lookup — the same trick as normalizing roll numbers or lowercase names.

A6. Invariant: low (max-heap) holds the smaller half; high (min-heap) holds the larger half; sizes differ by ≤ 1. Arrive → push into the correct half → rebalance by moving one top across. Median = low.top() (odd total) or the average of both tops (even). The min-heap side needs the reversed comparator (greater<int> or a lambda) — D8’s convention, load-bearing this time.

A7. Walk with an index; openers push the expected closer and the index (a stack<pair<char,int>>); on a mismatch/empty-pop/unmatched-tail, the stored index names the first offender. The LIFO rule still is the nesting rule — the index only localizes the confession.

A8. for (const auto& [item, qty] : b) merged[item] += qty; — insert-or-accumulate; conflicts log via a pre-check if (merged.count(item)). Low-stock: copy pairs to vector<pair<string,int>>, sort with a quantity-ascending lambda — the map cannot be sorted because its order is the key order (its structure); reordering it means a different container, so the report pays a copy (D3/D8’s principle: the container’s fixed order is a feature until it isn’t).

A9. count_if ×2 with lambdas (>= 50), min_element/max_element with the end() guard, accumulate(..., 0LL) seeded for the sum, map<char,int> histogram via a grade function — five algorithms, one pipeline; the whole report is ~20 lines with zero index arithmetic.

A10. stack<string> states; — type pushes the pre-change state (or the post-change; pick and document), undo pops into the current. Redo: a second stack that undo pushes onto and that any new type clears (the classic redo-validity rule). Cost: O(state size) per operation — the cap policy (bounded depth, drop oldest) is where a deque-backed structure would enter; state it as the next step.

A11. map<int, queue<string>> tasks; — add: tasks[priority].push(task); (the mutating [] again the right tool — bucket creation is the intent); next(): walk the map from rbegin() (highest priority first — the sorted pair paying its dividend), serve that queue’s front, erase empty buckets. Trace: serves highest-priority-oldest, exactly the scheduler contract.

A12. The deque<int> window holds indices; maintain two invariants while sliding: indices within the window, and their values strictly decreasing (front = current max). Each element: pop-back while smaller, push, pop-front when out of window, then report nums[front]. Every index enters and leaves once — O(n) total vs the naive O(n·k) window rescans. (The hard one of the set; the two invariants written down first are the difference between a sketch and a solution.)

A13. Honest scoring against the choice table: next()-with-wrap and remove-while-iterating are list’s genuine wins (stable iterators, O(1) erase); but if the playlist is read-mostly and small, a vector + index arithmetic serves identically. The defensible verdict: list earns its place here only because of erase-while-iterating — and the paragraph should say that rather than chant “linked list for playlists.”

A14. Query design: unordered_map<string,int> counts; per query, copy pairs → vector<pair<string,int>> → sort with (count desc, key asc) lambda → print top 3. O(n log n) per query — fine until queries dominate. The graduation: set<pair<int,string>, custom> maintaining the top candidates as counts change (erase old pair, insert new on each increment) — O(log n) per update, O(1)-ish per query; the trade flips when query count exceeds update count. Stating when the flip happens is the ★★★★ part.

A15. The wrapper: template <typename T> class Box { vector<T> data; public: void add(const T& x) { data.push_back(x); } const T& at(int i) const { return data.at(i); } int size() const { return (int)data.size(); } const T* max() const { if (data.empty()) return nullptr; return &*max_element(data.begin(), data.end()); } }; — roughly fifteen lines, every operation delegated. The paragraph: hand-rolling (the Generics module’s Box) taught what the operations cost and what contracts they need; the wrapper is the right call when you want a narrower or renamed interface over the library’s general one — encapsulation at container scale, and the honest end of the course’s Box arc.


Where next

— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor